JM 141986
Docket / License:
50-213/DPR-61
Connecticut Yankee Atomic Power Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Resident Inspection 50-213/85-21 (10/16/85-12/02/85)
This transmits the findings of the routine NRC inspection of the Haddam Neck Plant
on October 16 - December 2, 1985.
These findings have been discussed with Mr.
R. Graves of your staff.
This inspection cited, as a violation, multiple instances of failure to conform
to the requirements of your administrative control procedures. While these speci-
fic failures did not result in any actual adverse plant operating conditions, we
are concerned that they may be indicative of a lack of concern for procedure ad-
herence on the part of the facility staff.
Therefore, in addition to your reply
to the individual violations, please include your evaluation of the effectiveness
of your quality assurance program in assuring conformance with its implementing
procedures and describe your plans for improving that conformance overall.
Also,
in regard to Violation Citation 1.f, please address the failure to change surveil-
lance procedures as necessitated by design changes as that relates to the effec-
tiveness of your corrective actions on the reactor cavity seal failure and the
associated December 1984 NRC Order.
The second violation cited was for failure to adequately correct a problem with
overdue procedure reviews.
This item is worth particular note because it is for
inadequate correction of an identified problem.
-
We also wish to call Report Detail 6.4 to your attention.
This item deals with
apparent interaction between steam flow measurement channels.
Although the cor-
rective action described does address the problem symptom, we did not find that
the root cause and its implications have been identified.
Your cooperation with us is appreciated.
Sincerely,
cr...h..
31 sad 37.8.
Edward C. Wenzinger, Chief
8601230 g S h 213
Projects Branch No. 3
DR
A
Division of Reactor Projects
l
l
.rs/
. _ _ _ ,
,
.
,
JAli ' 4 E3
-
'
Connecticut Yankee Atomic Power Company 2
Enclosures:
1.
Appendix A, Notice of Violations
2.
NRC Region I Report 50-213/85-21
cc w/encis:
R. Graves, Plant Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
E. J. Mroczka, Vice President, Nuclear Operations
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc w/encis:
Region I Docket Room
DRP Section Chief
M. McBride, RI, Pilgrim
J. Shedlosky, SRI, Millstone 1 & 2
T. Rebelowski, SRI, Millstone 3
F. Akstulewicz, LPM, NRR
J. Durr, RI (esp. Detail 4.1)
C. Anderson, RI (esp. Detail 4.5)
J. Wiggins, RI (esp. Detail 4.1)
M. Shanbaky, RI (esp. Detail 6.3)
>
DRP:RI
DRP:RI
D
Q)b b
4A b
Swetla6d/meo
McCabb
W zjnger
1/7/86
i[.[w
I jfIg
it../a
1
0FFICIAL RECORD COPY