MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 IR 05000382/19990081999-07-12012 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-08 Issued on 990503 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations IR 05000382/19990081999-07-12012 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-08 Issued on 990503 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20196E6931999-06-22022 June 1999 Forwards Corrected Ltr Re Changes to Rev 19 to Emergency Plan.Original Ltr Had Error in Subject Line ML20196E0831999-06-21021 June 1999 Forwards Insp Rept 50-382/99-12 on 990524-27.No Violations Noted.Purpose of Insp Was to Conduct Assessment of Emergency Preparedness Program ML20196D9941999-06-18018 June 1999 Forwards Insp Rept 50-382/99-11 on 990524-28.No Violations Noted ML20195J8091999-06-17017 June 1999 Forwards Safety Evaulation Re First 10-yr Interval Inservice Insp Relief Request for Plant,Unit 3 ML20196C8711999-06-15015 June 1999 Discusses Insp Rept 50-382/99-08 & Forwards Notice of Violation Re Unescorted Access Which Was Mistakenly Granted to Individual Whose Background Investigation Indicated That He Had Failed Prior Drug Screening with Another Employer ML20196F3721999-06-0909 June 1999 Corrected Ltr Forwarding Rev 19 to Emergency Plan ML20195G3711999-06-0909 June 1999 Ack Receipt of Ltr Dtd 981223,which Transmitted Waterford 3 Steam Electric Station Emergency Plan,Rev 24,under Provisions of 10CFR50,App E,Section V.No Violations of 10CFR50.54(q) Identified During Review ML20207E8541999-06-0303 June 1999 Forwards SE Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressurizer Safety Valves at Plant,Unit 3 ML20207G3441999-06-0303 June 1999 Forwards Insp Rept 50-382/99-09 on 990411-0522 & Notice of Violation.One Violation Identified & Being Treated as Noncited Violation C ML20207D3771999-05-27027 May 1999 Ack Receipt of 990401 & 0504 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-01 on 990303 ML20207A5121999-05-24024 May 1999 Refers to Which Responded to NOV & Proposed Imposition of Civil Penalty Sent by .Violations A,B & E Withdrawn & Violations C & D Changed to Severity Level IV ML20206U7851999-05-18018 May 1999 Forwards Insp Rept 50-382/99-06 on 990405-09.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations ML20206N6961999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML20206S4411999-05-10010 May 1999 Forwards Insp Rept 50-382/99-05 on 990228-0410.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3841999-05-0707 May 1999 Informs That on 990407,NRC Administered Generic Fundamental Exam Section of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However Copy of Master Exam,With Answer Key,Encl for Info.Without Encl ML20206K0951999-05-0606 May 1999 Discusses Insp Rept 50-382/99-08 Issued 990503 Without Cover Ltr Documenting EA Number & Subject Line Indicated NOV Which Was Incorrect.Corrected Cover Ltr Encl ML20206F4701999-05-0303 May 1999 Forwards Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Re Failure to Review & Consider Derogatory Access Authorization Background Info as Required by PSP Identified & Being Considered for Escalated Enforcement Action ML20206K1211999-05-0303 May 1999 Corrected Cover Ltr Forwarding Insp Rept 50-382/99-08 on 990405-07.One Violations Noted & Being Considered for Escalated EA ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205M0561999-04-0909 April 1999 Forwards Insp Rept 50-382/99-04 on 990301-19.One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20205J8781999-04-0505 April 1999 Forwards Insp Rept 50-382/99-02 on 990117-0227.No Violations Noted.Inspectors Determined That Six Violations Occurred & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20205J0901999-04-0202 April 1999 Informs That Info Submitted by & 970313 Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) ML20205A4681999-03-26026 March 1999 Forwards Insp Rept 50-382/99-03 on 990308-12.Two Violations of Radiation Protection Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205A6141999-03-25025 March 1999 Forwards SE Accepting Request to Use Mechanical Nozzle Seal Assemblies (Mnsas) as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Application at Plant,Unit 3 ML20205F3311999-03-19019 March 1999 Advises of Planned Insp Effort Resulting from Plant,Unit 3 PPR Review,Which Was Completed on 990211.Performance at Plant,Unit 3 Was Acceptable ML20204E4941999-03-17017 March 1999 Discusses TSs Bases Change Re 3/4.4.1,3/4.6.1.7,3/4.6.3, 3/4.7.12 & 3/4.8.4.Forwards Affected Bases Pp B 3/4 4-1, B 3/4 6-3,B 3/4 6-4,B 3/4 7-7 & B 3/4 8-3 ML20207F1251999-03-0303 March 1999 Forwards Insp Rept 50-382/99-01 on 990125-29 & 0208-12 & Notice of Violations ML20203H8501999-02-17017 February 1999 Forwards SE Accepting Licensee 970701 Submittal of Second Ten Year ISI Program & Associated Relief Request for Plant, Unit 3.Nine Relief Requests Had Been Authorized Previously & Proposed Alternatives Remain Authorized ML20203D7211999-02-11011 February 1999 Forwards Request for Addl Info Re Licensee 970317 & 990111 Responses to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. Response Should Be Provided within 60 Days 1999-09-09
[Table view] |
Text
C l UNITE 3 ST AT Es
. NUC'. EAR REGULATORY COMMISSION )
f REGloN IV S 4 611 RYAN PLAZA DRIVE, sulTE 400 l
$9
[ ARLINGTON, TEXAS 76011-8064 l MAR 261997 l l
Charles M. Dugger, Vice President Operations - Waterford 3 1 Entergy Operations, Inc. i P.O. Box B !
Killona, Louisiana 70066 l l
SUBJECT:
WATERFORD 3 PERFORMANCE IMPROVEMENT PLAN (FOCUS)
I This refers to the meeting conducted in the Region IV office on March 24,1997. This j meeting related to a discussion presented to NRC Region IV personnel on continuing efforts to improve overall performance at Waterford 3. The presentation focused on the current plan for improvement and an overview of strategies to identify and correct performance issues. The presentation also discussed design basis performance, procedure adherence, untimely corrective actions, safety culture, root causes, and the transition to a new plan for continuous improvement called "True North Strategies."
We appreciated your update on the status of your current performance improvement plan and the introduction to your new plan for continuous improvement.
We are looking forward to the agreed upon bimonthly update meetings on your efforts to j improve performance. For future performance improvement meetings, it is our intent that the locations will alternate between Region IV and Waterford 3.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10 Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document !
Room. l Should you have any questions concerning this matter, we w be pleased to discuss them with you.
Sincerely,
?i Wr V I
. t/ ch*
, omas P.iGwy n, irector ivision of Reactor Projects
Enclosures:
- 1. Attendance List
- 2. Licensee Presentation
.k .U.h,k 9704010136 970326 PDR ADOCK 05000382 P PDR 1
. . _ . .m. _. _ _ -. . . _ . _ ___ . _ . . _ __ _ _ _ . . _ . . _ . . _ . . . _ _ _ _ . _ _ _ . _ . _ . . . . _ _ . _ _ . .
l.. . :
k Entergy Operations, Inc. ,
l cc:
Executive Vice President and ,
l Chief Operating Officer ,
Entergy Operations, Inc.
l- P.O. Box 31995 :
l Jackson, Mississippi 39286-1995 l Vice President, Operations Support l l Entergy Operations, Inc. *
! P.O. Box 31995 I Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 '
Jackson, Mississippi 39205 General Manager, Plant Operations ;
Waterford 3 SES l Entergy Operations, Inc. !
P.O. Box B !
Killona, Louisiana 70066 Manager - Licensing Manager l Waterford 3 SES Entergy Opert,tions, Inc. i P.O. Box B Killona, Louisiana 70066- l Chairman
' Louisiana Public Service Commission One American Place, Suite 1630 !
Baton Rouge, Louisiana 70825-1697 l Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES )
Entergy Operations, Inc.
P.O. Box B Killona, Louisiana 70066 l
l William H. Spell, Administrator Louisiena Radiation Protection Division P.O. Box 82135 l Baton Rouge, Louisiana 70884-2135 i
I I
l l
! i i
e
[
Entergy Operations, Inc. i .
Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 )
l Mr. William A. Cross
! Bethesda Licensing Office 3 Metro Center :
Suite 610 '
Bethesda, Maryland 20814 Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005 3502 ,
L l
Entergy Operations,-inc. -4 !
MAR 261997 ,
i bec to DCD (IE45) bec distrib. by RIV:
l; Regional Administrator Resident inspector !
DRP Director DRS-PSB :
Branch Chief (DRP/D) MIS System l Project Engineer (DRP/D) RIV File !
Branch Chief (DRP/TSS) !
Director, WCFO PAO, Region IV l SLO, Region IV l l
l l
l
{
l To receive copy of document, Indicate in box: " g' = opy without enclosures "E" = Copy wth enclosures "N" = No copy PE:D$Pp] C:DRP/M7 D:DRP g/
GEV%d6bl#rr~ PHHarM TPGwynrg g/f 03/ 5 /97 03//jb($ 03/,2k/97 OFFIC'AL RECORD COPY
e s
Entergy Operations, Inc. MAR 261997 bec to DCD (IE45)-
bec distriL. by RIV:
Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D) MIS System )
Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS)
Director, WCFO PAO, Region IV SLO, Region IV l
l I
i 1 i To receive copy of document, indicate in box: "g = opy without enclosures "E" = Copy with enclosures "N" = No copy
~PE:DjPpD () C:DRP/M7 D:DRP jg/
GEWd W PHHarM TPGwynrf ///
03/*5 /97 03/@f9f/ 03/fk/97 OFFICIAL RECORD COPY 310016
1 i
e.
i Entergy Operations, Inc. 4-J MAR 261997 bec to DCD (IE45) bec distriL. by RIV: ;
Regional Administrator Resident inspector [
DRP Director DRS-PSB :
Branch Chief (DRP/D) MIS System i Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) i Director, WCFO l PAO, Region IV ;
SLO, Region IV l l
1 I
t To receive copy of document, indicate in box: "g' = opy without endosures "E" = Copy with endosures "N" = No copy PE:DjPp () C:DRP/M7 D:DRP gf GEW46bOMrf- PHHarM TPGwynrf gf 03/*5 /97 03//bf$ 03/J.p/97 OFFICIAL RECORD COPY l
]
4
_, - . , , ., ,- b
- Enclosure 1 {
MEETING: FOCUS PLAN MEETING l i I DATE: MARCH 24, 1996 l ATTENDANCE LIST (PLEASE PRINT CLEARLY)
- NAME ORGANIZATION POSITION TITLE I
~9.h anext- NRL- E ssC- '24mc.n CWec- ;
6 Rck arzc- arf P<<ia k r ,.me,n-G. We cne s- U llc - R tv' PcAut eieu i c . P. fa h d u a c- u a. cu PAeo-m,w n i A. % /da# // Ntd - c'/V h r, h?5 E\\ %EccckbN N',GO - 2\\! $eafios(AIN.ms%v- ,
- 'T~ ). Ci u td AY?O - ?lV h,P htz D !
l J. Nee _ 3 A/RC - fW TjepIrq RA.
- l.'S. Wt w n Ea rErl,r - tJ 3 LiwsbrN6 Svev .
- T ~5. G a a A A hk u - wR Licu s:, a Mu- l F.T % --..aJ D, 7~ 8re >
l K.n & - m Mac- Strt 6suouss %,b 1
T. G . M ae Pm G urcecn w) >
, E W . f i rN Edw ~ % ~
YrdAdd.%iM l f.'E.LDkhPE21L ENTE Al- La 5 DsREcat.. D$%fE4 T9.LMN Wh EuTes-4V - V5 be4exal UM f14. 4 A- l
. d W/ Al(r eLil- M Elb f ** O3 iR,hcctnQ ([W Y '(. F[fi f f', 3 C ih 1 ... e w , ,
clurats r cu3 v e Lic~u &s ,
i i i t
a a4 d
l I
. 9 UNITEo STATES f p" "8 0 ,s?*
.#. . NUCLEAR REGULATORY COMMISSION
, 'd' REGloN iv S ,p t
611 RYAN PLAZA DRIVE, SulTE 400
$9 'd f ARLINGTON TEXAS 76011-8064 MAR 261997 Charles M. Dugger, Vice President Operations Waterford 3 Entergy Operations. Inc.
P.O. Box B Killona, Louisiana 70066
SUBJECT:
WATERFORD 3 PERFORMANCE IMPROVEMENT PLAN (FOCUS) l This refers to the meeting conducted in the Region IV office on March 24,1997. Thie meeting related to a discussion presented to NRC Region IV personnel on continu:ng efforts to improve overall performance at Waterford 3. The presentation focused on the current plan for improvement and an overview of strategies to identify and correct performance issues. The presentation aim discussed design basis performance, procedure adherence, untimely corrective actiont- +afety culture, root causes, and the transition to a new plan for continuous improvement called "True North Strategies."
We appreciated your update on the status of your current performance improvement plan and the introduction to your new plan for continuous improvement.
We are looking forward to the agreed upon bimonthly update meetings on your efforts to improve performance. For future performance improvement meetings, it is our intent that the locations will alternate between Region IV and Waterford 3.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them with you. l Sincerely, i
A J w/w omas P.(Gw n,pirector l
ivision of Reactor Projects
Enclosures:
- 1. Attendance List
- 2. Licensee Presentation l
1
Entergy Operations, Inc. cc:
Executive Vice President and ,
Chief Operating Officer l Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
P.O. Box B ;
Killona, Louisiana 70066 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.
P.O. Box B Killona, Louisiana 70066 l Chairman Louisiana Public Service Commission i One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
P.O. Box B Killona, Louisiana 70066 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135
.. .. - . . . . . - - _ _ = _ . - . _-.
Entergy Operations, Inc. 1 Parish President St. Charles Parish i P.O. Box 302 Hahnville, Louisiana 70057 Mr. William A. Cross 1 Bethesda Licensing Office 3 Metro Center Suite 610 i Bethesda, Marylano 20814 l Winston & Strawn 1400 L Street, N.W. 1 Washington, D.C. 20005-3502 ]
1 l
l I
i l
m_. _ _ _ _ . . . . _ . . . . _ _ _ _ _ . - _ - - - _ _ _ . _ _ _ _ _ _ _ . _ _ _ . . . _ _ _ _ _ . . . - . .
chCl05Ure 1 MEETING: FOCUS PLAN MEETING
- DATE: MARCH 24, 1996
- ATTENDANCE LIST (PLEASE PRINT CLEARLY)
NAME ORGANIZATION POSITION TITLE
- 9 . M a n e.r- v n ax.- e s t- Swes C+ec- 1 i
6 Rk a a.c - a r5 % m+ r ,. em-(r. ulerne r AHLc - R W PcNe t e s,ne w s
- c. e. esa u a c - v a. e Ph m~n :
A % & w //
1 Nec - 2/V h e, b?5 E\hE bed 2- 2 n/ Dedem ( hsw
! T _'P. C i [u E AW - BV h9 bg 40 l 5 t a c e_. [ vec - EW DepErg RA.
_ /L 5 . Y i m s Earem us awakwe sun T.~5. (en a A A %% o - wR Ln_u s., m M c,a .
e F . T . TM~ - J Il ~ 7 > s -m D, I ~ siia > 1 T. c, . M oe piw s usch!< wa %c- %rc Bos,IEs3 Gud ,
72.w.Trn$ Ew - E4 Yrdlibd f.T. W R.h? E 221- ENru m V~ w 5 DsREc2bt., DCsIGM E%
- T9. Ll># A7.b Eaten.cv - tas bee d N E PR. % -
l E.C . Ew NG a Eu wR.G1 - t :.3 IhR.L eScrr deg. AFFM i l C. A1 <7 e A ENrrM r o 3 V.# Occcaz &%
l 1
l a i j
l 1
~
(
- - exasue z i
!~
n ;
4 cs ENTERGY ,,,,,,, -n n= - l l
l l l l l l W ATERFORD SES - UNIl'a )
l i
- 3
, LEADING THE WAY l TO EXCELLEkCE
, ....., ya.c,s y
NRC /W3 MANAGEMENT PRESENTATION March 24,1997 Entergy Operations, Inc,
l !. l 5t! !!i:i! i!!l N y g
r e
O I
t E
n
_ T e=
A T
N E
S E 7
_ R 9 P 9 1
T ,
_ N 4 E 2 3-M h E c G r a
A M
_ N
_ A
- M 3
W
/
_ C R
_ N
+
! 4 4
' ~
l < >
1 1
Agenda I -
l an.
i
[""' Introduction C. Dugger We Understand The issues C. Dugger i Plan For Continuous improvement T. Murphy Recommitment To T. Leonard Continuous improvement Fix It Right A. Wrape
! Conclusion C. Dugger a
^ -' Entergy i
,l ,I!!!:!lIl!!' ji i !i '
y g
r t
e n
E A~'
S E
U S
/
S I
N E r OH T e g
I T g CDN u U D D TA k O S c u
R R h T E _
C N
D I
N -
U -
E W
z
~
We Understand The Issues ;
,~t'~.
Major issues
! e Design Basis Performance e Procedure Adherence i
i i !
e Untimely Corrective Actions e Safety Culture
- i l
e Performance Root Causes !
t I
t e
^ ='lintergy
---__----_--_---_-.__--____----_______-_----____-________________)
i
~
We Understand The Issues
.e, Performance Root Causes ,
e Self-critical attitude not being fully implemented by management i e Management had not exhibited adequate leadership in setting appropriate expectations and holding staff accountable e High standards of excellence for safety and regulatory performance had not been established as has occurred for cost & operating perforruance e Waterford 3 became insular and isolated from the rest of Entergy and the industry and failed to seek out and adopt good practices from the industry.
Entergy I
il i!: ,! l !
iI!iiI t II y
g r
T t e
n N E
_ E &=
M E
V O
R P
M I
y h
_ S p U r O u U M N
I m
_ T N
o T
O
- C R
O F
N AL P
- .5- Plan for Continuous Improvement
- dLj e initial Performance Strategies
! i i :
I e Successes
! e Transition i
e True North Goal Strategies l e Summary Bb i
= Entergy j i
i
/
Plan for Continuous Improvement
- c N r Initial Performance Strategies e Strengthen Management Resources e Define Root Causes that Must be Resolved e initiate Actions e Begin a Continuous improvement OEntergy
Plan for Continuous Improvement a+ m Successes e Employee Concerns Program e Total Quality Management Rejuvenation e Self Assessments e Linking Goals e Procedures initiative e Site Painting i
e Condition Report Process e Engineering Requests Process
FL CUS
&m 4
Plan
)'-
TRANSITIONING TO l TRUENORm l
l Strategies i , ... using the Timeless Principles 4
as our Culture Orniergy i i
)
+
t
( -
i b
4 n ,cg; NM e Operate Waterford 3 safely.
e Maintain equipment in top notch working order.
e We should find our own problems.
, o Expeditiously fix problems once.
e Recognize employee efforts.
e Encourage and develop all employees.
e Run effective, short outages.
e Spend our resources wisely.
e Procedures are to be simple, clear, correct and followed.
e Make Waterford 3 the cleanest station in the country. l e
= Entergy i
I
t a Y.Nau 7 s. ';) p Operate Waterford 3 Safely Strategies e Cultivate a Broad and Deep Safety Awareness for All Employees e Integrate Operational Experience Ownership into Departments e Continue Focus Plan Safety and Regulatory Performance Initiatives e Continue Focus Plan on OEE improvement Plan e implement Improved Technical Specifications e
= Entergy
( ;
~
Plan for Continuous Improvement 2
sc.wvk s.
Summary l ) e Timeless Principles and True North Goals are Seeded i
e Behavior is Changing
- 5 e Seeing Results -- Expect More e We have True North Goal Strategies
...using the Timeless Principles as our culture
'l
= Entergy
i!i;;j! !i,il ! iiItl,i .,
i y
g r
t e
n E
e=
T N
E O ME T
T V dr O
N R E a _
M P n T M o _
')- I I
e MS L _
MUO d
e O U C N T _
E I RT N
O C
s
} .
Recommitment to Continuous Improvement
- ss:
"'"" e Ownership -W3 staff holds itself accountable for plant performance.
e W3 Culture - Employees are cognizant of plant issues and NRC concerns and teamwork with ,
management continues to improve to identify and resolve issues.
e Buy in - Employees are dedicated and committed to .
initiatives and programs that will help W3 achieve World Class Performance. .
Entergy
L Recommitment to Continuous Improvement esse
.yW i e Maintaining Initiatives e Self Assessments e Questioning Attitude
[ e Additional Resources e Open Communication A
i g
^== Entergy r
4 s
l Recommitment to Continuous Improvement 1 ,
ww l
e Successful Outage t
+ Not measuring days - hours - minutes l + Focus on resolution of long-standing issues
+ Industrial Safety and ALARA :
e
^^=' Entergy I
_a huma a e. =vA w- 'Maaa WweWNed'rew a.m _4mm mwams.e_m w m _- - - - ,.w. - mm m w s.r.u aa.m.m mtme ..mmm.m.--ww, l
i i %
1 w
M I
h i
I O_
g
!^ F_ 5 x
- 4
- u. .
4 l
i 2
d 1
i 4
i
)
i .
L. -. .. -. .. -- . _-- .- ._ . . . .
I l
Fix It Right succ
- .y ;
e We are seeing some good examples of self-critical '
! and questioning attitudes, but there is more work
- ahead.
e We are fixing long standing and emergent .
4 problems.
e We are resourcing our organizations to address workload.
l e
'= Entergy l
l i i
- - Fix It Right succ l
'~
e Discovery of nitrogen in safety injection piping l
e Discovery of change in RWSP level following CVAS
. fan start
- i e Discovery of rusted feet for the CC-134B accumulator i
i e Discovery of minimum thread engagement on charging pump bolts e Discovery of lack of seismic support on safety related solenoid valves a
= Entergy n
1 1
l
!;; Fix It Right moduc.uon.
- $ 9;t A gy Ii 40 = ---
35 * '
31 32 .
30 "
25 * - -
20 * -
i 15" -
10 " --
i
. 5" ~
I l
0
, li l
- RF06 RF07 RF08
.
- 25% Increase in Mods Scheduled to be Perfonned During RF08 8 Entergy i
~
Fix It Right mome.non.
1 i *1 i
e Tornado Missiles Conduit Rerouting i
e ACCW System Waterhammer
! e RAB Wing Area Shielding / CCW Valve Operator e 7KV and 4KV Bus Transfer l e Addition of Maintenance Capability in LPSI Recirculation Lines .
I I
i O
~ = Entergy
- - -- - _ _ -- _ _-- -_ _ -_ _ _ _____________r
Fix It Right mome.non
. . . .*r
{.
e Addition of Maintenance Capability in CVC Letdown Line to VCT l
i e Additional Tri Sodium Phosphate Baskets for Safety Injection Sumps ,
I
- e Emergency Diesel Generator Miscellaneous Vents and Sample Valves e Air Evacuation System improvements e LPSI Vents i l
l e HPSI Flow Control Valves a' - Entergy l ,
l
Fix It Right ENGINEERING e EOI System Wide Design Basis Integration Review e Selected Design Basis Review and Upgrade
+ capture critical system / component assumptions
+ margin control e FSAR Fidelity Review e improved Standard Tech Spec Osnte.gy
Fix It Right
~-
e Engineering Rigor e Design Review Committee l e 10CFR50.59 Refresher Training i
i i
e
' =' Entergy
(
l di ENGINEERING STAFFING 1
240 k .n 220 _
5!@@;
pg 200
- 180
) .
160- -
140 - j
, 120 - -
a 100- -
l
, 80 - -
60 -- -
. 40 -
20 --
0- -
1991 1992 1993 1994 1995 1996 1997
\ E DESIGN STAFF m DESIGN CONTRACTORS tiiSYSTEMS STAFF OSYSTEMS CONTRACTORS e~~ Entergy
,y Fix It Right sum y
'--:-) , ; . , , ,
!" y j
e Eng.ineering R.igor improv.ing 4
l i
! e Bounding Problems i e Taking Control ;
i i
4 I I f
I h
i O I
= Erdergy l t
S 4
i Z 9 O
2 G
i CO ll3 i l D O
.s J Z O O $
o o i
l
)
~
~
Conclusion t
w ~ y; !,
e W3 understands the issues. .!
i e We have a plan for excellence.
t e We will fix it right.
e We are committed to continuous improvement.
e We are dedicated to a successful Refueling Outage.
= Entergy