3Ad
-
.
AUG 2 1 S65
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
.
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. M. J. Farber of
this office on May 20 through June 7,1985 and July 22 through August 1,1985,
of activities at Braidwood Nuclear Power Station, Units 1 and 2, authorized by
NRC Construction Permit Nos. CPPR-132 and CPPR-133 and to the discussion of
our findings with Mr.' J. Wallace and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examinaion of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection. Two unresolved items, concerning the reportability of deficien-
cies in accordance with 10 CFR 50.55(e), were identified which require addi-
tional information from your staff to disposition. An additional unresolved
item, concerning the acceptability of the Containment Sump Recirculation
Testing, was identified and an evaluation of the test results by your Project
Engineering Department is required to determine its disposition.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
,
letter and the enclosure will be placed in the NRC's Public Document Room.
The responses directed by this letter are not subject to the clearance proce-
dures of the Office of Management and Budget as required by the Paperwork
Reduction of Act of 1980, PL-511.
.
8508270094 850821
ADOCK 05000456
G
$@
- , - .
Con.monwealth Edison Company
2
AUG 2 1 G85
We will gladly discuss any questions you have concerning this inspection.
Sincerely
W. S. Little, Director
Braidwood Project
.
Enclosure:
Inspection Reports
-
No. 50-456/85027(DRP);
No. 50-457/85027(DRP)
cc w/ enclosure:
D.L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
J. F. Gudac, Station Superintendent
C. W. Schroeder, Licensing and
Compliance Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII
Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
,
J. Stevens, NRR
!
.
h
Little/rr
R,ing
08/20/85
w
.-
-
-
-
- - - -
~
__
.-