ML20137J356

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/85-36 on 851201-31.No Violations or Deviations Noted
ML20137J356
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/15/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Walker R
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20137J359 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8601220409
Download: ML20137J356 (2)


See also: IR 05000267/1985036

Text

.-. .

.

.

-

.-

.

.t

JAN 151986

In-Reply Refer To:

Docket: 50-267/85-36

Public Service Company of Colorado

ATTN:

R. F. Walker, President

P. O. Box 840

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Farrell of this office

.during the period December 1-31, 1985, of activities authorized by NRC Operating

. License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the

discussion of our findings with Messers. J. Gahm and R.Craun at the conclusion

'

of-the inspection.

~

' Areas examined during the inspection included operational safety verification,

-licensee. action on previously identified inspection items, NUREG-0737

,

v l'

requirements (Three tiile Island Action Items), engineered safety feature

systems, and new fuel inspection. Within these areas, the inspection consisted

,

of selective examination of procedures and representative records, interviews

,with personnel, and. observations by the inspector. These findings are

documented in the enclosed report.

Within the scope of the inspection, no violations or deviations were

-

identified.

,

We have examined actions you have taken with regard to a previously identified

.

inspection ~ finding. The status of this item is identified in paragraph 3 of

'

the enclosed report.

-,

Should you have any questions concerning this inspection, we will be pleased to

,

discuss them with you.

Sincerely,

Orldnd SI:ned By

J. E. Gagliardo

'

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-267/85-36

cc w/ enclosure: (see next page)

I

.

RIV: SRI $/f[

RPB/A #f/

RPB

//

.(.eREFarrell/ls

JPJaudon

JEGagl iardo

/ //r/86

/ //f/86

//,fjed y

{f.

e60122o4o, 86o11s-

c

gDR

ADOCK 0 % g7

.

.

-

-

-

.

., -

.. .

--

-

-

-.

-- _-_ - - .

__

_

. - .

.:

<

.

.

-

'

'

i'

,,

,

,

. .

,

. . c .

,

,

f

~*

x

,-

u

'

s

Publicl Service Company of Colorado

-2-

-

-

.

.,

3

,

,

.

p: ,

.

J. W. Gahm. . Manager, , Nuclear

. <

.

^

'

, .

Production Division

,

Fort-St. Vrain Nuclear Station

.

'16805 WCR 191/2

Platteville, Colorado

80651

,

,

L. Singleton,: Manager, Quality

Assurance Division

- '

7

(Same Address)

'

,

i t

Co'lorado Radiation Control Program Director

bec distrib. by RIV:

'

  • RPB

R. D. Martin, RA

  • Resident Inspector

DRSP

  • SectionChief(RPB/A) . *RIV File

.

  • Section Chief.(RSB/ES)- *R&SPB
  • RSTS OPERATOR'
  • MIS System
  • RSB

.i

I

7

2

i

$

1

4

- >

,

,

i_

.

'

,

,e

.

.

.

,

s

H

g +

'

,y_,

-

.

. .

.. ... . - - - , . - . - . -

-

-

- - - - - - . . - - -

.

, -

b

1

-