VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 NRC DOCKETS 50-424/425 OPERATING LICENSE NPF-68/81 1996 ANNUAL REPORT-PART 1 TABLE OF CONTENTS PAGE I.
INTRODUCTION 1
II.
TECHNICAL SPECIFICATION 5.6.1 - REPORT OF 2
PERSONNEL EXPOSURE GREATER THAN 100 MREM /YR.
9703240222 970313
- PDR ADOCK 05000424 R
l VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 1996 ANNUAL REPORT-PART I INTRODUCTION 1
The Vogtle Electric Generating Plant Units 1 and 2 are powered by pressurized water reactors, each rated at 3565 megawatts thermal. It is located on the Savannah River in Burke County Georgia, at a site 34 miles southeast of Augusta.
The Unit 1 operating license was initially received on January 16,1987 and commercial operation l
started on May 31,1987. Unit 1 is in its seventh fuel cycle.
Unit 2 received its initial operating license on February 9,1989, and began commercial operation on May 19,1989. Unit 2 is currently in its sixth fuel cycle.
i l
1
II VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 1996 ANNUAL REPORT - PART 1 TECIINICAL SPECIFICATION 5.6.1 REPORT OF PERSONNEL EXPOSURE GREATER THAN 100 MREMNR
- PERSONNEL (>100 MREM)
TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT Reactor Operations & Sury.
Maint & Construction 15 0
6 4.602 0.303 2.279 Operations 45 0
0 13.271 0.037 0.092 Health Physics & Lab 36 6
37 10.168 1.849 14.011 Supenisory & Office Staff 2
0 1
1.122 0.028 0.486 Engineering Staff 1
0 0
0.553 0.001 0.179 Routine Plant Maintenance Maint, & Construction 18 1
22 7.507 0.172 9.975 Operations 6
0 0
2.794 0.088 0.048 Health Physics & Lab 55 1
5 15.926 0.236 3.104 Supenisory & Office Staff 1
0 1
0.442 0.007 0.697 Engineering Staff 1
0 0
0.584 0.000 0.120 Insenice Inspection Maint. & Construction 1
0 29 0.622 0.008 15.032 Operations 10 0
0 3.048 0.000 0.000 Health Physics & Lab 0
0 0
0.043 0.000 0.011 Supenisory & Oflice Staff 1
1 16 0.418 0.239 5.802 i
Engineering Staff 2
0 7
0.429 0.051 2.976 Special Plant Maintenance
- i Maint. & Construction 111 8
200 89.881 4.068 112.194 Operations 19 1
0 14.348 1.427 0.200 Health Physics & Lab 24 2
6 6.716 0.365 2.875 Supenisory & Office Staff 9
1 15 5.455 0.193 8.404 Engineering Staff 8
1 11 3.597 0.174 5.780 1
- - Refers to special maintenance not usually performed during normal operations. Most major maintenance is associated with outages. Examples of special maintenance performed in 1996 include: reactor coolant pump seal and motor work, steam generator tube testing and plugging, replacement of incore detectors, and major outage related maintenance.
2
e II(CONTINUED)
VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 & 2 1996 ANNUAL REPORT-PART 1 1
1 l
TECIINICAL SPECIFICATION 5.6.1
)
REPORT OF PERSONNEL EXPOSURE GREATER TIIAN 100 MREM /YR
- PERSONNEL (>100 MREM)
TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT Waste Processing Maint. & Construction 0
0 1
0.200 0.000 0.185 Operations 5
0 0
3.452 0.000 0.049 Health Physics & Lab 15 0
46 10.603 0.053 21.371 Supervisory & Office Staff 1
0 0
0.265 0.000 0.000 Engineering Staff 0
0 0
0.001 0.000 0.000 Refueling Maint. & Construction 11 1
13 4.430 0.222 12.374 Operationns 10 0
1 3.364 0.000 1.188 Health Physics & Lab 9
0 19 4.439 0.007 7.883 Supervisory & Office Staff 1
0 6
0.219 0.001 3.388 Engineering Staff 1
0 5
0.343 0.000 3.148 i
Totals Maint & Construction 156 10 271 107.242 4.773 152.039 Operations 95 1
1 40.277 1.552 1.577 I
Health Physics & Lab 139 9
113 47.895 2.510 49.255 Supervisory & Office Staff 15 2
39 7.921 0.468 18.777 Engineering Staff 13 1
23 5.507 0.226 12.203 l
Grand Totals 418 23 447 208.842 9.529 233.851 Total radiation exposure is 452.222 Rem (226.111 Rem per unit) which constitutes 100% of the site exposure for the year.