Requests Exemption from 10CFR50.61(b)(1) & (3) Re Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.Pressurized Thermal Shock Not Concern Due to TMI-2 Shutdown Condition.Fee Paid
ML20137J054
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/27/1985
From: Standerfer F, Standerfer R
GENERAL PUBLIC UTILITIES CORP.
To: Snyder B
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-49, REF-GTECI-RV, TASK-A-49, TASK-OR 0310A, 310A, 4410-85-1-174, 4410-85-L-0174, 4410-85-L-174, NUDOCS 8508300124
Download: ML20137J054 (2)


Text

y-

,?

GPU Nuclear Corporation Nuclear

,ome:r8o s

Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8461 4410-85-L-0174 Document ID 0310A August 27, 1985 TMI Program Office Attn: Dr. B. J. Snyder Program Director US Nuclear Regulatory Commission Washington, DC 20555

Dear Dr. Snyder:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 10 CFR 50.61 Exemption Request New rulemaking, promulgated as 10 CFR 50.61, " Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events",

and issued on July 23, 1985, imposes certain requirements on licensees with respect to pressurized thermal shock (PTS) events.

Specifically, Paragraph (b)(1) of this rule requires licensees to submit projected values for Reference Temperature, pressurized thermal shock (RTPTS), by January 23, 1986. Additiorially, Paragraph (b)(3) of this rule requires the licensee to sutxnit, by April 23, 1986, an analysis and schedule for implementation of a flux reduction program if the projected values are expected to exceed PTS screening criterion at any time during the life of the plant.

0

]

k O

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

c.

e.

~'

Dr. B. J. Snyder August 27, 1985 4410-85-L-0174 Because of the unique shutdown condition of TMI-2, (i.e., the reactor vessel head has been removed and the reactor coolant system, which is open to the reactor building atmosphere, is no longer capable of retaining pressure), the potential for a PTS is not a concern during the recovery period.

Based on the above rationale, GPU Nuclear requests an exemption from 10 CFR 50.61(b)(1) and (3). In the event a decision is made to restore' TMI-2 to an operable condition, GPU Nuclear will comply with the PTS requirements specified in the amendment to Paragraph (b) of 10 CFR 50.34 which applies to operating license applications.

Per the requirements of 10 CFR 170, an application fee of $150.00 is enclosed for review of this docunent.

Sincerely,

/

ad th%.

"A"'

F. R. Standerfer Vice President / Director, TMI-2 FRS/RDW/eml Enclosed: GPU Nuclear Check No. 00017373 cc: Deputy Program Director - TMI Program Office, Dr. W. D. Travers

.