ML20137F965
| ML20137F965 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/28/1997 |
| From: | Ross M GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20137F120 | List: |
| References | |
| 6710-97-2081, NUDOCS 9704010276 | |
| Download: ML20137F965 (2) | |
Text
.
9 r
e l
GPU Nucleer,Inc.
(
Route 441 South NUCLEAR Post Office Box 480 Middletown. PA 17057-0480 Tel 717 944-7621 (717) 948-8005 i
February 28, 1997 6710-97-2081 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Dear Sir:
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI-1) and Unit 2 (TMI-2)
Operating License Nos. DPR-50 and DPR-73 Docket Nos. 50-289 and 50-320 Annual Report Attached is the 1996 Annual Report for Three Mil-Island Nuclear Station, Unit 1 (TMI-1). This I
report is being submitted in accordance with TMI Technical Specifications Sections 6.9.1.B.1 through 6.9.1.B.5 and 6.17 and in accordance with TMI-2 Technical Specification 6. 8.1.3(a). The attachments to this letter contain the following information: -
A tabulation of the number of workers receiving exposures greater than 100 mrem /yr, by Unit, according to work and job functions (per TMI-l T.S. section 6.9.1.B.I and TMI-2 T.S. section 6.8.1.3(a)).
I -
Aircraft movement data from the Harrisburg International Airport for calendar year 1996 (per T.S. section 6.9.1.B.2).
Leak reduction program test information for the calendar year 1996 (per T.S. 6.9.1.B.3).
/ld( -
Pressurizer power operated relief valve and pressurizer safety valv challenges for the calendar year 1996 (per T.S. section 6.9.1.B.4) e30020
\\
9704010276 970228 DR ADOCK 05000289-ll$,gggggl=l*R$[
i i
i I -
Results of specific activity analysis - primary coolant system (per T.S. section 6.9.1.B.5).
i i -
Major changes to radioactive waste treatment systems (per T.S.
j section 6.17)
]
Sincerely, I
g,
/
M. J. Ross Director, TMI (Acting)
JSS Attachments cc:
M. G. Evans - TMI Senior Resident Inspector H. J. Miller - Administrator, Region I B. C. Buckley - TMI-1 Project Manager L. Thonus - TMI-2 Project Manager l
l l
r l
l l
l R
t'
..