ML20137E145

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-423/85-61 on 850930-1101.No Violations Noted
ML20137E145
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/09/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20137E149 List:
References
NUDOCS 8601170181
Download: ML20137E145 (2)


See also: IR 05000423/1985061

Text

,-

7

s

  • I

l

l

JAN 091985(e  ;

l

.  !

.

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection Report No. 50-423/85-61

-

This refers to the routine safety inspection conducted by Mr. Henri vanKessel

of this office on September 30 - October 4; October 7-11, October 15-18,

October 21-24, October 28 - November 1,1985, at the Millstone Nuclear Power

Station, Unit 3, Waterford, Connecticut, of activities authorized by NRC License

No. CPPR-113 and to the discussions of our findings held by Mr. H. vanKessel

with Mr. D. B. Miller, Jr. of your staff at the conclusion of the inspection.

.

Areas examined during this inspection are described in the NRC Region'I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

'

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Or,1gical S18 sed BY*

d C

/

g Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-423/85-61

%II Nk

'bl

0FFICIAL RECORD COPY IR MILL 3 85-61 - 0001.0.0

12/12/85

i

_

7-

..

.

Northeast Nuclear Energy Company 2

cc w/ enc 1:

V. Papadopoli, Construction Quality Assurance Supervisor

-E. R. Foster, Director of Generation Construction

E.'J. Mroczka, Vice President, Nuclear Operations

D. 0.:Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

- W.-D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut -

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

G. Walton, SRI,~BV-2

T. Shedlosky, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

-

RI:DRS RI:DRS RI:DRS- RI:

- Fi k mjd va el Es

12/ M/85 12/3//85 12/5 /85 12/_f /85

RI:DRS RI:DRS

enhausen

-

e

M/9 /8C

0FFICIAL RECORD COPY IR MILL 3 85-61 - 0002.0.0

12/12/85

,

Y