Monthly Operating Rept for Oct 1985
ML20137A521
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/31/1985
From: Krieger K
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
Shared Package
ML20137A519 List:
References
NUDOCS 8511260018
Download: ML20137A521 (5)


Text

F l

OPERATING DATA REPORT 50-247 DOCKET NO.

DATE I l-5-85 COMPLETED BY

v. Kriecer TELEPHONE 914 526-5155 OPERATING STATUS Indian Point Unit #2 Notes
1. Unt h October 1985 The final shipment of
2. Reporting Perted:
3. Licensed Thennel Power (MWt): 2758 fuel for the next cycle 1013 Was received at the site l
4. Nuneplete Rating (Gross MWe):

on October 29, 1985.

873

(

5. Design Electrical Rating (Net MWe):

900

6. Maximum Dependable Capacity (Gross MWe):

864 l

7. Maximum Dependable Capacity (Net MWe):

l

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

Items 6 and 7 changed to winter ratings ef fective 0200 10/27/85 l

l Approximately 610 unti1 10/25/85

9. Power Level To Which Restricted. lf Any (Net MWe):
10. Reseens For Restrictions.lf Any:
  1. 21 main transformer out of service for repairs l

l This Month Yr..to.Dete Cumul'etin 74 5 7296 99385 II. Hours in lieporting Peded

12. Number Of Hours Reactor Was Critical 680.98 7067.36 67733.08 6I.83 152.67 3398.37
13. Reactor Reserw Shutdown Hours 672.88 6957.43 65707.81 1d. Hours Generator On.t.ine o

o o

15. Unit Reserw Shutdown How,
16. Gewas Thennel Energy Generated (MWH) 1516040 18325399 171029744
17. Geoes Electricol Energy Generated (MWH) 46M 10 5749880 53067496
18. Net Electrical Energy Generated (MWH) 443313 5526R87 50640744 90.3 99.4 66.1
19. Unit Service Feeter 90.3 95.4 66.1
20. Unit Availability Factor 69.9 88.6 59,3
21. Unit Capacity Factor IUning MDC Netl 68.2 86.a 5R.4
22. Unit Capacity Factet IUning DER Net)

D.6 3.7 o.1

23. Unit Forced Outage Rate
24. Shutdowns Sclwduled Our Nest 6 Montho (Type. Dele. sad Duret6en of Each n Cycle 7/8 Refueling and Maintenance Outage, scheduled for 1-15-86 and of a 60 day duration.

N/A l

23. If Shut thien At End Of Meport Period, Estimated Date of Startup:
26. Units In feet StatuilPrior to Commercial Operationt Foreceit Achieved INITIAL CMiilCALITY

\\

\\

IN;flAL Ell:C TMICity

\\

\\

COMMI: MCI AI. OFFM ATION l

OD11 E 0010 Q [,,pg 47 l'DH ADOCK (y/773 H

L d

SUMMARY

OF OPERATI?Ki EXPERIENCE OC'IOBER 1985 Unit No. 2 operated at approximately 76% reactor power and 640 Mwe through October 21 while No. 21 Main transformer was repaired.

While shutting down to return the transformer to service, the MS-1 valve on #22 steam generator would not close.

The plant was brought to cold shutdown and the valve was repaired.

On October 24, 1985 the reactor tritped shortly af ter synchronizing the main generator units.

The cause of the reactor trip was a high steam generator level in ateam generator ib. 23.

The unit was returned to nervice and was oterated at 100% lxuer for the rmainder of the month, i

1)y the end of the month, all circulating water purnpa had been placed in the low spaal operating mode in accordance with the terms of the cooling

[

tower settierient agreer:ent.

i I

l

AVERAGE DAILY UNIT POWER LEVEL 50-247 DOCKET NO.

I.P. #2

'lT DATE E"

COMPLETED BY TELEPHONE 914-526-5155 OCTOBER 1985 MNW DAY AVERAGE DAILY POWER LEVEL DAY-AVERAGE DAILY POWER LEVEL (MWe Net) iMWe. Net)

I 6 t /*

l7 610 606 608 2

0I3 606 3

gg 4

611 20 60'l l

5 610 21 487 600 o

6 73 l

0I2 7

23 0

g 614 24 0

0Il 743 9

3 10 612 842 26 11 27 n4l 611 339 12 g

13 611 843 29 613 843 y

30 1

612 839 g3 606 16 l

i INSTRUCTIONS On Ihli format.llit the average dady unit power loelin MWe Net for each day in the reporting month. Compute to the nearent whole megawatt, 19/77) i

50-247 DOCKETNO.

UNIT SHUTDOWNS AND FOWER REDUCTIONS UNIT NAME TP #2 DATE 11-5-85 OCTOBER 1985 000NLETED BY K. Krie ce r REFORT MONTH TELEPHONE 914-526-5155 "E

E

=3 5

E80ensee

.T, Cause & Corrective N-th*c i

3?

4 2s&

Even E'!

9-3 Adion to M

E j;gg Repust

Prevent Recurrence d

10 85-10-21 S

68.35 H

1 N/A EB Transf Scheduled outage to return #21 Main Transformer to service.85-014 11 85-10-24 F

3.77 6

3 CH HtExch F 23 Steam Generator High level -

l Training related operator error.

I s-I 2

3 4

F-Fossed Reason:

Method-Exhibit G. Instructions S SsheJaPed A Eqmpmens Faelare(Explain)

I-Manual for Preparatism of Dats 3-teeiheenance ciTest 2-Manual Scrasn.

Entry Sheets for Licensee C-Refselmg 3-Autoenatic Scram.

Event ReporI(LER) File (NUREG-DRetulatory Restrkssun 40ther (Explain) 0161)

EOperanos Trassing & Lacense Examenatam F-AJanastraine 5

GOrcrariumal Essue tEmplass)

Eshibis ! Sane Source reft 7)

IIOtheniEmplaal i

MAJOR SAFETY CORRECTIVE MAI!TTENANCE OC'IOHL21 1985 MWR NO.

SYSTEM LTEPONE!TP DATE WORK PERFORMED 23373

!!VAC 23 OtDM FAN 10-18-85 REPLACED PAN ID'IOR 23960 INAC 21 CRDl! FAN 10-29-85 REPLACED FAN MOIOR