ML20137C501

From kanterella
Jump to navigation Jump to search
Forwards Part 1 of 1996 Annual Rept of Operating Info.Part 2 of 1996 Annual Rept Will Be Submitted by 970501
ML20137C501
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/13/1997
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137C321 List:
References
LCV-0988, LCV-988, NUDOCS 9703250023
Download: ML20137C501 (1)


Text

.~

- ~-

~.

i e

a Georgia Powtr Compzny.

4 40 invimess Contir Parkway

- Post offee Box 1295 Birmingham. Alabama 35201 Telephone 205 992-7122 j

I GeorgiaPower

)

P es nt, Nuclear vogti Project liarch 13, 1997 LCV-0988

(-

Docket Nos. 50-424 50-425 i

U; S. Nuclear Regulatory Commission.

ATTN:- Document Control Desk Washington, D. C. 20555 Gentlemen:

)

i VOGTLE ELECTRIC GENERATING PLANT 1

1996 ANNUAL REPORT - PART 1 l

In accordance with the applicable regulatory requirements, Georgia Power Company hereby.

submits Part 1 of the 1996 Annual Report ofoperating information. Part 2 of the 1996 Annual Report will be submitted by May 1,1997.

{

Sincerely, C. K. McCoy CKM/JLL

Enclosure:

AnnualReport-Part 1 cc:

Georgia Power Company Ji I

Mr. J. B. Beasley, Jr.

h-Jk;'

Mr. M. Sheibani NORMS l

U. S. Nuclear Regulatory Commission i

. Mr. L.A. Reyes, Regional Administrator

]

Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle Mr. E. S. Beckjord, Director, Office of Nuclear Regulatory Research 1

9703250023 970313 T

(

PDR ADOCK 05000424 R

pyg pppsppppppy l

i