Text
s t
CONNECTICUT YAfil'.EE AT0f1IC POWER COMPAtlY llADDAM fiECK PLANT HADDAM, C0flNECTICUT r
MONTilLY OPERATING DATA REPORT fl0. 76-6 FOR Tile M0flTil 0F JUtlE, 1976 8511260292 851119 PDR FOIA RATHJE85-723 PDR
w.
c_. -
. _.. _~
DOCKET NO.
Sd-213 Connecticut Yankee UNIT Haddam fleck OPERATIf;G DATA REPORT DATE 7/6/76 COMPLETED BY C.A. Gil TELEPl10NE (203) 267-2556 OPERATING STATUS 1.
REPORTING PERIOD:
June 1976 GROSS HOURS IN REPORT!!!G PERIOD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
1825 MAX. DEPEND. CAPACITY (ifde-Net):
540 DESIG1 ELECTRICAL RATIriG (Hue-tiet):
575 3.
POWER LEVEL TO WHICH RESTRICTED (IF A*iY) (M'Je-Net):
flone 4.
REA5015 FOR RESTRICTION (IF ANY):
N/A THIS CUMULATIVE
?
l REPORTING PERIOD YR. TO DATE TO DATE i
5.
NUMBER OF HOURS T!!E REACTOR WAS I
CRITICAL...............
0 3300.01 63112.9 6.
REACTOR RESERVE SHUTD0'4N HOURS......
0 55.39 674.21
+
)
f 7.
HOURS GENERATOR ON-LINE.........
0 3271.15 59718.5 l
8.
UNIT RESERVE SirJTDOW'i HOURS.......
0 0
0
}
9.
GROSS THERMAL Ef;ERGY GENERATED (!*4H)...
0 5.864,060 102,581.622
- 10. GROSS ELECTRICAL ENERGY GENERATED (KlH).
0 1,910,444 33,563,425
- 11. NET ELECTRICAL ENEPGY GENERATED (>"JH)..
0 (-1883) 1,819,796.7 31,906,163
- 12. REACTOR SERVICE FACTOR..........
fl/A 75.57 84.72
- 13. REACTOR AVAILABILITY FACTOR.......
0 76.84 85.63 l
- 14. UNIT SERVICE FACTOR...........
0 74.91 80.16 i
- 15. UNIT AVAILABILITY FACTOR.........
0 74.91 80.16 f
- 16. UNIT CSPACITY FACTOR (USING !!DC).....
0 77.17 79.77
- 17. U'llT CAPACITY FACTOR (USING DESIGN Kle).
0 72.47 73.29
{
- 18. UNIT FORCED OUTAGE RATE.........
0 1.91 9.76
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYFE, DATE AND DURATION OF EACll:)
l J
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, EST! MATED DATE OF STARTUP:
l
- 21. ELAPSEDTIME(HOURS) 720 4367 74495 l
- SINCE DATE OF COMMERCIAL OPERATION 1-1-68 l
i L
= - -. - -
DOCKET t10.
50-213
Conn. Yankee 4
Ha m Neck UNIT SHUTOOWNS AND POWER REDUCTIONS DATE-7/6/76 COMPLETED BY C.A. Gil
,'.T
- TELEPHONE (203) 267-2556
REPORT M0flTH June, 1976 i
i Type Method of
- 4 F
- Forced Duration Shutting Down
?
l tio.
Date S: Scheduled (Hours)
Reason (1)
TheReactor(2)
Corrective Actions /Coments e i
4 I
o 123-6-7 76-05-19 S
1032 C
2 1976 Refueling and Maintenance Outage.
i fl0TE:
+
The follosing unit shutdown numbers:.J l.,
. I ig:
should be corrected as shown below:
., g fiUMBER CORRECT t
DATE '
GIVEll NUMBER 76-01-22 104-6-3 120-6-4 76-04-02 105-6-4 121-6-5
};
76-04-28 106-6-5 122-6-6 4
76-05-18 107-6-6 123-6-7 108-6-7 4
l.
(1) Reason I'
SUMMARY
The plant was shutdown the entire month (2) Method i
for Reactor Refueling and General A-Equipment Failure (Explain) 1-Manual B-Maint. or Test Naintenance.
2-Manual Scram.
J-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Other(Explain)
~ '
E-Operator Training and i
J License Examination.
F-Administrative G-Operational Error (Explain)
H-Other(Explain)
= _ _...
n___
y DOCKET NO.
50-213 1
Connecticut Yankee i'
UNIT lladdam fleck l
l i
~
DATE 7-7-76 COMPLETED BY C. A. Gil i
l AVERAGE DAILY UllIT POWER LEVEL M0imi June, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (ff,4e-ne t)
-1 0
17 0
i 2
0 18 0
3 0
19 0
4 0
2'O O
5 0
21 0
l
^
i 6
0 22 0
\\
f i
0 23' 0
8 0
24 0
9 0
25 0
l l
l 10 0
26 0
4 11 0
27 0
12 0
28 0
j
'13 0
29 0
4 14 0
30 0
15 0
31 i
16 0
L i
j l
1 i
s..
a g,
~
g 5-POWER COMPANY
'...o CONNECTICUT YANKEE AT O M IC ff ",
~[
H ADDAM NECK PLANT k'
nR #1. DOX 127C. EAST HAMPTON, CONN. 06424 s
July 7, 1976 f
CYli - 3336 i
Director, Office of Inspection and Enforcement l
U. S. Nuclear Regulatory Commission I
Washington, D. C.
20555 i
i i
I l
1
Dear Sir:
l In accordance with reporting requirements the Connecticut J
Yankee Haddam Neck Monthly Operating Data Report 76-6, covering operations for the period of June 1,1976 to June 30, 1976 is hereby forwarded.
?
d Very truly yours, W%
i R. H. Graves l
Plant Superintendent 1
RHG/CAG:ms
[
Enclosure
)
cc:
(1) Director, Region I Division of Insocction & Enforcement O. S. Nuclear Regulatory Commission 631 Park Avenue i
King of Prussia, Pa.
19406 j
(2) Director, Office of Management Information and Program j
Control
[
i U. S. Nuclear Regulatory Commission i
I Washington, D. C.
20555 j
1 i,
l l
s J-1
-