SAFEGUARDS INFORMATION-J A N 2 21986 Florida Power and Light Company ATTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P.O. Box 14000 Juno Beach, Florida 33408 Gentlemen:
SUBJECT:
DOCKET NOS. 50-335 AND 50-389 This acknowledges the receipt of your letter of December 13, 1985, which transmitted Revision 10 to the St. Lucie Physical Security Plan.
Our review of the changes has found portions of the changes to be consistent with~
the provisions of 10 CFR 50.54(p).
One portion is not consistent with the provisions. of 10 CFR 50.54(p) as delineated in the enclosure to this letter.
This was discussed between Mr. F. Faber of your staff and Ms. O. Masnyk of the Region II ' staff on January 9, 1986.
To preclude a violation of regulatory requirements, you must not continue to implement the change deemed inconsistent.
Please revert to the commitment in your previously approved plan, or, if desired, modify your plan to accommodate the enclosed comments and resubmit a corrected plan page as necessary to maintain plan continuity.
Should you wish to pursue those changes deemed inconsistent, you must submit a request-to the Commission, Office of Nuclear Reactor Regulation, under the provisions of 10 CFR 50.90 for amendment to your license.
The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21; 1
The material enclosed herewith'contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section.147 of the Atomic Energy Act of ' 1954, as amended.
Therefore, the enclosure will be not be placed in the Public Document Room.
Should you have any questions concerning this letter, we.will be glad to discuss them with you.
Sincerely, 8601280011 860122 PDR ADOCK 05000335 F
PDR g
Roger D. Walker, Director 1 01 Division of Reactor Projects F
1
Enclosure:
i O Inconsistent Changes t
(Safeguards Information)
ENCLOSURE CONTAINS (S
"' e 2)
SAFEGUARDS INF
"" " "'"^"^ "ORMATION SAFEGOARDS INFORMAIlOM' PAGE IS DECONTROLLED.
,--r, y
g-y
1 i
. SAFEGUARDS INFORMATION-l Florida-Power and Light Company 2
J AN 2 21986 cc w/ encl:
K. N. Harris, Vice President St. Lucie Nuclear Plant P. O. Box 128 Ft. Pierce, Florida 33454 D. A. Sager, Plant Manager St. Lucie Nuclear Plant P.
0.~ Box 128 Ft. Pierce, Florida 33454 cc w/o encl:
Harold F. Reis, Esq.
Newman & Holtzinger 1615 L Street, N.W.
Washington, DC 20036 Norman A. Coll, Esq.
McCarthy, Steel, Hector and Davis 14th Floor, First National ~ Bank Building Miami, Florida 33131 U. S. Environmental Protection Agency Region IV Regional Radiation Representative 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Attorney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32304 Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida' 2600 Blair Stone Road Tallahassee, Florida,32301 cc w/o encl:
(Continued see page 3)
ENCLOSURE CONTAINS SAFEGUARDS INFORMATION SAFEGUARDS INFORMMION, UPOW GEPARATIoM THIS
, ice IS occo,rno!.I.so.
SAFEGUARDS INFORMATION-Florida Power and Light Company 3
gggg g cc w/o encl: (Continued)
State Plenning and Development Clearinghouse Office of Planning and Budgeting Executive Office.of the Governor The Capitol Building Tallahassee, Florida 32301 Weldon B. Lewis County Administrator St. Lucie County-2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Charles B. Brinkman Washington - Nuclear Operations Combustion Engineering, Inc.
4 7910 Woodmont Avenue Bethesda, Maryland 20814 Jack Schreve Office of the Public Counsel i
Room 4, Holland Building Tallahassee, Florida 32304 Coordination and Review i
Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 bcc w/ enc 1:
Chief, Safeguards Power Reactor. Licensing Branch, NMSS, 881-SS i
Chief, Standardization and Special Projects Branch, NRR, 340-P Region II Licensing File (50-335),
(389), TAB 2 bec w/o enc 1:
NRC Resident Inspector Document Control Desk (RG01), 42-P State of Flo'rida
)
R I
T R
I' RI R
0 snyk:1b erny ujre rr JPS r
SElrod V.r:wr.1:e 01/)$/86 01//f/86 01/p/86 01/Zj/86 01/p/86 Olb]/86 01/2f/66 ENCLOSURE CONTAINS t
SAFEGUARDS INFORMATION 8"* mans =0aNur0n IJPON SEPAR. *,1og yggg PAGE IS DECONTROI.I.ED, I-
_ _ _ _ -.,,,,.., _ _ _.., _.. _ _ _,, _. ~, _ _, _ _ -,,.. _,.. _.. _.... _
_