ML20137F332

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/85-07 on 850301-0430 & Notice of Violation
ML20137F332
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/21/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20137F337 List:
References
NUDOCS 8508260196
Download: ML20137F332 (2)


See also: IR 05000267/1985007

Text

1

'

.

AUG 211985

l- In Reply Refer To:

Docket: 50-267/85-07

Public Service Company of Colorado

ATTN: 0. R. Lee, Vice President

Electric Production

P. O. Box 840

Denver, Colorado 80201

Gentlemen:

This refers to the inspection Mr. G. L. Plumlee III of this office and an NRC

consultant conducted during the period March 1-31 and April 1-30, 1985, of

activities authorized by NRC Operating License DPR-34 for Public Service

Company of Colorado and to the discussion of our . findings with Mr. Jack W. Gahm

and/or other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included the control rod drive event,

licensee action on previous. inspection findings, licensee event reporting,

maintenance, operational safety verification, and periodic and special reports.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and observa-

tions by the inspectors. These findings are documented in the enclosed

inspection report.

During this inspection, it was found that certain of your activities were in

, violation of NRC requirements. Four of these violations,.which are discussed

l in paragraph 2 of the enclosed inspection report, were forwarded to you by our

letter of April 26, 1985. Additional violations are included in this report.

For the violations forwarded by this-report, you are required to respond to

these violations, in writing, in accordance with the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

'

t

RIV: SRI SPES RPB1

GLPlumlee/Is QEIreland EHJohnson

I

f /y/85 f/g0/85 ] / $.\ /85

ge2Wca *SEEn7

O

/ i I  !

l

-.

-

- . _ . _ _ _

, .

. .

-5

Public Service Company of Colorado -2-

Should.you have any questions concerning this inspection, we will be pleased to

! discuss them with you.

Sincerely,

Orljn9 ~~md W

E. H. Jcuson

E. H. Johnson, Chief

Reactor Project Branch 1

Enclosures:

.

1. Appendix A - Notice of Violation

l 2. Appendix B - NRC Inspection Report 50-267/85-07

!

I cc w/ enclosures:

l~

J. W. Gahm, Manager, Nuclear

Production Division

Fort 'St. Vrain Nuclear Station

16805 WCR 19 1/2

Platteville, Colorado 80651

L. Singleton, Manager, Quality

Assurance Division

(Same Address)

Colorado Radiation Control Program Director

bec distrib. by RIV:

  • RPB1 R. P. Denise, DRSP '
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB1/SPES)
  • P. Wagner, RPB1
  • D. Weiss, LFMB (AR-2015)
  • EP&RPB E. Tourigny, ORB 3
  • MIS System ,

l

,

  • RSTS Operator

! *RIV File-

  • w/766

i

'

i

. , - - - - - - , - . . . . _ , , , . . , - _ . , . _ . _ , , _ . .,. . .,- ,,. , .. ,. _ ,,,,, _ ,. . . _ . . _ .