VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 NRC DOCKETS 50-424/425 OPERATING LICENSE NPF-68/81 1996 ANNUAL REPORT-PART 1 TABLE OF CONTENTS PAGE I.

INTRODUCTION 1

II.

TECHNICAL SPECIFICATION 5.6.1 - REPORT OF 2

PERSONNEL EXPOSURE GREATER THAN 100 MREM /YR.

9703240222 970313

  • PDR ADOCK 05000424 R

PDR

l VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 1996 ANNUAL REPORT-PART I INTRODUCTION 1

The Vogtle Electric Generating Plant Units 1 and 2 are powered by pressurized water reactors, each rated at 3565 megawatts thermal. It is located on the Savannah River in Burke County Georgia, at a site 34 miles southeast of Augusta.

The Unit 1 operating license was initially received on January 16,1987 and commercial operation l

started on May 31,1987. Unit 1 is in its seventh fuel cycle.

Unit 2 received its initial operating license on February 9,1989, and began commercial operation on May 19,1989. Unit 2 is currently in its sixth fuel cycle.

i l

1

II VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 1996 ANNUAL REPORT - PART 1 TECIINICAL SPECIFICATION 5.6.1 REPORT OF PERSONNEL EXPOSURE GREATER THAN 100 MREMNR

  1. PERSONNEL (>100 MREM)

TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT Reactor Operations & Sury.

Maint & Construction 15 0

6 4.602 0.303 2.279 Operations 45 0

0 13.271 0.037 0.092 Health Physics & Lab 36 6

37 10.168 1.849 14.011 Supenisory & Office Staff 2

0 1

1.122 0.028 0.486 Engineering Staff 1

0 0

0.553 0.001 0.179 Routine Plant Maintenance Maint, & Construction 18 1

22 7.507 0.172 9.975 Operations 6

0 0

2.794 0.088 0.048 Health Physics & Lab 55 1

5 15.926 0.236 3.104 Supenisory & Office Staff 1

0 1

0.442 0.007 0.697 Engineering Staff 1

0 0

0.584 0.000 0.120 Insenice Inspection Maint. & Construction 1

0 29 0.622 0.008 15.032 Operations 10 0

0 3.048 0.000 0.000 Health Physics & Lab 0

0 0

0.043 0.000 0.011 Supenisory & Oflice Staff 1

1 16 0.418 0.239 5.802 i

Engineering Staff 2

0 7

0.429 0.051 2.976 Special Plant Maintenance

  • i Maint. & Construction 111 8

200 89.881 4.068 112.194 Operations 19 1

0 14.348 1.427 0.200 Health Physics & Lab 24 2

6 6.716 0.365 2.875 Supenisory & Office Staff 9

1 15 5.455 0.193 8.404 Engineering Staff 8

1 11 3.597 0.174 5.780 1

  • - Refers to special maintenance not usually performed during normal operations. Most major maintenance is associated with outages. Examples of special maintenance performed in 1996 include: reactor coolant pump seal and motor work, steam generator tube testing and plugging, replacement of incore detectors, and major outage related maintenance.

2

e II(CONTINUED)

VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 1996 ANNUAL REPORT-PART 1 1

1 l

TECIINICAL SPECIFICATION 5.6.1

)

REPORT OF PERSONNEL EXPOSURE GREATER TIIAN 100 MREM /YR

  1. PERSONNEL (>100 MREM)

TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT Waste Processing Maint. & Construction 0

0 1

0.200 0.000 0.185 Operations 5

0 0

3.452 0.000 0.049 Health Physics & Lab 15 0

46 10.603 0.053 21.371 Supervisory & Office Staff 1

0 0

0.265 0.000 0.000 Engineering Staff 0

0 0

0.001 0.000 0.000 Refueling Maint. & Construction 11 1

13 4.430 0.222 12.374 Operationns 10 0

1 3.364 0.000 1.188 Health Physics & Lab 9

0 19 4.439 0.007 7.883 Supervisory & Office Staff 1

0 6

0.219 0.001 3.388 Engineering Staff 1

0 5

0.343 0.000 3.148 i

Totals Maint & Construction 156 10 271 107.242 4.773 152.039 Operations 95 1

1 40.277 1.552 1.577 I

Health Physics & Lab 139 9

113 47.895 2.510 49.255 Supervisory & Office Staff 15 2

39 7.921 0.468 18.777 Engineering Staff 13 1

23 5.507 0.226 12.203 l

Grand Totals 418 23 447 208.842 9.529 233.851 Total radiation exposure is 452.222 Rem (226.111 Rem per unit) which constitutes 100% of the site exposure for the year.