ML20137F747

From kanterella
Jump to navigation Jump to search
License for Edlow International Co to Export 4,044 Kgs of U-235 Contained in 92,969 Kgs U,Enriched to 4.35 W/O Max,As U Hexafluoride (UF6) to Japan
ML20137F747
Person / Time
Issue date: 03/25/1997
From: Hauber R
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
To:
References
SAM-LIC-2, NUDOCS 9704010199
Download: ML20137F747 (3)


Text

ag g g y__ _ _ _ _ _,M!MD6RFDetNst #SNWrEilikelMWH= tim /M g

l 88RC FORM 2so NRC LICENSE NO.

i d'i I

  • +N I

l DilSLICENSEEXPIRES 31 Ma*'h2000 l'

I I

' l Rutteh States of Amerita xsNu02ss5 j:

I i

Nuclest Regulatory Commision I

i Purewent to the Atomic Energy Act of 1954, as amended,and the Energy to the licensee authorizmg the esport of the materiets and/or production g Coorganization Act of 1974 and the regulations of the Nuclear Regulatory or utilization facilities listed below, subject to the terms and conditions l Commission isewed purewent thereto, and in reliance on staternante and herein, representations heretofore made by the licensee, e license is hereby leased l

LsCENSE E ULTIMATE CONSIGNEE IN FOREIGN COUNTRY

) I l

Edlow internadonal Company 1

K*'** 8*** P***' carpereewi Ii i' lI 1864 Connec6 cut Avenue, N.W. Suhe 201

$Y

]

I Washington, DC 20000 yangeen, x,un,mem l

I RepuMie of Kame l

1 Attn: R. H. Fisk sReseado is and 11 ser Kari 2 and s,

, :12,1 i,

1

2. Keres Beceric Power Carperosen l

l Yeneswene Eselaer Power Dhr., Unit 1,2, a l

l IQome-fu s17, W G4ub l

Yongewang-oun, Jean-Nem l

l Repubse of Keree y

l l

IReloade 1o,1e and 3 for Yang oweng 1,2. and 3, -, :124 I

I l

INTERMEDIATE CONSIGNEE IN FOREIGN COUNTRY OTHER PARTIES TO EXPORT g '

I Korea Nuclear Fuel Co., Ltd.

U.S. Enrichrnent Corporadon l

l 150 Dooglin Dong, Yuseong-Ku P.O. Box 628 l :

I Daejon 301-353 Pikaton, OH 45661 l

l Republic of Korea I

i (supp e,)

j i

(For conversion and fabrication) l I

I l

l I

I I

I 1

I l

APPUCANT*S R EF. NO.

SAM 48C-2 I

COUNTRY OF ULTIM ATE DESTINATION Japan I

g OUANTITY DESCRIPTION OF MATERIALS OR PACILITIES I

l kilograms 4,044.0 Uranium-235 Contained in 92,969.0 kilograms uranium, enriched to 4.35 w/o maximum, as I

l uranium hexafluoride (UFe).

l I

I l

Total quantity of material authorized for export to seCh reactor is summerfred on Page 2.

g I

I a

l i

The shipment of Australian and Canadian origin materialis authorized.

(/

I F

/

i l

Conditions 6 and 8 on page three of this license apply to this export.

hi O

I l /////////////////////////'l ///////////////////////////////////////////////////////END/////////////////////////////////////////////////////////////////////////A (,

I i

l I !

1

$fi Y byff k FT.

2 I

I i l

310053 4lMMEEEEEM l l, i

I 1

l l

s I

Neither this license nor any right under this licones shall be assigned or

[Mt2EO 5 A RC REPRESENTATIV l

stherwise treneferred in violetion of the provleions of the Atomic Energy 6

l Act of 1954, as amended and the Energy Reorganization Act of 1974.

Ronald D. Hauber, Director I

l l

Th31, cones is subject to the right of ricepture or control by Section 1(M of Division of Nonproliferadon, Exports l

l the Atomic Energy Act of 1954,as amended and to all of the other provi.

g g,g l

l sions of seed Acts, now or hereefter in effect and to eli valid rulee and l

l reputtlons of the Nuclear Regulatory Commission.

l DATE OF l$SUANCE I

Q 40$ Q 970305 w______________________________.

XSNM-2965 PDR iPORT LICENSEE ~w'F La%H;AkW*1t*A184EIR

i 4

l X$NM02965 Page 2 W 2 5 1997 i

a i

REACTOR RATERIAL QUANTITY ORIGIN OF RATERIAL 1

Kori Unit 2, Canada 16,479.0 kg i

Reload 13 18,310.0 kg U.S.

1,831.0 kg Kori Unit 3, Reload 11 27.316.0 ka Australia 27.316.0 ka TOTAL 45,626.0 kg 45,626.0 kg 4

Yong Gwang Unit 1, j

Reload 10 16,728.0 kg Namibia 16,728.0 kg Yong Gwang Unit 2, Reload 10 7,176.0 kg Australia 7,176.0 kg Yong Gwang Unit 3, Australia 11,719.5 kg Reload 3 23.439.0 ka S. Africa 11.719.5 ka TOTAL 47,343.0 kg 47,343.0 kg GRAND TOTAL 92,969.0 kg 92,969.0 kg j

I i

3

)

% 3 d 3 %.

U.s. NUCLEAR REGULATORY COMMISSION b

EXPORT LICENSE Cor.ditions License Number XSNMOM68i Condition 1 - Licensee shall file with the Customs Officer or the Postmoster two copies,in oddi-tion to those otherwise required, of the Shipper's Export Dectoration covering each export and mark one of such copies for transmittal to the U.S. Nuclear Regu-lotory Commission, Washington, D.C. 20555. The following decloration should oc.

company or be placed on the Shipper's Export Declarations for such exports:

"This shipment is being mode pursuont to specific license number (specific license number) filed at (location of Customs office where license is filed),

on (dote license was filed). This license expires on (expiration date of license), and the unshipped bolonce remaining on this license is sufficient to cover the shipment described on this declaration."

Condition 2 - Exports authorized in any country or destinction, except Country Groups Q, S, W, X, Y, and 2 in Port 370, Supplement No.1, of the Comprehensive Export Schedule of the U.S. Department of Commerce.

Cor:ditior. 3 - This license covers only the nuclear content of the material.

Condition 4 - The materic! to be exported under this license shall be shipped in occordonce with the physical protection requirements fer special nuclear material in 10 CFR 73.

Condition 5 - Special nuclear material outhorized for export under th;s license shall not be transported outside the United States in possenger carrying aircraft in shipments exceeding (1) 20 grams or 20 curies, whichever is less, of plutonium or uranium 233, or (2) 350 grams of uranium 235.

Condition 6-This licen:e authorizes export only and dos.3 not authorize the receipt, phys

  • col possession, or use of the nuclear moierich Condition 7 - The licensee shall complete and submit on NRC Form 741 for each shipment of source material exported under this license.

Condition 8 - The licensee shall advise the NRC in the event there is any change in the designa-tion of the company who will package the nuclear material to be exported under this license, or any change in the location of the pockoging operation, at least three weeks prior to the scheduled dote of export.

t l

. _ _ _ _ _ _ _.