Monthly Operating Rept for June 1976
ML20137B545
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/30/1976
From: Gil C, Graves R
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20137B401 List:
References
FOIA-85-723 CYH-3336, NUDOCS 8511260292
Download: ML20137B545 (5)


Text

s t

CONNECTICUT YAfil'.EE AT0f1IC POWER COMPAtlY llADDAM fiECK PLANT HADDAM, C0flNECTICUT r

MONTilLY OPERATING DATA REPORT fl0. 76-6 FOR Tile M0flTil 0F JUtlE, 1976 8511260292 851119 PDR FOIA RATHJE85-723 PDR

w.

c_. -

. _.. _~

DOCKET NO.

Sd-213 Connecticut Yankee UNIT Haddam fleck OPERATIf;G DATA REPORT DATE 7/6/76 COMPLETED BY C.A. Gil TELEPl10NE (203) 267-2556 OPERATING STATUS 1.

REPORTING PERIOD:

June 1976 GROSS HOURS IN REPORT!!!G PERIOD:

720 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

1825 MAX. DEPEND. CAPACITY (ifde-Net):

540 DESIG1 ELECTRICAL RATIriG (Hue-tiet):

575 3.

POWER LEVEL TO WHICH RESTRICTED (IF A*iY) (M'Je-Net):

flone 4.

REA5015 FOR RESTRICTION (IF ANY):

N/A THIS CUMULATIVE

?

l REPORTING PERIOD YR. TO DATE TO DATE i

5.

NUMBER OF HOURS T!!E REACTOR WAS I

CRITICAL...............

0 3300.01 63112.9 6.

REACTOR RESERVE SHUTD0'4N HOURS......

0 55.39 674.21

+

)

f 7.

HOURS GENERATOR ON-LINE.........

0 3271.15 59718.5 l

8.

UNIT RESERVE SirJTDOW'i HOURS.......

0 0

0

}

9.

GROSS THERMAL Ef;ERGY GENERATED (!*4H)...

0 5.864,060 102,581.622

10. GROSS ELECTRICAL ENERGY GENERATED (KlH).

0 1,910,444 33,563,425

11. NET ELECTRICAL ENEPGY GENERATED (>"JH)..

0 (-1883) 1,819,796.7 31,906,163

12. REACTOR SERVICE FACTOR..........

fl/A 75.57 84.72

13. REACTOR AVAILABILITY FACTOR.......

0 76.84 85.63 l

14. UNIT SERVICE FACTOR...........

0 74.91 80.16 i

15. UNIT AVAILABILITY FACTOR.........

0 74.91 80.16 f

16. UNIT CSPACITY FACTOR (USING !!DC).....

0 77.17 79.77

17. U'llT CAPACITY FACTOR (USING DESIGN Kle).

0 72.47 73.29

{

18. UNIT FORCED OUTAGE RATE.........

0 1.91 9.76

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYFE, DATE AND DURATION OF EACll:)

l J

20. IF SHUTDOWN AT END OF REPORT PERIOD, EST! MATED DATE OF STARTUP:

l

21. ELAPSEDTIME(HOURS) 720 4367 74495 l
  • SINCE DATE OF COMMERCIAL OPERATION 1-1-68 l

i L

= - -. - -

DOCKET t10.

50-213

Conn. Yankee 4

Ha m Neck UNIT SHUTOOWNS AND POWER REDUCTIONS DATE-7/6/76 COMPLETED BY C.A. Gil

,'.T

- TELEPHONE (203) 267-2556

REPORT M0flTH June, 1976 i

i Type Method of

4 F
Forced Duration Shutting Down

?

l tio.

Date S: Scheduled (Hours)

Reason (1)

TheReactor(2)

Corrective Actions /Coments e i

4 I

o 123-6-7 76-05-19 S

1032 C

2 1976 Refueling and Maintenance Outage.

i fl0TE:

+

The follosing unit shutdown numbers:.J l.,

. I ig:

should be corrected as shown below:

., g fiUMBER CORRECT t

DATE '

GIVEll NUMBER 76-01-22 104-6-3 120-6-4 76-04-02 105-6-4 121-6-5

};

76-04-28 106-6-5 122-6-6 4

76-05-18 107-6-6 123-6-7 108-6-7 4

l.

(1) Reason I'

SUMMARY

The plant was shutdown the entire month (2) Method i

for Reactor Refueling and General A-Equipment Failure (Explain) 1-Manual B-Maint. or Test Naintenance.

2-Manual Scram.

J-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Other(Explain)

~ '

E-Operator Training and i

J License Examination.

F-Administrative G-Operational Error (Explain)

H-Other(Explain)

= _ _...

n___

y DOCKET NO.

50-213 1

Connecticut Yankee i'

UNIT lladdam fleck l

l i

~

DATE 7-7-76 COMPLETED BY C. A. Gil i

l AVERAGE DAILY UllIT POWER LEVEL M0imi June, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (ff,4e-ne t)

-1 0

17 0

i 2

0 18 0

3 0

19 0

4 0

2'O O

5 0

21 0

l

^

i 6

0 22 0

\\

f i

0 23' 0

8 0

24 0

9 0

25 0

l l

l 10 0

26 0

4 11 0

27 0

12 0

28 0

j

'13 0

29 0

4 14 0

30 0

15 0

31 i

16 0

L i

j l

1 i

s..

a g,

~

g 5-POWER COMPANY

'...o CONNECTICUT YANKEE AT O M IC ff ",

~[

H ADDAM NECK PLANT k'

nR #1. DOX 127C. EAST HAMPTON, CONN. 06424 s

July 7, 1976 f

CYli - 3336 i

Director, Office of Inspection and Enforcement l

U. S. Nuclear Regulatory Commission I

Washington, D. C.

20555 i

i i

I l

1

Dear Sir:

l In accordance with reporting requirements the Connecticut J

Yankee Haddam Neck Monthly Operating Data Report 76-6, covering operations for the period of June 1,1976 to June 30, 1976 is hereby forwarded.

?

d Very truly yours, W%

i R. H. Graves l

Plant Superintendent 1

RHG/CAG:ms

[

Enclosure

)

cc:

(1) Director, Region I Division of Insocction & Enforcement O. S. Nuclear Regulatory Commission 631 Park Avenue i

King of Prussia, Pa.

19406 j

(2) Director, Office of Management Information and Program j

Control

[

i U. S. Nuclear Regulatory Commission i

I Washington, D. C.

20555 j

1 i,

l l

s J-1

-