ML20137J136

From kanterella
Jump to navigation Jump to search
Ack Receipt of Rev 14 to Const QA Manual.Rev Continues to Satisfy 10CFR50,App B Requirements & Acceptable.Rev 13 to Operations QA Manual Will Be Reviewed by IE QA Branch
ML20137J136
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/17/1986
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
References
NUDOCS 8601220265
Download: ML20137J136 (1)


Text

JAN 171986 Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:

Thank you for the submittal of your Construction Quality Assurance Manual, Revision 14. We have reviewed the changes and find that the revision continues to satisfy the requirements of 10 CFR 50, A pendix B, Lnd is therefore acceptable.

Also, we acknowledge the submittal of your Operations Quality Assurance Manual, Revision 13, provided in accordance with the requirements of 10CFR50.54(a). Present responsibility for the review of your Operations Quality Assurance Program rests with the IE Quality Assurance Branch.

Please be advised that upon issuance of the Clinton operating license, Region III will assume that responsibility. At that time, submittals of your Quality Assurance Program as required by 10 CFR 50.54(a) should be directed to Region III.

We appreciate your timely submittal of the information required by 10 CFR 50.55(f).

Please contact Mr. Frank Hawkins of my staff (312-790-5555) with any questions you have regarding this matter.

Sincerely, p

V d4uo Carl J. Papefiello, Director Division of Reactor Safety cc: DCS/RSB(RIDS)

Licensing Fee Management Branch i

kesident Inspector, RIII Richard Hubbard Gary N. Wright, Manager Nuclear Facility Safety Jean Foy, Prairie Alliance Mark Jason, Assistant Attorney General, 9601220265 860117 Environmental Control Division PDR ADOCK 05000461 A

PDR H. S. Taylor, Quality Assurance Division G. T. Ankrum, QAB, IE D. Wh eler, IE r

l 9

l RI III RIII RI I R

RFC i

\\

8 0 l

6./mab Hawk' ins Gwynn e es a r ello 01/16/86 76

/ j7 g,