DCL-85-365, Forwards Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan

From kanterella
(Redirected from ML20137H418)
Jump to navigation Jump to search
Forwards Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan
ML20137H418
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/13/1985
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20137H424 List:
References
DCL-85-365, NUDOCS 8601210519
Download: ML20137H418 (1)


Text

. - - - -. --

l PACIFIC OAS AND E LE C T RIC C O MPANY bb

[

77 SEALE STREET. SAN FRANCISCC, CALIFORNIA 94106 * (415)781 4211

  • TWX 91C 372 6587 i

,,... o..m MCS 8meuseNF December 13, 1985 PGandE Letter No.: DCL-85-365 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 i

Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan.

These updates are listed in Enclosure 1.

Concurrently, two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information.

This privacy /

proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, 1

M J.

. Shiffer Enclosures (3)

/

cc:

R. T. Dodds i

R. Fish

~

i Document Control Desk (2) cc w/o Enc 3:

L. J. Chandler y

G. W. Knighton B. Norton CPUC 1

Diablo Distribution i' is available for review at:

f.

8601210519 851213 PDR ADOCM 05000275 emont heet F

PDR 23rd Floor, Roan C-40 0635S/0038K/ERK/1345 I\\

l

-