,_
hlll November 19, 1985 Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL -60690 i
Gentlemen:
The NRC's Office for Analysis and Evaluation of Operational Data (AE00) has recently completed an assessment of 30 Byron 1 Licensee Event Reports (LERs) as part of the NRC's Systematic Appraisal of Licensee Perfomance (SALP). The LERs were found to be of acceptable quality based on the requirements of 10 CFR 50.73. The Byron LERs were determined to be of average quality when compared to other? facilities that have been evaluated using the same methodology.
Although some LERs were well prepared and individually received high scores, other LERs had low scores and this resulted _in an overall average score that
-AE0D considered mediocre.
We are providing a copy-of AE0D's assessment before we issue the SALP 5 report so that you might be ware of the findings and take action to improve the overall
-quality-of future LERs.
We request that you provide Region III with the. actions you intend to take to improve the overall quality of future LERs.
We appreciate your cooperation with us in this matter.
If you have any
- questions, please contact R. F. Warnick (790-5575).
Sincerely, OrfgInel signed by A. Bert Dayls ~ 7 James G. - Keppler Regional Administrator
Enclosure:
AE0D Assessment cc w/
Enclosure:
See Distribution gjl250320851119 f
o ADOCK 05000454
[O PDR i l RIII RIII RIII RIII RIII RIII i
fel-
/WVe RFid f
f Lerch/rl Forney Warnick Norelius Davis frKeppler 11//9/85
~ 11//1/85 11//f/85 11/ W 85 11/89/85 11// /85
l Commonwealth Edison Company November 19, 1985 Distribution:
D. L. Farrar, Director V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunton, Attorney General's Office, Environmental Control Division D. W. Cassel, Jr., Esq.
Diane Chavez, DAARE/ SAFE Steve ~ Lewis, ELD L. 01shan, NRR LPM H. S. Taylor, Quality Assurance Division 1