ML20137E384
| ML20137E384 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/15/1985 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 1994N, GL-84-11, NED-85-590, NUDOCS 8508230242 | |
| Download: ML20137E384 (4) | |
Text
a Georg:a Power Company 333 P:edmont Avenue Atlanta, Georg:a 30309 Telephone 404 5264526 Maihng Address:
Post Off.ce Box 4545 Atlanta, Georgia 30302 h
Georgia Power L T. Gucwa '
the sostren e4ctoc system Manager Nuctear Engineenng and Chiel Nuclear Eng:neer NED-85-590 1994N August 15, 1985 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz,: Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5
~EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBMITTALS LIST Gentlemen:
As discussed in our July 17, 1985, quarterly licensing meeting, attached is an updated listing of correspondence with NRR to which a written response is expected. This listing expands on the list provided at the July 17, 1985
- meeting, which was limited to proposed changes to the Technical Specifications.
The attachment is tabulated chronologically by Georgia Power Company's (GPC) submittal date.
GPC is ready to discuss modifications to this status report and will promptly address any questions you might have regarding these licensing issues.
GPC acknowledges and appreciates the recent NRC efforts to complete licensing action on the Radiological Effluent Technical Specifications, Administrative Technical Specifications, Operability Definitions for Unit 2, Generic Letter 84-11, SPDS Electrical Isolation, Post Trip Review, Leak Rate Testing of ADS accumulators, Post Accident Sampling, Snubber Technical Specifications,.and Securi.ty Plan.
We respectfully request your continued efforts to expedite those priority items submitted in support of the-upcoming Unit 1 outage, as noted on the attachment.
If you have further questions, please contact this office at any time.
Very truly yours, 8508230242 850815
~
PDR ADOCK 05000321 zyf f s.,
F PDR L. T. Gucwa Attachment MJB/mb xc:
Mr. J. T. Beckham, Jr.
Mr. H. C. Nix, Jr.
Dr. J. N. Grace (NRC-Region II) hCP Senior Resident Inspector s
Paga N3.
1 08/14/85' OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT TYPE SUBJECT DATE 9 APPROVAL OF ITEM REQUIRED FOR UPCOMMING OUTAGE 770126 321 DO 76-15 ILRT CHANGES 770830 321 DO 76-19 ALLOW USE OF MODIFIED CRANE TO LIFT SPENT FUEL CASK 781003 321 DO 78-16 CHANGE PSW, DIESEL REQUIREMENTS TO REFLECT SWING STATUS OF D/G 1B 790305 321 DO 78-22Rl-REMOVE REFERENCE TO OUTDATED VERSION OF
. APPENDIX J 820927'366 DO 78-30R1 DELETE BUILDING SETTLEMENT SURVEILLANCE -
SUBMIT RESULTS OF ENGINEERING ANALYSIS 830415 321,366 GL 82-33 GENERIC LETTER 82-33 REQUIREMENTS FOR EMERGENCY RESPONSE CAPABILITY 830615 321,366 DO 83-22, DRYWELL PURGE AND VENT CHANGES FOR 18" 83-23 ISOLATION VALVES AND SURVEILLANCE FOR DAMPERS 85-15 831221 321,366 DO REQUIRE H202 ANALYZER CONTINUOUS OPERATION 81-41R1, AFTER LOCA ONLY-81-42R1 840423 366 DO 83-33R2 ATWS RPT CLARIFICATIONS 840905 366 DO 84-25 PRIMARY CONTAINMENT ISOLATION OF PURGE AND VENT ON HI RAD 840912 321 DO 84-10R1 OPERABILITY DEFINITION 840919 321,366 GL 81-11 FRACTURE MECHANICS ANALYSIS PER GENERIC LETTER 81-11 -~FEEDWATER NOZZLE 841001 321,366 DO 82-38 DELETE AERIAL AND TERRESTRIAL MONITORING FROM ETS 841109 321,366 DO 83-30R4 DIESEL GENERATOR SPECIFICATIONS 850111 321 DO 84-35 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
DELETION OF DEFINITION OF " CUMULATIVE DOWNTIME" 850117 321 DO HNP-1 PROPOSED FIRE PROTECTION TECHNICAL 83-08R1,84 SPECIFICATIONS - MODIFICATION TO THE NUMBER
-21 AND LOCATION OF FIRE DETECTORS
P;gs.Ns.
2
- 08/14/85~
OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT TYPE SUBJECT DATE 850215 321,366 DO 83-21 PROPOSED TS CHANGE: DELETION OF PROVISION TO BYPASS HIGH DRYWELL PRESSURE SCRAM 850215 366 DO 81-3R1 TECHNICAL SPECIFICATION CHANGE:
HYDRAULIC 84-38 CONTROL UNIT LOW PRESSURE ALARM SETPOINT AND AUTOMATIC DEPRESSURIZATION SYSTEM TIMER MASTER ~ PARTS LIST NUMBER-REVISION 850311'321,366 DO 84-39 REMOVAL OF 6/30/82 EQUIPMENT QUALIFICATION DEADLINE FROM TECHNICAL SPECIFICATIONS 850319 366 DO 85-04R1 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS EG 0737
- ADS TIMER II.K.3.18 850322 321,366 REVISION TO EMERGENCY OPERATING PROCEDURES, SAFETY PARAMETER DISPLAY SYSTEM AND CONTROL
- ROOM DESIGN REVIEW SCHEDULE 850506 321,366 GL 84-23 PROPOSED MODIFICATIONS AND SCHEDULE FOR REACTOR WATER LEVEL INSTRUMENTATION IMPROVEMENTS - GENERIC LETTER 84-23 850509 366 DO 85-11 REQUEST FOR TECHNICAL SPECIFICATION RELIEF -
OVERCURRENT PROTECTION FOR CONTAINMENT.
PENETRATIONS 850513 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 850520 321 DO 78-18R1 CHANGE TO TECHNICAL SPECIFICATIONS - DELETE REPORTING REQUIREMENTS FOR PRIMARY COOLANT AND SECONDARY CONTAINMENT LEAK RATE 850603 321,366 GL 83-28 REQUEST FOR ADDITIONAL-INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 850624 321 DO 85-06
' EDITORIAL CHANGE TO THE TECHNICAL SPECIFICATIONS TO. CORRECT A TYPOGRAPHICAL ERROR
- HPCI SURVEILLANCE 850625 321,366 INSERVICE TESTING - INSERVICE INSPECTION PROGRAMS UPDATE 850701 321 9 WELD INSPECTION PLAN FOR UNIT 1 OUTAGE 850718 321 S REQUEST FOR CODE RELIEF ON 10 YEAR INSERVICE INSPECTION REQUIREMENTS
Paga N3.
.- 3
'08/14/85 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT TYPE' SUBJECT DATE 850719 321,366 GL 85-02 S SCHEDULE FOR SUBMITTAL FOR PLAN OF ANTICIPATED TRANSIENTS WITHOUT SCRAM MODIFICATIONS FOR NON-SAFETY RELATED EQUIPMENT 850724 321^
DO 83-55R3 9 CHANGE TO TECHNICAL SPECIFICATIONS - ANALOG TRIP TRANSMITTER SYSTEM 850726~321 DO 80-37R1 9 REQUEST TO REVISE TECHNICAL SPECIFICATIONS -
ADD SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND TRANSIENT LIMITS 850801 321 DO 78-17R1 9 REQUEST FOR. TECHNICAL SPECIFICATION RELIEF -
10 YEAR REQUIREMENTS INSERVICE INSPECTION 850802 366 DO 85-07 REQUEST TO REVISE TECHNICAL SPECIFICATIONS -
HYDROGEN RECOMBINER HEATER INTEGRITY TEST SPECIFICATION 1