_.

.

.6

.

JAN 0719894

Docket No.

50-423

-Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

-Senior Vice President - Nuclear

Engineering and Operations Group

.P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection Report No. 50-423/85-57

This refers to the routine safety inspection conducted by Mr. Jim Prell of

-

,

this office on November. 12-27, 1985, at the Millstone Nuclear Power Station,

Unit 3, Waterford, Connecticut, of activities authorized by NRC License

No.- CPPR-113 and to the discussions of our findings held by.Mr. Jim Prell

with Mr. Jim Crockett of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report.which is enclosed with this letter. Within these areas, the

-inspection consisted of selective examinations of procedures and representative

records,' interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

'

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

_

er(, a/.gah6w

/, q Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure:

NRC Region I Inspection Report No. 50-423/85-57

<

OFFICIAL RECORD COPY

IR MILL 3 85-27 - 0001.0.0

lbg l

12/12/85

.

~

8601130259 860107

1

PDR

ADOCK 05000423

I

G

PDR

3

=-.

.-

..

. - . .

--

. - -

- . . - .

y-

.-.

t

'. d .

. Northeast Nuclear Energy Co.

2

cc Nencl:

V. Papadopoli, Construction Quality Assurance Supervisor

E..R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. .T. . Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document. Room (PDR)

,

-Local Public. Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

.NRC. Senior Resident Inspector

State of Connecticut

bec~w/ encl:

. Region.I Docket Room (with concurrences)

. Management Assistant, DRMA (w/o enc 1)

G. Walton, SRI, BV-2

T. Shedlosky, SRI, Millstone 1&2

- B.:Doolittle, LPM,'NRR

E.-McCabe, Chief, Section 3B

.

b

RI:DRS

R.

RI:DRS

1

JPrell/f1

P

LBettenhausen

12/ /85

&ib5

-

FZ/ A

- Q$h&

Ih/%

V5/W

hb' -

0FFICIAL RECORD COPY

IR MILL 3 85-27 - 0002.0.0'