ML20137F889
| ML20137F889 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 08/19/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dixon O SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20137F894 | List: |
| References | |
| NUDOCS 8508270119 | |
| Download: ML20137F889 (1) | |
See also: IR 05000395/1985030
Text
_ _ _ _ _ - - _ - - _ _ - - _ - - - - - - _ _
- - _ - - _ - - - - -
_ -
--.
-,
8(Mc/a/
-
AUG 191985
South Carolina Electric and Gas Company
A
/ TTN: Mr. O. W. Dixon, Jr.
Vice President, Nuclear Operations
P. O. Box 764 (167)
Columbia, SC 29218
Gentlemen:
SUBJECT:
REPORT N0. 50-395/85-30
On July 6-31, 1985, NRC inspected activities authorized by NR; Operating License
No. NPF-12 for your V. C. Summer facility. At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
15l DCtvid it regeelli
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-395/85-30
cc w/ encl:
V. S. Bradham, Director, Nuclear
0
, Plant Operations
4. G. Croley, Group Manager
Technical & Support Services
df R. Hunt, Associate Manager,
d.SurveillanceSystems
B. Knotts, Jr.
bec w/ encl:
JRCResidentInspector
Document Control Desk
A . Hopkins, NRR
State of South Carolina
RII
RII
AJo
on:bhg
FCa rell
l
8//(,/85
8/j{p/85
(l
8508270119 850819
ADOCK 0500
5
G
ZEc l
j