ML20137K176
| ML20137K176 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 03/24/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20137K180 | List: |
| References | |
| EA-97-032, EA-97-32, NUDOCS 9704040260 | |
| Download: ML20137K176 (2) | |
See also: IR 05000263/1996009
Text
.- _
.
-
_
__
_ ..
.
_ . - _ . _ _ . _ _ . _ _ _ .
__ _ _ _ _
___
!
4
i
!
!
March 24, 1997
i
1
!
EA 97-032
.
Mr. M. D. Wadley
i
Vice President, Nuclear Generation
i
Northern States Power Company
'
414 Nicollet Mall
3
Minneapolis, MN 55401
l
SUBJECT:
CORRECTIONS TO NRC SYSTEM OPERATIONAL PERFORMANCE
!
INSPECTION (SOPI) REPORT 50-263/96009(DRS), PAGES 23,39,
50 AND 51
i
j
Dear Mr. Wadley:
?
1
The NRC is reissuing four pages of inspection report 50-263/96009, which was
'
transmitted to you on February 20,1997,in order to correct errors in the report.
Page 23 was corrected to reflect that safety review item SRI-96-016, "1996 FOl
j
Identified USAR Changes," Revision 0, Addendum 4, dated October 23,1996, did not
make changes to the containment boundary, as originally stated in the report.
l
Page 39 was corrected to reflect that proprietary documents were reviewed during the
inspection, as indicated in the list of documents reviewed (pages 43-59). Additionally,
a few documents were not properly characterized as being proprietary; pages 50 and 51
were corrected to accurately reflect their clasrification.
,
Please replace the affected pages of the inspection report with the enclosed pages. I
regret any inconvenience this situation may have caused you, if you have any questions,
- -
please contact Patricia Lougheed of my staff at (630) 829-9760.
1
1
.,
l
1
'
(
.
I
9704040260 970324
ADOCK 05000263
i
G
\\
a
e
A
d
.
- --. ; - - - --- - -.-
-..-.
.- _ _.- - - - -.
-
I
'
i
M. D. Wadley
2
March 24,199'/
)
j
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
'
and its enclosure will be placed in the NRC Public Document Room.
I
1
Sincerely,
/s/ M. Leach (for)
i
Geoffrey E. Grant, Director
Division of Reactor Safety
i
Docket No. 50-263
,
f
Enclosure:
Revised Pages 23,39, 50, & 51 to
inspection Report 50-263/96009(DRS)
i
!
.
cc w/ encl:
Plant Manager, Monticello
John W. Ferman, Ph.D.
Nuclear Engineer, MPCA
!
State Liaison Officer, State
,
of Minnesota
,
Distribution:
Docket File w/ encl-m
SRis, Montice!'o
CAA1 w/enci
I
g!UBUClE01 w/es M
Prairie island w/enci
J. Lieberman, OE w/enci
OC/LFDCB w/ encl
LPM, NRR w/ encl
J. Goldberg, OGC w/enci
-
DRP w/ encl
A. B. Beach, Rill w/enci
R. Zimmerman, NRR w/ encl
1
DRS w/enci
C. D. Pederson, Rlll w/enci
Rlli PRR 'w/ encl
Enf. Coordinator, Rlli w/enci
DOCUMENT NAME: G:\\DRS\\ MON 96009.COR
To receive a copy of this document. Indicate in the box: "C" = Copy w/o attachment /gnolosure "E" = Copy with attachment / enclosure *N" = No copy
0FFICE
Rill:DRS
l@
Rill:DRS
lA. Rill:DRP/wD\\l
Rill:EICS l#
RllI:DRS
l/V
NAME-
Lougheed/kjc ML
Ring R 94 w WacobsoF '
C1ayton
f%
Leach / Grant * m
DATE
03/24/97
03/ N /97
' 03/ u /97
03/ z# /97
03/.M./97
~'
0FFICIllt. RECORD COPY