ML20137C531

From kanterella
Jump to navigation Jump to search
Provides Rept of Results of Core Spray Piping & Sparger Insps & Evaluations of Indications.Ltr & GE Rept Provide Insp Results & Flaw Evaluations
Date released: 05/30/2020 Download: ML20137C531


Rev 1 to GE-NE-B13-01869-02, Internal Core Spray Line Flaw Evaluation for Pilgrim Nuclear Power Station.
ML20137C547
Person / Time
Site: Pilgrim
Issue date: 03/18/1997
From: Bothne D, Methta H
GENERAL ELECTRIC CO.
To:
References
Download: ML20137C547 (25)
Evaluation of Indications Detected in Annulus Core Spray Piping at Pilgrim Nuclear Station.
ML20137C534
Person / Time
Site: Pilgrim
Issue date: 03/18/1997
From: Bothne D, Mehta H
GENERAL ELECTRIC CO.
To:
References
Download: ML20137C534 (6)
Provides Rept of Results of Core Spray Piping & Sparger Insps & Evaluations of Indications.Ltr & GE Rept Provide Insp Results & Flaw Evaluations
ML20137C526
Person / Time
Site: Pilgrim
Issue date: 03/18/1997
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20137C526 (8)