ML20137H008

From kanterella
Jump to navigation Jump to search
Advises That Simulator Available for Development of Methodology for Evaluation on One Backshift Daily for Any 3 Wks Before 860518 in Response to NRC 851227 Request. Simulator Time May Also Be Available from Jul-Oct
ML20137H008
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/14/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Russell W
Office of Nuclear Reactor Regulation
References
86-008, 86-8, NUDOCS 8601210376
Download: ML20137H008 (2)


Text

._.

d

=

VIHOINIA ELECTHIC AND PownH Coxi>ANY Ricnwoxn,VinouxiA ununt W. L. STEWART Vaca Puumanawr Noctuam OPERATIONS January 14, 1986 Mr. William T. Russell, Director Serial No:

86-008 Division of Human Factors Technology PTS /BLS:cmh Nuclear. Regulatory Commission Docket Nos.

50-338 Washington, D.C.

50-339 License Nos. NPF-4 NPF-7

Dear Mr. Russell:

VIRGINIA ELECTRIC AND POWER COMPANY NORTil ANNA UNITS 1 AND 2 REQUEST FOR NRC USE OF SIMULATOR In response to your letter of December 27, 1985, requesting the use of our North Anna simulator for development of a methodology for the evaluation of simulators, we are pleased to offer the facility as a candidate for your program. The proposed conditions of your letter are acceptable.

We anticipate that the simulator would be available for your use on one backshif t each day for any three weeks prior to May 18, 1986.

Time may also be available during the July through October period.

Our point of contact for this project will be Mr. Roger Garner, Supervisor, Training (Simulator), (804) 748-3610, ext. 3001.

We are looking forward to participating in this project.

Very truly yours, jy Q 7-t-

W. L. Stewar t 8k 8601210376 860114 PDR ADOCK 05000338 I

'O P

PM

e cc:

Mr. M. W. Branch NRC Resident Inspector North Anna Power Station Mr. L. B. Engle North Anna Project Manager PWR Project Directorate #2 Division of PWR Licensing - A