Summarizes 850805 Mgt Meeting W/Util at Region II Ofc Re Results of Operator Requalification Exams & Future License Utilization Plans.List of Attendees Encl
ML20137H674
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/15/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20137H680 List:
References
NUDOCS 8508290315
Download: ML20137H674 (3)


Text

,

f

, y

' l/ellnJ  ;

I August 15, 1985  !

Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

MEETING

SUMMARY

This refers to the management meeting condacted at your request in the NRC Region II office on August 5, 1985. The meeting was held to discuss results of recent operator .requalification examinations and future license utilization plans. The details of the meeting are provided in Enclosure 1. A list of attendees at the meeting is shown in Enclosure 2.

It is our opinion that this meeting was beneficial in that it provided a better understanding of the utility's future plans in the operator training area.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning these matters, we will be pleased to discuss them.

Sincerely, Original Signed by Roger D. Walker Roger D. Walker, Director Division of Reactor Projects

Enclosures:

1. Meeting Summary
2. List of Attendees
3. Memo H. Nix, GPC, to B. Wilson, NRC, dated July 29, 1985 cc w/encls:

vJ. T. Beckham, Vice President and M. General Manager-Nuclear C. Nix, Site General ManagerOperation J . E. Fornel, Site QA Supervisor tg.Gucwa, Chief,NuclearEngineer c w/encls: esos290315 C Resident Inspector PDR ADOCK 8 % $21 PDR

. S. Jordan, Executive Secretary V Document Control Desk State of Georgia RII RII RI RI RII BW tm C ian AGib n VP iera VBr niee 8/jy/85 8/f3/85 8// 85 8/g /85 g\

8/Q/85 re4C

r-ENCLOSURE 1 MEETING

SUMMARY

On August 5,1985, representatives of Georgia Power Company (GPC) met with the NRC, at GPC's request, in the NRC Regional Office in Atlanta, Georgia. GPC explained its desire to quickly learn the results of the recent NRC administered operator requalification examination, as the results could change plans for future training. The NRC acknowledged those concerns and stated that final results would be provided as soon as possible.

GPC discussed its plans for future utilization of licensed personnel. GPC delivered a letter to the NRC listing individuals whose job assignments no longer require a license. The letter, Enclosure 3, was accepted by the NRC and docketed.

6

r- 1 I

l ENCLOSURE 2 LIST OF ATTENDEES GEORGIA POWER MEETING WITH NRC AUGUST 5, 1985 Georgia Power Company: H. C. Nix, Site General Manager J. Badgett, Manager, Nuclear Training, Corporate C. T. Moore, Manager, Nuclear Training, Plant Hatch NRC Region II: C. A. Julian, Acting Chief, Operations Branch J. F. Munro, Operator Licensing Examiner R. Carroll, Project Engineer l

l

'- _ __