Forwards Insp Rept 50-322/85-21 on 850409-0510.No Violation Noted.Insp Follows Up on G Henry Technical Concerns Re Emergency Sirens & Concrete Grout Repairs.Emergency Siren Problem Substantiated
ML20137B717
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 08/15/1985
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leaonard J
LONG ISLAND LIGHTING CO.
Shared Package
ML20137B720 List:
References
NUDOCS 8508220123
Download: ML20137B717 (2)


See also: IR 05000322/1985021

Text

e-

f (r'f Y '

o

a s W>S

sp -

Docket No. 50-322

Long Island Lighting Company

ATTN: Mr. John D. Leonard, Jr.

Vice President - Nuclear

P. O. Box 618

~Shoreham Nuclear Power Station

Wading River, New York 11792

Gentlemen:

'

Subject: 50-322/85-21

A special' inspection was conducted by Mr. E. M. Kelly of this office during the

period April 9 - May 10, 1985, regarding allegations concerning Shoreham

Station made by two former LILC0 employees. The concerns were originally

expressed in two newspaper articles; one published in The Suffolk Times on

~

January 17, 1985, and the other published in The Riverhead News Review on

January 25, 1985.

In response to the first newspaper article, NRC Region I conducted Inspec-

tion No. 50-322/85-10 at Shoreham on January 28-31, 1985. A report of that

inspection was issued on February 19, 1985. To better understand and define

the nature of the concerns, interviews were conducted by Region I personnel

~

with the alleger, Mr. George Henry, on February 19 and 27, 1985. This inspec-

tion followed-up Mr. Henry's eight original technical concerns, plus two new

concerns related to emergency sirens and concrete grout repairs. While we did

substantiate that a problem does exist with the motor contacts on those

sirens, which your staff had previously identified and is correcting, no addi-

tional problems were identified during this inspection which would change our

preliminary conclusions documented in Inspection Report 50-322/85-10. This

concludes NRC Region I's inspection of the technical allegations presented by

Mr. Henry.

Following the second newspaper article, an interview was conducted with that

alleger, Mr. Ron Stanchfield, on February 4,1985. This inspection also

addressed the three technical concerns presented by Mr. Stanchfield, finding

them to be unsubstantiated and in some cases insignificant. No further in-

,

spection of these issues is expected.

No violations of NRC requirements were found during this inspection, and a

8508220123 850815

PDR ADOCK 05000322

O PDR

OFFICIAL RECORD COPY IR SHOREHAM 85-21 - 0001.0.0

08/06/85 g\

o\

L

.

4

2

reply to this letter is not required. The cooperation of your staff with us

during this inspection is appreciated.

Sincerely,

Richard W. Starostecki, Director

Division of Reactor Projects

Enclosure: NRC Region I Inspection 50-322/85-21

cc w/ encl:

W. Steiger, Plant Manag::-

J. Smith, Manager, Nuclear Operations Support

R. Kubinak, Director, QA, Safety and Compliance

E. Youngling, Manager, Nuclear Engineering

Edward M. Barrett, Esquire

Jeffrey L. Futter, Esquire

J. Notaro, Manager, QA Department

Shoreham Hearing Service List

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

Region I Docket Room (with concurrences) /

Senior Operations Officer (w/o encl)

- Director, DRSS

Director, DRS

J. Strosnider

B. Bordenick, ELD

R. Caruso, LPM, NRR

K. Christopher, 01-Region I

A. Shropshire

G. Henry

R. Stanchfield

R._M. Kessel, NY State Consumer Protection Board

T. Ward, NRC-0IA

'

f -

fD

RI:DRP

Kelley

8/8/85

[]h)RI:DRP.

Strosnider

V 8/8/85

R RP

Kister

8/lL/85

arostecki

8/13/85

0FFICIAL RECORD COPY IR SHOREHAM 85-21 - 0001.1.0

08/06/85