ML20137B333

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/85-51 & 50-457/85-49 on 851007-11 & 1028-1101.No Violations Noted
ML20137B333
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/20/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137B337 List:
References
NUDOCS 8511260244
Download: ML20137B333 (2)


See also: IR 05000456/1985051

Text

.

=J

}&

=,_ :..

NOV 2 01985

.-

,

. Docket 1No.' 50-456- -

Docket No. 50-457

~

Commonwealth' Edison Company

ATTN: Mr. Cordell Reed

. Vice President-

Post Office Box'767

Chicago',;IL 60690

Gentlemen:

-This. refers to the-routine safety inspection conducted by Messrs. P. Pelke,

.R. Lerch, and W. Kropp, and Ms. J. Malloy cf this office on October 7 through.

fil, and October 28 through November 1, 1985, of activities.at the Braidwood

Station, Units l'and 2, authorized by NRC Construction Permits No. CPPR-132

and No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace at

the conclusion of the inspection.

The enclosed copy of our inspection. report identifies areas-examined during

~

the' inspection. Within these areas, the inspection consisted of.a selective

-

examination of procedures and representative records, observations, and

interviews.with personnel.

. No violations of NRC requirements were identified during the course of this

' inspection. '

.In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosure (s) will be placed in the NRC's Public Document

' Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

William S. Little, Director

Braidwood Project

. Enclosures: Inspection Report

No. 50-456/85051(DRP);

No.'50-457/85049(DRP)

-See Attached Distribution

-

,

G

i I

.

+ .

NOV 2 0 S85

Commonwealth Edison Company -2

.l

Distribution-  !

= cc w/ enclosure:

D.' L. Farrar, Director

of: Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction-

- Superintendent

E. E. Fitzpatrick, Station Superintendent: '

C. W._ Schroeder, Licensing and

Compliance Superintendent-

DCS/RSB (RIDS) .

Licensing Fee Management Branch

Resident Inspector,.RIII

Braidwood

, Resident. Inspector, RIII Byron

Phyllis Dunton, Attorney

~ General's Office Environmental .

Control Division

D. .W. Cassel, Jr. , Esq.

J.~ W..McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J..Stevens, NRR-

~

i The Honorable Herbert Grossman, ASLB

The Honorable A.~ Dixon Callihan, ASLB-

-The Honorable Richard F. Cole, ASLB

-

B

1

m

@

Sg'l

li /mj Ea "fW "A

ber . Lerch

  1. h'k

Mall by ,

iT/ @ms

Weil

"'Y

l

Little

11/16/85 li g H.% FA o/<t/f

L