Forwards Safety Insp Repts 50-456/85-27 & 50-457/85-27 on 850520-0607 & 0722-0801.No Violation Noted.Unresolved Items on Reportability of Deficiencies,Per 10CFR50.55(e), Identified & Require Addl Info Re Disposition
ML20137F814
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/21/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137F821 List:
References
NUDOCS 8508270094
Download: ML20137F814 (2)


See also: IR 05000456/1985027

Text

-

.

3Ad

AUG 2 1 S65

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President .

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. M. J. Farber of

this office on May 20 through June 7,1985 and July 22 through August 1,1985,

of activities at Braidwood Nuclear Power Station, Units 1 and 2, authorized by

NRC Construction Permit Nos. CPPR-132 and CPPR-133 and to the discussion of

our findings with Mr.' J. Wallace and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examinaion of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection. Two unresolved items, concerning the reportability of deficien-

cies in accordance with 10 CFR 50.55(e), were identified which require addi-

tional information from your staff to disposition. An additional unresolved

item, concerning the acceptability of the Containment Sump Recirculation

Testing, was identified and an evaluation of the test results by your Project

Engineering Department is required to determine its disposition.

, In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosure will be placed in the NRC's Public Document Room.

The responses directed by this letter are not subject to the clearance proce-

dures of the Office of Management and Budget as required by the Paperwork

Reduction of Act of 1980, PL-511.

.

8508270094 850821

PDR ADOCK 05000456

G PDR

$@

- , - .

Con.monwealth Edison Company 2 AUG 2 1 G85

We will gladly discuss any questions you have concerning this inspection.

Sincerely

W. S. Little, Director

Braidwood Project

.

-

Enclosure: Inspection Reports

No. 50-456/85027(DRP);

No. 50-457/85027(DRP)

cc w/ enclosure:

D.L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Station Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII

Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

,

J. Stevens, NRR

!

.

h

Little/rr R,ing

08/20/85

w

.- - - -

- - - - ~ __

.-