ML20136J202
| ML20136J202 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/26/1997 |
| From: | Krieger R SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9703200054 | |
| Download: ML20136J202 (2) | |
Text
.
m
_m 1
i SOUTHERN cAUFORNic R. W. Krieger Vice President I
EDISO,.
]
4 Nuclear Generation An ED150% IvTER.%ATIOML Company l
February 26, 1997 I
I I
i U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
)
Gentlemen:
Subject:
Docket No 10-206,50-361, and 50-362 10 CFR 50.54(p)(2) l Physical Security Plan, Revision 54 San Onofre Nuclear Generating Station, Units 1,2, and 3 In accordance with 10 CFR Q50.54(p), this letter submits Revision 54 to the U. S. Nuclear Regulatory Commission (NRC) approved August 1983, " Physical Security Plan, San Onofre l
Nuclear Generating Station, Units 1,2, and 3" as Enclosure 2. Enclosure 1 provides the Screening Criteria Forms (Assessment of Accentability of 10CFR Q50.54(p) Plan Changes). The changes, as described in Enclosures 1 and 2, du not reduce the effectiveness of the plan.
Four copies of Revison 54 textual changes are enclosed for review. Two copies are also I
fonvarded by this letter to the Regional Administrator, NRC, Region IV.
The enclosures contain " Safeguards Information" and must be protected in accordance with j
10 CFR Q73.21. If you have any questions regarding this information, please let me know.
Sincerely, f!
V4 bR DO 050 206 F
PDR SAFEGUARDS INFORMATION GN DECONTROLLED UPON REMOVAL OF ENCLOSURES P.D.g g q
Ilm 128
[
f San Clemente. CA 92674 g[
' b )s'
,N,Oh I
T 714 368 6183 P
L
l i
i l
Document Control Desk February 26, 1997 PSP Revision 54 l
Enclosures i
cc-L. J. Callan, Regional Administrator, NRC Region IV T. P. Gwynn, Director, Division of Reactor Safety, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 1,2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 E. W. McPeek, Security Specialist, NRC Headquarters, Washington, D. C.
i 1
SAFEGUARDS INFORMATION DECONTROLLED UPON REMOVAL OF ENCLOSURES
-. =
.