Monthly Operating Rept for Jul 1975
ML20137B509
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/31/1975
From: Hartley F, Morris M
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20137B401 List:
References
FOIA-85-723 CYH-3037, NUDOCS 8511260285
Download: ML20137B509 (5)


Text

_

1

)

i 7-..

=

3 s

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT HADDAM, CONNECTICUT'

. u i

i o -

i MONTHLY OPERATING DATA REPORT NO. 75-7 FOR THE MONTH OF JULY 1975 i

k 8511260205 851119 PDR FOIA RATHJE85-723 PDR d-.

.m.

p-g9?*-g-e-

---.r yg w

y 9-iyu

'-+---wy-y*

-9 4'

  • ,y--

gr,ry*g-+

+'aw y-w-ywmew-

-g

-+--e-eg+,w-'f

---y-way,--re--+--

i i

50-213 DOCKET l'0.

Connecticut Yankee UNIT Ifaddam Neck DATE 8-1-75 C0iPLETED BY M.S. Morris AVERAGE DAILY UNIT POUER LEVEL I40 NTH July 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY PONER LEVEL DAY (1Ule-net)

DAY

-(HWe-net) 1 83 17 548 128 18 545 2

3 329 19 542 4

544 20 540 5

189 21 539 6

~ 431 22 543 7

540 23 542 e

8 538 24 540 9

539 25 538 10 538 26 540

'~

11 536 27 542 12 537 28 541 13 535 29 545 14 185 30 544 1s 462 31 541 16 547 Average daily power levels in excess of 100% during this period are due to an NOTE:

increase in unit efficiency as a result of seasonal changes in condenser cooling water temperatures.

i 4

em jaw j

1 DOCKET NO.

50-213 Connecticut Yankee UNIT NAME Haddam fleck

+

UNIT SHUTDOWNS DATE '8-1-75 1

COMPLETED BY M. S. Morris REPORT M0flTH Julv 1975 Type Method of F-Forced Duration Shutting Down No.

Date S-Scheduled (Hours)

Reason (l)

The Reactor (2)

Corrective Actions /Coments

~116-5-15 7-1-75 S

5.64 B & C' N/A Continuation of Core V-VI Refueling and I

Maintenance Outage. Turbine overspeed trip adjustment after reaching therm-equilibrium conditions.

v i-

117-6-1 7-5-75 F

5.38 A

N/A Unit forced off line by broken oil pressure gage line on turbine.

118-6-2 7-14-75 F

2.55 A

N/A Unit forced off line by leaking auto stop oil line on turbine.

i i

I f

I I

i l

1 I

f j

j l

g t

i g

SUMMARY

The plant operated at full power except for those periods associated E

pment Failure (Expla n) 1-Ita al with the shutdowns on 7/1, 7/5 and 7/14.

B-Maint. or Test 2-Manual 4

1 C-Refueling Scram.

D-Regulatory Restriction 3-Auto-E-Operator Training and matic License Examination Scram F-Administrative G-Operational Error (Explain)

H-Other(Explain)

yngy CONA IICUT YANKEE - IIADDAM NECK DATE 8-1-75 COPFLETED BY M.S. Morris Telephone: 203/267-2556 00CKET NO.

50-213 OPERATING STATUS 1.

REPORTING PERIOD 0001,750701 THROUGH 2400,750731 HOURS IN REPORTING PERIOD:

744 2.

CURRENTLYAUTHORIZEDPOWERLEVEL(MWt): 1825 MAX. DEPEND. CAPACITY (PWe Net) 540_

3.

POWERLEVELTOWHICHRESTRICTED(IFANY): (PWe Net)

None 4.

REASONSFORRESTRICTIONS(IFANY): N/A THIS CUMULATIVE REPORTING PERIOD YR. TO DATE TO DATE 5.

NUMER OF HOURS THE REACTOR WAS CRITICAL..............

744 4059.17 56176.87 6.

REACTOR RESERVE SHUTDOWN HOURS......

0 41.54 581.84 7.

HOURS GENERATOR ON-LINE.........

730.43 3947.56 52849.72 8.

UNIT RESERVE SHUTDOWN HOURS.......

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)...

1207342 6932565 90247284

10. GROSSELECTRICALENERGYGENERATED(MWH).

374095 2239959 29562768

11. NETELECTRICALENERGYGENERATED(MWH)..

354898 2127670.5 28092609.9

12. REACTOR SERVICE FACTOR..........

100 79.79 84.53

13. REACTOR AVAILABILITY FACTOR.......

100 80.61 85.41

14. UNIT SERVICE FACTOR...........

98.18 77.60 79.53

15. UNIT AVAILABILITY FACTOR.........

98.18 77.60 79.53

16. UNITCAPACITYFACTOR(USINGMDC).....
  • 88.34 78.70 78.77
17. UNITCAPACITYFACTOR(USINGDESIGNMWe).

82.96 72.74 72.18

18. UNIT FORCED OUTAGE RATE.........

1.07 1.57 10.79

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH:) None D. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

21. ELAPSEDTIME(HOURS) 744 5087 66455 O SINCE DATE OF COP 9tERCIAL OPERATION 1-168

L' ' l '

=.*

CONNECTICUT YANKEE ATO MIC POWER COMPANY HADDAM NECK PLANT RR # 1. BOX 127E. EAST H AMPTON, CONN. o6424 August 4, 1975 CYH - 3037 Mr. Steven Chapman Office of Management & Program Control U. S. Nuclear Regulatory Comission Washington, D. C.

20555

Dear Mr. Chapman:

In accordance with reporting requirements the Connecticut Yankee Haddam Neck Monthly Operating Data Report 75-7, covering operations for the period of July 1,1975 to July 31, 1975 is hereby forwarded.

Very truly yours,

.W. Habtley Plant Superintendent FWH/MSM:ms Enclosure cc Director, Region I Division of Inspection & Enforcement