Text

_ _ _ _ _

OPERATIONS

SUMMARY

JULY, 1985 The plant was maintained in hot shutdown the entire month awaiting the U.S.

Court of Appeals for the Third Circuit's decision to lift the stay of the NRC Commissioners Restart Order. The decision to remain hot is re-evaluated on a continuing basis. All operating plant equipment continues to operate dependably with no signs of degradation.

Both OTSGs continue to exhibit no significant leakage.

Major Safety Related Maintenance During the month of July,1985, the following major maintenance items were performed:

Waste Disposal Liquid System Filter WDL-F-1B - Precoat filter WDL-F-1A filter element changeout, because of an excessively high D/P, was completed in July, 1985. The filter housing dome was renoved, filter elements were removed and inspected and found to be clogged. New elements were installed and the housing dome was reinstalled. The filter was tested satisfactorily. All work is complete.

Chemical Addition System Sampling Valve CA-V Repairs (valve was binding during its cycle) were completed in July,1985. The operator and the operator mounting plate were removed from the valve yoke assembly. The valve was disassembled and a new stem and disc assembly installed. A new operator mounting plate was fabricated and installed on the valve yoke. The valve operator was reinstalled and the valve was tested satisfactorily. A motor support was designed and installed.

Local leak rate testing was performed satisfactorily. All work is complete.

Make-up Pump MU-P-1A - Make-up pump MU-P-1A speed increaser lube system repairs (low lube oil pressure) were completed during the month. The lube system check valves were cleaned and inspected, the motor-driven and shaft-driven lube oil pumps were replaced, and tubing fittings were tightened. The lube oil system and pump were tested satisfactorily. The problem is suspected to have been a result of air binding caused by a loose fitting. All work is complete.

Weste Disposal Liquid Pumps WDL-P-13A/B - Reclaimed boric acid pump WDL-P-13A overhaul and modification (low discharge pressure) was completed during July, 1985. The pump was disassembled and overhauled and a 5-1/2" diameter impeller was installed. The pump was reassembled and tested satisfactorily. The disassembly of WDL-P-13B and its overhaul and modification is in progress.

1 Work will continue in August, 1985.

i i

~

. Screen Wash & Ventilation Pump SW-P-2A - Screen wash pump SW-P-2A repairs (tube nut found loose while trying to repack lower stuffing box) commenced during July, 1985. The pump was removed and disassembled and component inspection is in progress. Repairs are expected to complete in August,1985.

Nuclear Instrumentation (NI-1) - NI-1 (Source Range) began operating erratically.

Inspection work is in progress to determine and correct the problem. The problem is suspected to be in the preamp board.

Rx Building High Range Monitors (RM-G-22 & 23) - Cables were replaced to these two radiation monitors to ensure environmental qualification. This work will continue into August, 1985.

h p

s l

50-289 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME TMI-I DATE 7/31/R5 REPORT MONTH loly 14RE O

5El "i

E*

.! ?

3 hYk Licensee E

Cause & Corrective No.

Date g

3g 4

jg5 Event

~g Action to

$5 5

Ji a e Report #

mV Prevent Recurrence H

u e

6 Regulatory Restraint Order 1

85/31/07 F

744 D

1 N/A ZZ ZZZZZZ 1

2 3

4 F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Esent Report (LER) File (NUREG-D-Regulatory Restriction 4-Other ( Explain) 0161)

E-Operator Training & License Examination F Administrative 5

G-Operational Error (Explain)

Exhibit I-Same Source Il-Other (E xplain )

1 REFUELING INFORMATION REQUEST l

1.

Name of Facility:

Three Mile Island Nuclear Station, Unit 1 2.

Scheduled date for next refueling shutdown:

Unknown 3

Scheduled date for restart following refueling:

Unknown h.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, in general, what vill these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50 59)?

If no such review has taken place, when is it scheduled?

Amendment No. 50, Cycle 5 reload, was approved on 3-16-79 5

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new' operating procedures:

N/A T.

The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:

(a) 177 (b) 208 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The present licensed capacity is 752. There are no planned increases at this time.

9 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1991 is the last refueling discharge which allows full core off-load capacity (1T7 fuel assemblies).

m

OPERATING DATA RE:

2 DOCKET NO.

50-289 DATE 7/31/85 COMPLETED BY C.W. Smyth TELEPHONE (717) 948-8551 OPERATING STATUS NOTES

1. UNIT NAME:

THREE MILE ISLAND UNIT 1

2. REPORTING PERIOD:

JULY

,1985.

3. LICENSED THERMAL POWER (MWT) :

2535.

4. NAMEPLATE RATING (GROSS MWE) :

871.

5. DESIGN ELECTRICAL RATING (NET MWE) :

819.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

824.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

776.

8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMMULATIVE

11. HOURS IN REPORTING PERIOD 744.

5087.

95664.

12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 31731.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 838.5
14. HOURS GENERATOR ON-LINE 0.0 0.0 31180.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.

O.

76531071.

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.

O.

25484330.

18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.

O.

23840053.

19. UNIT SERVICE FACTOR 0.0 0.0 32.6
20. UNIT AVAILABILITY FACTOR 0.0 0.0 32.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 31.9
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 30.4
23. UNIT FORCED OUTAGE RATE 100.0 100.0 64.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
e..

AVERAGE DAILY UNIT POWER LEVEL s

DOCKET NO.

50-289 UNIT TMI-l DATE 7/31/85 COMPLETED BY~

C.W. Smyth TELEPHONE (717) 948-8551 MONTH:

JULY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 0.

17 0.

2 0.

18 0.

3 0.

19 0.

4 0.

20 0,

5-0.

21 0.

6 0.

22 0.

7 0.

23 0.

8 0.

24 0.

9 0.

25 0.

10 0.

26 0.

11 0.

27 0,

12 0.

28 0.

13-0.

29 0.

14 0.

30 0.

15 0.

31 0.

16 0.

.e GPU Nuclear Corporation Nuclear

,orrs::;48o Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

August 15, 1985 5211-85-2137 Office of Management Information and Program Control Attn:

W. C. Mcdonald c/o Distribution Services Branch DPC, ADM U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Mcdonald:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report July, 1985 Enclosed please find two (2) copies of the July, 1985 Monthly Operating Report for Three Mile Island Nuclear Station Unit-1.

Sincerely, H. D. Hukill Director, THI-1 HDH:JGB:spb Attachments cc:

V. Stello Dr. T. E. Murley 0015C GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation y$2.,h

'/t