NOTICE OF VIOLATION

. Illinois Power Company Docket 50-461 As a. result of the inspection conducted on November 18 through December 16,

- 1985, and in accordance with the " General Policy and Procedures for NRC

. Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the following violation was' identified:

10 CFR 50,. Appendix B, Criterion V, as implemented by the Illinois Power Company Construction Quality Assurance Manual Chapter 5, requires written procedures,-instructions, and drawings be developed and used for activities affecting quality.

Contrary to the above, Baldwin Associates Procedure (BAP) 2.0 was not properly implemented at field document control station Q-2/VT.

BAP 2.0,

. paragraph 5.4.1.C requires the recipient of documents from the Document

-Control Center.to'" process documents in accordance with transmitted instructions." Transmittals J-12381, J-12382, J-12383, J-12384, J-12396, and J-12397 identified numerous design change documents (FECNs, FCRs, ECNs and NCRs) that were to be posted against safety related drawings maintained

- at field document control station Q-2/VT. The postings required by the above

. transmittal instructions were not performed.

This is a Severity Le;e1~ V violation (Supplement II).

During the inspection it was noted that action had been taken to correct the identified violation and to prevent recurrence.

Consequently, no reply to the violation is required and we have no further questions regarding this matter.

JAN10 GB6 R Fis) J e Fated R. F. Warnick, Chief Reactor Projects Branch 1 e