ML20137E401
| ML20137E401 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 03/25/1997 |
| From: | Wetzel B NRC (Affiliation Not Assigned) |
| To: | Richard Anderson NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20137E408 | List: |
| References | |
| TAC-M97816, TAC-M97817, NUDOCS 9703270209 | |
| Download: ML20137E401 (3) | |
Text
_ _ _. __ _. - _._._
i R. O. Anderst:n March 25, 1997 i
.j ;.
Mr. Roger 0. Anderson, Director j
i L'icensing and Management Issues 1
Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 i
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNIT NOS. 1 AND 2 -
t ISSUANCE OF AMENDMENTS RE: COOLINGWATERSYSTEMEMERGENCYINTAKE DESIGN BASES (TAC NOS. M97816 AND M97817) j i
Dear Mr. Anderson:
1 The Commission has issued the enclosed Amendment No.128 to Facility Operating 1
i License No. DPR-42 and Amendment No.120 to Facility Operating License No.
DPR-60 for the Prairie Island Nuclear Generating Plant, Unit Nos. I and 2, i
respectively. The amendments consist of changes to the Technical Specifications in response to your application dated January 29, 1997, as supplemented February 11, 12, March 7, 10, 11, 19, and 20,.1997, i
The amendments authorize you to continue operation of Prairie Island Units 1
+
and 2 on an interim basis, through the incorporation of'three' license i
conditions into your licenses, until a seismically qualified emergency cooling water source is provided that will provide the basis to extend the time for operator post-seismic cooling water load management. This could be done either through a seismic evaluation of the intake canal'~ physical modifications to the intake canal or plant, or some. combination of the two.
As an administrative action b the Nuclear.Re ula' tor which
~
onlyinvolvestheformatoftkelicenses<and-!oesnobCommission(NRC)fivities i
authorize any ac outside the scope of your application and supplements, the NRC has amended the licenses to include an Appendix B which. lists additional license conditions.
I Approval of these amendments through license. conditions has been discussed with your staff in a meeting with NRC on March 12,~ 1997, mand your staff has agreed to the license conditions.
C
,e
- w. -
i A copy of our related Safety Evaluation is al'so enclosed. 'The' notice of issuance will be included in the Commission's biweekly Federal Reaister '
1 l
notice.
{
s
- ,a.
s a
i
.-[ Sincerely; ',
/J l
,(
}
Orig. signed by Beth A. Wetzel, Project Manager i
e DiviiectDirectorateIII-1 Pro sion of Reactor Projects - III/IV l
i Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 j-
Enclosures:
1.
Amendment No.128 to DPR-42 2.
Amendment No.120 to DPR-60 3.
Safety Evaluation NEE fllE EENTER COPY cc w/ enc 1: See next page l
DJSTRIBUTION:
See attached page 1
{
DOCUMENT NAME: G:\\WPDOCS\\ PRAIRIE \\PI97816.AMD
- See previous concurrence T2 somehe e sepy of tels desennent,Indosto in the hem: *C' = Copy without attachrnentlenclosure
- E" = Copy with attachment / enclosure *N* = No copy j
f 0FFICE PM:PD31-1E LA:PD31IE
- BC:SPLBI
- BC:ECGBl
- BC:HHFC1 OGC l
D:PD31V I E
NAME BWetzel: #MW CJamersot\\
LBMarsh GBacchi COThomas 0Wmt JHannoi
[
DATE 03/24/97*
03/24/97 V 03/21/97 03/21/97 03/21/97
% /Rh /97
% h% /97
~
9703270209 970325 IFFICIAL F:ECORD COPY P DF.
ADOCK 05000282 P
1 o
DATED:
March 25, 1997
,a AMENDMENT NO. 128 TO FACILITY OPERATING LICENSE NO. DPR-42-PRAIRIE ISLAND UNIT 1 AMENDMENT NO. 120 TO FACILITY OPERATING LICENSE NO. DPR-60-PRAIRIE ISLAND UNIT 2 Docket File
.PUBLIC PDIII-I Reading J. Roe C. Jamerson B. Wetzel (2)
OGC G. Hill (4)
C.I. Grimes W. LeFave J. Bongarra ACRS J. Jacobson, DRP/RIII SEDB (TLH3)
N 4
r 4
N
?
- f 8 r '.
.g,.
4 s
J pfDI
\\
2'70047
3
)
Mr. Roger 0. Anderson, Director Prairie Island Nuclear Generating i
Northern States Power Company Plant J
cc:
1 J. E. Silberg, Esquire Tribal Council Shaw, Pittman, Potts and Trowbridge Prairie Island Indian Community 2300 N Street, N. W.
ATTN:
Environmental Department Washington DC 20037 5636 Sturgeon Lake Road Welch, Minnesota 55089 4
Plant Manager i
Prairie Island Nuclear Generating Plant Northern States Power Company j
1717 Wakonade Drive East Welch, Minnesota 55089 Adonis A. Nebiett Assistant Attorney General Office of the Attorney General 455 Minnesota Street i
Suite 900 l
St. Paul, Minnesota 55101-2127 l
U.S. Nuclear Regulatory Commission j
Resident Inspector's Office 1719 Wakonade Drive East i
l Welch, Minnesota 55089-9642 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Mr. Jeff Cole, Auditor / Treasurer Goodhue County Courthouse i
Box 408 Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101-2145 Site Licensing Prairie Island Nuclear Generating Plant Northern States Power Company 1717 Wakonade Drive East Welch, Minnesota 55089 NaadulM4 I