ML20137B608
| ML20137B608 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/07/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20137B611 | List: |
| References | |
| NUDOCS 8601150585 | |
| Download: ML20137B608 (3) | |
See also: IR 05000424/1985035
Text
~
yeynJ
-
..
.
.
.
-
3 .r =
.
peorgia Power' Company
/ ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NO. 50-424/85-35
On December 18, 1985, NRC transmitted the subject report of NRC inspection
conducted at your Vrgtle facility.
The inspection report referred to included
tables which provided details of the items examined during the inspection.
Due to an administrative error, sheet 3 of Table 4 and Tables 5 through 12 in
their entirety were not included in the inspection report transmitted December 18,
1985. To correct that error, the enclosed Tables 5 through 12 should be attached
to the report forwarded to you earlier.
Should you have any questions concerning this letter, please contact us.
Sincerely,
- cmons46 seMe sy
MHN A, OLSMediq
J. Nelson Grace
Regional Administrator
.
Enclosure:
Tables 5 through 12 and sheet 3 of
Table 4 Report 50-424/85-35
gc w/ encl:
SR. E. Conway, Senior Vice President
d.NuclearPower
O. Foster, Vice President
d.andGeneralManagerVogtleProject
H. Gregory, III, General
d. Manager, Vogtle Nuclear Construction
Bockhold, Jr., Vogtle
I. Plant Manager
T. Gucwa, Chief
Nuclear Engineer
cc w/ encl:
(cont'd on page 2)
0601150585 B60107
ADOCK 0 % 4
-.
-
-
.
.
.
.
- \\ \\
leo l
,i
-.
-
.
,
- '
' D,
+
.
,,
- . -
Georgia Power Company
3
JAN 0 7 15EE
!
c W/ encl:
. Reis, ELD
M Sinkule, RII
,
RC Resident Inspector
Document Control Desk
b lefeski N
'U
I
l
l
'
!
I
L
,
!
.
f
I
_
.
--
'
-
l
ta
RII//
RII M
I
RI
RII
EGirard:bhg
GHallstrom
JBlake
AH&dt
AGibaon
,
1/e/86
1/4/86
1/ 2./86
1/p/86
-1/2/86
l
RII
RII
RI
RII
,
MSinkule
niee
RWalker
J01
iiski
1/3/86
/86
1/ /86
1/ 3 /86
,
---l--.- .------- ---..-.--- .-
.-.- --- -
-
.
'
- . . '
~
Georgia Power Company
2
JAN 0y m
<
(cccont'd)
IubleA. Thomas,
Vice President-Licensing Vogtle
, Project
6kdGroover, Quality
d,AssuranceSiteManager
',
W. Hayes, QA Manager
'
vd. T. Beckham, Vice President
cd.&GeneralManager-Operations
A. Bailey, Project Licensing
,
Manager
-
deorgeF.Trowbridge,Esq.
Shaw, Pittman, Potts and Trowbridge
vffruce W. Churchill, Esq.
'
q
,Shaw, Pittman, Potts and Trowbridge
ifrnest L. Blake, Jr. , Esq.
'
!
Shaw, Pittman, Potts and Trowbridge
James E. Joiner, Troutman, Sanders,
d
Lockerman and Ashmore
dames G. Ledbetter, Comissioner
'
,
, Department of Human Resources
],
5tharles H. Badger, Office of
Planning and Budget, Management
1
Review Division
- 1
odeppishKirkland,III, Counsel
Office of the Consumer's Utility
q
, Council
60ouglas C. Teper, Georgians Against
J
Nuclear Energy
1
c[aurieFowler,Esq.,LegalEnvironmental
/ ssistance Foundation
A
j
6 Tim Johnson, Executive Director
- t
Campaign for a Prosperous Georgia
"
- Morton B. Margulies, Esq., Chairman
a
Administrative Judge, Atomic Safety
!i
and Licensing Board Panel
cifr. Oscar H. Paris, Administrative Judge
Atomic Safety and Licensing Board Panel
!j
dustave A. Linenberger, Jr., Administrative
4
Judge, Atomic Safety and Licensing Board
u
Panel
i}
LB'illie Pirner Garde, Citizens
Clinic Director, Governenent
j
Accountability Project
1
a
i
h
J