ML20137J419

From kanterella
Jump to navigation Jump to search
Discusses 860108 Meeting at Region IV Ofc Re Facility & Program Status & Planning.List of Attendees & Viewgraphs Used by Util Encl
ML20137J419
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/16/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8601220479
Download: ML20137J419 (9)


Text

. _ _

'g o r )

JAN 161986

  1. /
  • In Reply Refer To:

Docket: 50-382 Louisiana Power'& Light Company ATTN:

R. S. Leddick, Sr. Vice President Nuclear Operations 142 Delaronde Street

-New Orleans, Louisiana 70174 Gentlemen:

This refers to the meeting conducted at Mr. Leddick's request in the.NRC Region IV office on January 8, 1986. This meeting related to activities au'.horized by NRC License No. NPF-38 for Waterford 3 Steam Electric Station.

The subjects discussed at this meeting generally involved facility and program status and planning. A copy of a handout used by LP&L during the meeting and a list of, attendees is enclosed.

It is our opinio.. that this meeting was beneficial and has provided a better

. understanding of plant status and planned activities at Waterford, e

1 In'accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

e Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, oith:1s y.d By E. H. Johnson E. H. Johnson, Acting Director Division of Reactor Safety and Projects

Enclosures:

As stated cc w/ enclosures:

(cont on next page)

RI :

B/C RPB DRSP M

' stable /1k JEGagl do EHJohnsoti GL i

I /p /86 1/q /

y(/86 9601220479 860116 ADOCK 0 % g 2 DR l

i g

i i

4 Louisiana Power & Light Company Louisiana Power & Light Company ATTN:

G. E. Wuller, Onsite Licensing Coor,dinator P. O. Box B Killona, Louisiana 70066 Louisiana Power & Light Company ATTN:

R. P. Barkhurst, Plant Manager P. O. Box B Killona, Louisiana 70066 Middle South Services ATTN:

Mr.' R. T. Lally P. O. Box 61000 New Orleans, Louisiana 70161 Louisiana Power & Light Company ATTN:

K. W. Cook, Nuclear Support and Licensing Manager 142 Delaronde Street New Orleans, Louisiana 70174 Louisiana' Radiation Control Program Director bectoDMB(IE45) bec distrib. by RIV:

RPB Resident Inspector R. D. Martin, RA SectionChief(RPB/C)

DRSP RIV File J

ATTENDANCE LIST Attendance at the LP&L - NRC meeting on January'8,1986, at the NRC Region IV Office:

LP&L L. L. Bass, Project Engineer, EQ R. G. Azzarello, Emergency Planning Manager F. J. Drummond, Nuclear Services Manager R. P. Barkhurst, Plant Manager, Nuclear R. S. Leddick, Senior Vice President, Nuclear Operations D. F. Packer, Training Manager, Nuclear NRC, Region IV G. L. Constable, Chief, Project Section C J. G. Luehman, Senior Resident Inspector J. E. Gagliardo, Chief, Reactor Projects Branch E. H. Johnson, Deputy Director, Division of Reactor Safety and Projects C. A. Hackney, Emergency Preparedness Analyst R. A. Cooley, Chief, Operator Licensing Section D. R. Hunter, Chief, Reactor Safety Branch R. E. Ireland, Chief, Engineering Section P. S. Check, Deputy Regional Administrator 9

.t p.

e.o 1985 1988 1987 l SEP l5'T [NOV lEC J5N l FEin l MAR l APR l MAY _l JUN l JUL,l AUG l SEP l 0CT l NOV l DEC. JAN l FE8 l P'AR l APR lMAY l JUN lJUL l AUG l SEP COPWERCIAL CAPACliY OPERAi!0N MID-CYCLE REFUEL 1 CUTAGE PROJECTIONS FACIOR 9/24/85 0UTAGE 4/16/87 7/28/87 6

57%

3/1/8 6 13/27/86 e

l 3/30/87.

6/21/87 l

fot

_ _ _ _ ___ r

_ i

=

8 2/21/87 5/15/87 P4

'_._ _ _ _ _ _ _ _ _ _ _.i i

i l

'4/13/87 1/20/87

,ox

._ _ _ _ _ _ _ _ _ _i t

i g

11/29/86

' 2/20/87

,o, 10/19/86 7/10/87

[

CURRENT TECH SPEC i

4/15/87*- REQUIRED START _

REFUEL 1 START NUCLEAR OPERATIONS-2/18/87 LPal WATERFORD 3 S.E.S.

DEPARTMENT GOAL

~

OUTAGE PROJECTIONS

)

PLANT PLANNING a SCHEDULING l

l w/m t

I

' BASED ON PRELIMINARY MARCH 86 OUTAGE SCHEDULE

=

1 i

f

  • D' h& si

+.e m,

WATERF0PD 3 SES OPERATION SufEARY DE,CEM.B.,EP.

. - +

26 27; 28;-29.30. 313 n..

w

- - -16.,17~.18 19 20 21 22 23'24 25 3 7. 1:p.5. j'.6 ' Z l

8 3 !10 11 12 13 14 '15-4

.1

'T 120 0 i

t 4

I uNn CAPACITq

[1 j

f TRy ON (DW S'G LJlVEL !

]

/

l

}

OR3)7,/I t

/,0300 TES1 f ; 19 19 i

I L

l 1

3 RK RIP 4

i 100% POWER i

ON)i)- t l

lCPC idD FOR oEl> AIR '

f 8

1301)

I i op.STEMLM Ob i

i 8

4 pqsg32(1 i

I

{

80% POWER ~

I g

I

-.-i 1300 fr00

(

' 18b I

60% POWER 1:'15 i

?

i "0% POWEY I

l RM R PE IUCTlON i

i Re RDuiTI4 m

TO f EPAl t 011 l

3 LEAL, ON M

., A, 1

0; PcWER" FIRUA8l10V i

V.v TESTINi l

j t

l i,

20; POWER" l

0630 C 0;T16 S(NW ON 0 TID i

SfNCF ON GRID 62 1

(1357~

NoE 1 j

j i

i I

I d

CRITICALITY DECIS ION MAD E TO STAY 6

r I

D)WN FOR MAllIT.

)UTA GE I

I I

TIW j lioD" ')

3 l

I 010 CAPACITY FACTOR i

}

( :UNC Fil TER REP _CMN T, I

l l

DIL FEPL( Mt:T IN ICP' s) l l

SINCE i STARTUp P

I 3

C:59ERICAL OPERATION i

200R{P 2B SE nL f AILIED 2042 !

68.48 l

DVRIN3 RE COVE RY s/U

~

] NDE 3 M w Mc. E Ilof STANDBY i l

ED 0)

I C00m 54.87

!!EPL LCE0 Att 4IPCP i

TO)-

e,EAL r, a RTD 122 CD i

THRU 12/31/85 i NDE 4 l P0T SHt:TDOWN "HER90WELL (N#M

"--T 8

ImTLEG %s l

j F' " >

l 1so-g-1158 x

4't a SUToowe li i

Fli L&

vel 4T l ronE 6

! PU UELING J L2.13 4

5. l!6 7

_a 9

in 11 17 1?

14 is is 17..._la lo

?n 71

??

73

?u 75

?s 77

?R 29 30 31 DECEPBER l

i

1 1

3 3

RN

!I' l.

OO l

TI 0

CT e

0 3

AA g

3 1'

l FR a

l 9

E t

YP u

9 2

TO O

2 j.

t i!l ICL l

AA l

8 8

PI8 a4 2

2 AC9 e5 l

CR S

7 E9 1

E 9

7 VM6 P

2 2

I

.I TQ C

l 6

A R

2 AE 6

C 2

6t i

MN e

l c

I 5

QS n

5 2

i 2

S l

42 4

2 32 3

2 2

l!

2 2

l*

2 12 12 02 0

l 2

91 91 81 81 1

71 7

Y 1

S R l

E 9 6

S M

1 6

Y

~1 3

IS R

}

D 9

5 5

M R

WH 1

N R T J

i E A 4

'4 E U "1

T 1

G 3

A 3

1 1

2 2

1 1

11 11 0

1 0

1 9

9 8

8 7

7 6

6 5

5 4

4 3

3 2

2 I

1 R

s R

n I

M P,

E E

u N

W M

w O

o o

Y Y

M D

a T

B D

D F

p O

D T

G I

S a[

g 1

x L

T U

N

)

0 A

P M

U H

O 4

2 I

C 2t h

4H 5S 6L I

I I

T S

EW E

ED E

TI DA ER N

Pt ba Dk O

Oi D

D b

R DT Db P

C PS PC Pi

01/08/86 RPB MAINTENANCE ACTIVITIES I

STATUS OF CIWAS AS OF DECEMBER, 1985 e

1555 OUTSTANDING e

256 OPENED e

834 CLOSED 0

OVERHAUL OF CIWA PROCEDURE G

INCORPORATED THE APPROVED WORK FLOW PATH e

INCORPORATED SIMS PHILOSOPHY WHERE POSSIBLE 9

REORGANIZED AND REFORMATTED 0

EASIER TO USE e

BETTER ORGANIZED 9

EASIER TO UNDERSTAND e

EASIER TO AUDIT

01/08/86 r

RPB-POTENTIAL REPORTABLE EVENT / LICENSEE EVENT REPORT STATUS PRES EVALUATION OUTSTANDING LERS NOVEMBER 1985 7

2 1

DECEMBER 13 4

6 BREAKDOWN OF LERS:

LER NO.

DESCRIPTION DUE DATE 85-049 ACTUATION OF CONTROL ROOM 12/11/85 VENTILATION SYSTEM (HIGH RADIATION CONTROL ROOM OUTSIDE AIR INTAKE SYSTEM)85-050 MISSED FIRE WATCH 01/01/86 85-051 REACTOR TRIP ON INADVERTENT 01/05/86 LOW DNBR 85-052 PROCESS RADIATION MONITOR 01/08/86 (PRM-IRE-5700) WAS OUT OF SERVICE 85-053 CPC FUNCTIONAL TEST PROCEDURE 01/11/86 85-054 LOSS OF OFFSITE POWER 01/11/86 85-055 REACTOR TRIP ON LOW STEAM 01/18/86 GENERATOR LEVEL ESTIMATED 1985 LER TOTAL:

55 LERS ESTIMATED LER TOTAL SINCE FUEL LOAD LICENSE:

57 LERS W330286A

01/{ff86 CURRENT OPERATIONS TRAINING ACTIVITIES 0

TOTAL LICENSES - 38 15 R0 23 SR0 0

TOTAL LICENSE'i IN OPERATIONS - 28 15 R0 13 SRO 8

TOTAL LICENSES LOST SINCE FIRST EXAM - 15 3

R0 12 SRO 8

TOTAL OPERATORS LOST SINCE FIRST EXAM - 11 (3 R0, 8 SRO)

DEPARTED 9

TRANSFERRED 2

0 STARTED NEW MANAGEMENT PLANT CERTIFICATION PROGRAM (J.R. MCGAHA) i b