OPERATING DATA REPORT Docket No. 50-311 Date January 10,1986 Telephone 935-6000 Completed by Pell White Extension 4455 Uperatino Status 1.
Unit Name Salem No. 2 Notes 2.
Reporting Period December 1985 3.
Licensed Thermal Power (MWt) 3411 4.
Nameplate Rating (Gross MWe) 1170 5.
Design Electrical Rating (Net MWe) 1115 6.
Maximum Dependable Capacity (Gross MWe)1149 7.
Maximum Dependable Capacity (Net MWe) 1106 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A 9.
Power Level to Which Restricted, if any (Net MWe)
N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 8760 36985
- 12. No. of Hrs. Reactor was Critical 237.9 5231.2 20325.8
- 13. Reactor Reserve Shutdown Hrs.
0 0
3S33.6
- 14. Hours Generator On-Line 237.8 4924.7 19536.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 810317
__16018662 59745698
- 17. Gross Elec. Energy Generated
~
(bum) 270000 5298830 19576480
- 18. Net Elec. Energy Generated (MWH) 251709 5017008 18534844
- 19. Unit Service Factor 32.0 56.2 52.8
- 20. Unit Availability Factor 32.0 56.2 52.8
- 21. Unit Capacity Factor (using MDC Net) 30.6 51.8 45.3
- 22. Unit Capacity Factor (using DER Net) 30.3 51.4 44.9
- 23. Unit Forced Outage Rate 0.0
-37.8 37.3
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Peport Period, Estimated Date of Startup:
1/5/86
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2 860117 8
Pa o51231
~
wf agt p
a, N
t L
~
i
' AVERAGE DAILY.~UNITI~ POWER LEVEL-Docket No.:
.50-311' Unit Name-, Salem # 2-Date. December-10,1986
--Completed by Pell White
. Telephone 609-935-6000-Extension -4455
- -Month-December 1985-Day Average Daily Power Level
- Day. Average. Daily' Power Level (MWe-NET)
(MWe-NET)
M 41
- 1
'1093 17 0
},
2 1101
-18 0-
'b 3
1107-19 0
i 4
1083 20 0
s
(
5 1112 21
'O' 6
1095 22 0-7 1091 23 0
f-8 1111 24 0
9 1088 25 0
{
10 925 26 0
t 11 0
27.
0 12 0
28 0
13 0
29 0
l
{
14 0
30-0 1
f 15 0
31 0-i.
16 0
Pg. 8.1-7'R1 3
l N.,
w.
-. ~. _
UNIT SHU'IDOWN AND POWER REDUCTIONS '
'Dockst--No. 50-311 4
REPORT MONTH Dncrmber 1985 Unit Ntme' Snlem No.2 Date.
January 10,1986 Completed by J.P.
Ronafalvy
. Telephone 609-935-6000-Extension ' 4455 i
Method of Duration Shutting License Cause,and Corrective.
,Date Type-
. Hours Reason Down Event System Component.
Action-to-c No..
1 2
Reactor Report Code 4 Code 5~
' Prevent Recurrence
- l HD TURBIN Gland seal steam leaki 322 1210 F
506.2 A
1 i
4 I
i c
i 1-
- 2. Reason
'3 Method 4 Exhibit'G 5 Exh'ibit 1 i
-F: Forced.
A-Equipment Failure-explain
.1-Manual Instructions-Salem.as'.
S: Scheduled'
.B-Maintenance or Test.
2-Manual Scram.
for Prepara-Source <
~
i C-Re fueling 3-Automatic Scram.' tion of-Data l
2D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing-Exam
-Previous Outage for' Licensee
)
F-Administrative 5-Load Reduction.
Event. Report G-Operational Error-explain
-' 9-Other (LER). File.
fH-Other-explain' (NUREG 0161),
4 A
6 9
i.
I w
g e
4 r y -
i.,.
+y e
e
I
. i MAJOR PLANT. MODIFICATIONS'
-DOCKET NO.:
50-311 REPORT MONTH DECEMBER 1985
. UNIT.NAME: Salem 2 DATE:
January:10, 1986 COMPLETED BY:-
.J. Ronafalvy TELEPHONE:
609/339-4455
- DCR NO.
PRINCIPLE SYSTEM SUBJECT.
No major modifications completed this month.
Design Change Request 1
u _ - -. _ -. - _- _ _. - _ _ _ - _ - -,
PSE&G SALEM GENERATING STATION SAFETY RELATED WORK' ORDER LOG SALEM UNIT 2 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 1
0099166798-SMD 2
FIRE DAMPER FAILURE DESCRIPTION:
DAMPER DOES NOT CLOSE ALL THE WAY TO PERMIT CPERATION OF LIMIT SWITCH.
CORRECTIVE ACTION:
SPRING AND SHAFT TWISTED CAUSING BINDING HALFWAY TO THE CLOSE POSITION.
ADJUSTED SHAFT,.WHICH REALIGNED THE DAMPERS.
MADE CLEARANCE.ON SPRING TO RELIEVE BINDING 1
8510080780 SMD 2
22 RC 27 i
FAILURE DESCRIPTION:
VALVE HAS A PACKING. LEAK. MIST RISING FROM THE VALVE.
CORRECTIVE ACTION:
REPACKED VALVE 8510080798
~
SMD 2
H2<4 RC 27 FAILURE DESCRIPTION:
VALVE HAS A-BAD PACKING LEAK. MIST -IS. RISING FROM THE VALVE AND, DRIED BORIC ACID HAS ACCUMULATED IN
- THE AREA.
4 I
i, CORRECTIVE ACTION:'
REMOVED ALL PACKING, REPACKED, CLEANED AREA.
8510260168 SMD.
2 22 MS11 FAILURE DESCRIPTION:
LEAKS PAST SEAT.
1 CORRECTIVE ACTION:
REBUILT VALVE; REPLACED PARTS AS-REQUIRED BY CROSBY REP s
--n w v
+
e
-<~
f a 1
(
1'
' SALEM UNIT-2 t
- WO NO DEPT UNIT EQUIPMENT IDENTIFICATION
- 8510260192 SMD
- 2 22MS15 t
FAILURE DESCRIPTION:
LEAKS PAST. SEAT.
CORRECTIVE ACTION:
REBUILT VALVE INSTALLED NEW PARTS & CUT SEATS AS DIRECTED BY CROSBY.
8510310246 SMD 2
22SI PUMP IN SEAL RETURN FLANGE 1
FAILURE DESCRIPTION:
THE INBOARD SEAL RETURN FLANGE HAS'ONE LOOSE BOLT.
TWO OTHER BOLTS HAVE IMPROPER THREAD' ENGAGEMENT ON NUTS.
-CORRECTIVE ACTION:
-REPLACED ALL STUDS
&. NUTS 8511130284
.SMD 2
l21MS18 FAILURE' DESCRIPTION:-. 21MS18, MAIN STEAM. WARM'UP, IS BLOWING STEAMEFROM UNDERNEATH INSULATION.
1 CORRECTIVE ACTION:--
REPLACED BONNET & SEAT' GASKETS & REPACKED.
i 8512040092 22MS18-22MSIV BYPASS VALVE SMD
-2~
4 FAILURE DESCR.IPTION:' VALVE. IS LEAKING BY VALVE STEM.
4 CORRECTIVE ACTION:
REPACKED VALVE 8512040165 SIC 2.
. CONTROL RODS-t, j.
FAILURE DESCRIPTION:
WHILE IN. AUTO.THE CONTROL 3ODS. STARTED STEPPING FOR'
-NO APPARENT REASON, RODS WERE PLACED IN MANUAL THEN-
-BACK TO : AUTO,.THE ~.~ RODS.DID NOT; MOVE. :
a
~
FOUND SUMMATOR 2QM-4125 WITH'NO OUTPUT, CALLING FOR.
CORRECTIVE ACTION:
I-
. RODS-OUT Mor10N.
REMOVED SN678, & ' INSTALLED - SN.
i f
~
~
..w4--c
-.w..=
,-3<
~
,e w
t-ww
.,se e.,i v:
.r-w e 4
,m..-
, 4.
m
.o
4
.m.
(.
^
SALEM UNIT 2 WO NO
- DEPT UNIT EQUIPMENT -IDENTIFICATION
~
- 8512100699
!-~
SMD 2
22 MS13 -S.G.
SAFEFY VALVE i
i
~
. FAILURE-DESCRIPTION:
DURING THE CONTROLLED SHUTDONN, 22MS13 LIFTED AT 550' DEGREES AND DID NOT-FULLY RESEAT TILL ABOUT 540 DEGREES.
MEANWHILE, THE VALVE CHATTERED SEVERLY.
1
- CORRECTIVE ACTION:
REBUILT VALVE INSTALLED'NEW; PARTS & CUT SEATS AS.
DIRECTED BY CROSBY REP.-
8512161132 SMD 2
SAMPLE VALVE FOR U/2 BIT FAILURE DESCRIPTION:
SAMPLE LINE PLUGGED.- PLEASE~ CHECK HEAT. TRACE /
INSULATION AND UNPLUG LINE.
12/17/85' REPLACED' PRIMARY AND CORRECTIVE ACTION:
UNCLOGGED LINE SECONDARY HEAT TRACE,'REINSULATED.
8512200529 SMD 2 COLD LEG RTD ORIFICE 4
FAILURE DESCRIPTION:
THE RESTRICTING ORIFICE LOCATED UPSTREAM OF 21RC28.
f
. IS LEAKING.
- CORRECTIVE ACTION:
REPLACED ' GASKETS ON THE ORIFICE UPSTREAM OF 21RC28 8512230215.
'SMD.
2 22MS167 PORT VALVE
.l FAILURE DESCRIPTION:
VALVE IS INTERNALLY STUCK IN THE' CLOSED POSITION ~
I IN RESPONSE TO OPS WO98512210087,. I/C CHECKED i
BY STROKING ACTUATOR AFTER' DISCONNECTED ~FROM..
. VALVE STEM.
CORRECTIVE ACTION:
REPACKED VALVE 4
4 i
a 1
-,e
. v---
-e-v r
yi.
i a4 r men w-t'L wr--
w-w ev" w
T-us-N-Wr-w'w a-e-i 4
'-w"-1
-n E
n
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
-- UNIT.NO. 2
. DECEMBER 1985 SALEM UNIT NO. 2 The'. Unit began the period operating at full power. - The-Unit-was removed from service on 12/10/85'at 2149 hours0.0249 days <br />0.597 hours <br />0.00355 weeks <br />8.176945e-4 months <br /> to' weld repair the'high pressure turbine cylinder heating steam lines and repair seat leakage from the Main Steam Safety Valves.. On 12/19/85,- the Unit was'taken to Mode 5 (Cold Shutdown) in support of Nos. 21 and 23 Reactor Coolant-Pumps seal leakage repair.
Also repaired during this. outage was the inlet flange leaks for Pressurizer Safety Valve, 2PR4.
i i
i
~
a 4
6 i
I a
1 1
4 4
m
.m.
..m.
A i 4+
-e-k h AA41 J
~
REFUELING-INFORMATION
. DOCKET NO.:
50-311
. COMPLETED BY :
J.
Ronafalvy UNIT NAME:
Salem.2 DATE:
January 10, 1986 TELEPHONE:- 609/935-6000
-EXTENSION:
4455 Month December 1985 1._
Refueling'information has changed from last month:
YES NO X
2.
Scheduled date for.next refueling:
September'20, 1986-3.
Scheduled date for restart following refueling: -November 19, 1986 4.
A)
Will Technical Specification changes or other license ~
i amendments be required?-
YES NO 3
Not determined to'date l'
B)
Has the reload fuel design been reviewed by the Station
' ~
Operating Review Committee?
YES NO X
If no, when is it schedul'ed?
August 1986~
5.
Scheduled date (s) for submitting proposed licensing action:
August 1986 if required 6.
Important licensing considerations associated with refueling:
i l
NONE
- i 7.
Number of Fuel Assemblies:
A)
Incore 193 j
B)
In Spent Fuel Storage 140 fl 8.
Present licensed spent fuel storage capacity:
1170 4
Future spent fuel storage capacity:
1170 i
9.
Date of last refueling that.can be discharged to spent ' fuel pool assuming the present licensed capacity:
March-2003 8-1-7.R4 1
1 6
4 J
- a--
+,,
.-c
,s-.
y--<
w--
.-,y
-c-
.m-n - - -. -,,
yr--
-- + -
~.
.opsgG 2
- Public Service Electric and Gas Company P.O. Box E - Hancocks Bridge, New Jersey 08038 -
Salem Generatin3 Station January 10,_1986 Director, Office of Inspection and Enforcement
-U.S. Nuclear Regulatory Commission-Washington, DC. 20555
Dear Sir:
MONTHLY' OPERATING REPORT SALEM NO. 2 DOCKET NO.:50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specification, 10 copies of the following monthly operating reports for the month of December 1985 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders-Operating Summary Refueling Information Sincerely yours, 4>
J.
Zuph, Jr..
General Manager'- Salem Operations JR:kcb cc:
Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management
.Information and Program' Control U.S.
Nuclear Regulatory Commission Washington, DC 20555 Enclosures 8-1-7.R4 The Energy People
' 9$ 2t B9(11M) 12 44