Text

50UTH[RN CAuf ORNIA 14 EDISON s

Manager, Plant Licensing LDISOV IATERN4710ML"Gepan)

March 21, 1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 j

Diesel Generator Testing San Onofre Nuclear Generating Station Units 2 and 3

Reference:

Letter, J. L. Rainsberry to U.S. Nuclear Regulatory Commission, Document Control Desk,

Subject:

" Diesel Generator Testing, San l

Onofre Nuclear Generating Station, Units 2 and 3,"

dated February 21, 1997 In the referenced letter, we informed you that the proposed changes to Technic-1 Specification (TS) 3.8.1, "#C Sources - Operating" resulting from our re-review of our implementation of the Technical Specification Improvement i

Program (TSIP) would be submitted by March 21, 1997. However, our ongoing l

review of these changes will require additional time to complete this submittal. Our revised schedule for submittal of the changes to TS 3.8.1 is May 2, 1997.

j If you would like additional information, please let me know.

4 Sincerely, b('

Enclosures i

f cc:

E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 EG0070 i

P 00 San Onofre Nuclear Generating Station I

%,h5 kI,h P. O.Ikn 128 San Clemente. CA 92674-0128 714-%x 7470 p

9703260217 970321 PDR ADOCK 05000361 (p