ML20137C189

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Changes,Deleting Sections Associated W/ Requirement That Valves in Equalizer Piping Between Recirculation Loops Be Closed During Reactor Operation
ML20137C189
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/15/1985
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20137C169 List:
References
NUDOCS 8511260459
Download: ML20137C189 (3)


Text

VYNPS 3.6 LIMITING CONDITION FOR CPERATION 4.6 SURVEILLANCE REQUIREMENT E.

Structural Intezeity E.

Structural Integrity The structural intergrity of the primary The nondestructive inspections listed in syctem boundary shall be maintained at the Table 4.6.1 shall be performed per the level required by the original acceptance requirements of the 1974 edition of ASME, standards throughout the life of the plant.

Section II, up to and including the 1975 Summer Addenda except piping examinations (Cat. F & J) shall be per the requirements of ASME Section II, 1974 edition, 1976 Summer Addenda, Appendix III.

F.

Jet Pumps Recording levels shall be at 50% of the 1.

Whenever the reactor is in the reference level, startup/ hot standby or run modes, all jet pumps shall be intact and all F.

Jet Pumps operating jet pumps shall be operable.

If it is determined that a jet pump is 1.

Whenever there is recirculation flow inoperable, an orderly shutdown shall be with the reactor in the startup/ hot initiated and the reactor shall be in a standby or run modes, jet pump integrity cold situation condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and operability shall be checked daily by verifying that the following two 2.

Flow indication from each of the twenty conditions do not occur simultaneously:

jet pumps shall be verified prior to initiation of reactor strtup from a cold a.

The recirculations pump flow shutdown condition.

differs by more than 10% from the established speed-flow 3.

The indicated core flow is the sum of characteristics.

the flow indication from each of the twenty jet pumps.

If flow indication b.

The indicated total core flow is failure occurs for two or more jet more than 10% greater than the core pumps, immediate corrective action shall flow value derived from established be taken. If flow indication for all power-core flow relationship.

but one jet pump cannot be obtained within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> an orderly shutdown 2.

Additionally, when operating with one shall be initiated and the reactor shall recirculation pump,the diffuser to lower be in a cold shutdown condition within plenum differential pressure shall be 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

checked daily, and the differential pressure of any jet pump in the idle loop shall not vary by more than 10%

B511260459 651115 from established patterns.

hDR ADOCK O

{1 Amendment No. 45 109

I I

VYMPS 3.6 LIMITING CONDITION FOR OPERATION 4.6 SURVEILLANCE REQUIREMENT 3.

The baseline data required to evaluate the conditions in Specifications 4.6.F.1 and 4.6.F.2 shall be acquired each operating cycle.

C.

Sinale Loop Operation 1.

Operation with a single recirculation loop is permitted for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless the l

recirculation loop is sooner made operable.

If the loop cannot be made operable, the l

reactor shall be in cold shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

H.

Recirculation System

(

1.

This section deleted.

1 1

e Amendment No. 29

^

ilo e

VYMPS 3.6 & 4.6 (cont'd)

~

h following factors form the basis for the surveillance requirements:

A break in a jet pump decreases the flow resistance characteristic of the external piping loop causing the recirculation pump to operate at a higher flow condition when compared to previous operation.

l h change in flow rate of the failed jet pump produces a change in the indicated flow rate of that pump l

relative to the other pumps in that loop. Comparison of the data with a normal relationship or pattern

)

provides the indication necessary to detect a failed jet pump.

l l

h jet pump flow deviation pattern derived from the diffuser to lower plenum differential pressure readings will be used to further evaluate jet pump operability in the event that the jet pumps fail the test in Specifications 4.6.F.1 and 2.

Agreement of indicated core flow with established power-core flow relationships provides the most assurance that

(

recirculation flow is not bypassing the core through inactive or broken jet pumps. This bypass flow is reverse l

with respect to normal jet pump flow. N indicated total core flow is sunsation of the flow indications for the twenty individual jet pumps. h total core flow measuring instrumentation suas reverse jet pump flow as though it were forwarded flow. Thus, the indicated flow is higher than actual corc flow by at least twice the normal flow through any backflowing pump. Reactivity inventory is known to a high degree of confidence so that even if a jet pump failure occurred during a shutdown period, subsequent power e.scension would promptly i

demonstrate abnormal control rod withdrawal for any power-flow operating map point.

A nozzle-riser system failure could also generate the coincident failure of a jet pump body; however, the I

converse is not true. The lack of any substantial stress in the jet pump body makes failure impossible without an initial nozzle-riser system failure.

C.

Single Loop Operation An evaluation was not provided for ECCS p.cformance during reactor operation with one recirculation loop out of service. N eefore, reactor operation for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> under such conditions will not be authorized until the necessary analyses have been performed, evaluated and deemed acceptable.

M.

Recirculation System

, This section deleted.

Amendment No. 29 124


---