ML20137D903
| ML20137D903 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 08/16/1985 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hintz D WISCONSIN PUBLIC SERVICE CORP. |
| Shared Package | |
| ML20137D908 | List: |
| References | |
| NUDOCS 8508230085 | |
| Download: ML20137D903 (2) | |
See also: IR 05000305/1985009
Text
_.
-
- _ _ _ .
__
,
o
AUG 161985
Docket No. 50-305
Wisconsin Public Service
Corporation
ATTN:
Mr. D. C. Hintz
Manager
Nuclear Power
Post Office Box 19002
Green Bay, WI 54307-9002
Gentlemen:
,
This refers to the routine safety inspection conducted by Mr. W. Snell and
others of this office on July 29 through August 2, 1985, of. activities at the
Kewaunee Nuclear Power Plant authorized by NRC Operating License No. DPR-43
and to the discussion of our findings with Mr. C. Steinhardt and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in this enclosed Appendix.
A written response
,
is required.
'
In addition, a Deviation from a Commitment and an Unresolved Item were
identified during this inspection. A response to these items is not required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
./
/b)
\\
gN0023oo85 85o816
f
a
ADOCK 05000305
l
!
l
.
-
-
-
.
__
.-
.
.
Wisconsin Public Service
2
Corporation
AUG 101985
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
1
.
<
f
W. D. Shafer, Chief
i
Radiological Protection Branch
Enclosures:
!
1.
Appendix, Notice
of Violation
i
2.
Inspection Report
'
No. 50-305/85009(DRSS)
cc w/ enclosures:
r
C. R. Steinhardt, Plant
.
'
Manager
DMB/ Document Control Desk (RIOS)
!
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
[
Ness Flores, Chairperson
!
Wisconsin Pubite Service
i
Commission
!
W. Weaver, FEMA, Region V
D. Matthews, EPB, OIE
l
.
,
I
l
,
'
,
RIII
RIII
RI I
RIII
RI
w
Sh
r
Yi1 pi
'
w
08/12/85
'
l.
-
-
.