ML20137C501
| ML20137C501 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/13/1997 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20137C321 | List: |
| References | |
| LCV-0988, LCV-988, NUDOCS 9703250023 | |
| Download: ML20137C501 (1) | |
Text
.~
- ~-
~.
i e
a Georgia Powtr Compzny.
4 40 invimess Contir Parkway
- Post offee Box 1295 Birmingham. Alabama 35201 Telephone 205 992-7122 j
I GeorgiaPower
)
P es nt, Nuclear vogti Project liarch 13, 1997 LCV-0988
(-
Docket Nos. 50-424 50-425 i
U; S. Nuclear Regulatory Commission.
ATTN:- Document Control Desk Washington, D. C. 20555 Gentlemen:
)
i VOGTLE ELECTRIC GENERATING PLANT 1
1996 ANNUAL REPORT - PART 1 l
In accordance with the applicable regulatory requirements, Georgia Power Company hereby.
submits Part 1 of the 1996 Annual Report ofoperating information. Part 2 of the 1996 Annual Report will be submitted by May 1,1997.
{
Sincerely, C. K. McCoy CKM/JLL
Enclosure:
AnnualReport-Part 1 cc:
Georgia Power Company Ji I
Mr. J. B. Beasley, Jr.
h-Jk;'
Mr. M. Sheibani NORMS l
U. S. Nuclear Regulatory Commission i
. Mr. L.A. Reyes, Regional Administrator
]
Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle Mr. E. S. Beckjord, Director, Office of Nuclear Regulatory Research 1
9703250023 970313 T
(
PDR ADOCK 05000424 R
pyg pppsppppppy l
i