Text
_..
Gecro a Power Company 313 Piedmont Avenue Attanta, Georgia 30308 Tekaphore 404 5?6 6526
' Ma:hng Address:
Post Off:co Dox 4'i45 Atlanta, Georgia 30302 M
Georgia Power L T. Gucwa IN Wf '"o CW l'C 5*5&'n Manager Nuctear Eng neering and Cinef Nuclear Erg reer SL-177 1994N Jantary 3, 1986 Director of N1 clear Reactor Regalation Attention: Mr. D. Miller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Riclear Recplatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. IIA'IGI NUCLEAR PLANT UNITS 1, 2 OU'ISTAWING SUBMI'ITAIS LIST.
Gentlemen Attached please find an updated listing of correspondence with MIR to which a written response is expected.
'Ibe attachment is tatulated chronologically by Georgia Power Conpany's (GPC) albmittal date.
GPC is ready to discuss modifications to this status report and will pronptly address any mestions you might have regarding these licensing isales.
GEC acknowledges and appreciates the recent NRC efforts to conplete licensing action on air albmittals related to the installation of fast acting danpers in containment pirge and vent lines and relief on 10 year inservice inspection remirements.
We respectfully remest your contirued efforts to expedite those priority items albmitted in mapport of the Unit 1 oatage, as noted in the attachment.
If you have further mestions, please contact this office at any time.
Very truly yaars, Wf Qw L. T. Q1 cwa K7Blackwood/lc Attachment c:
(w) :
Mr. J. T. Beckham, Jr.
((p$,
(w) :
Mr.11. C. Nix, Jr.
(w) :
Dr. J. N. Grace (MIC-Region II) p (w):
Senior Resident Inspector
(
1 P
4
'4 V
A
+W,au,g Page No.
2 01/03/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE 05/09/85 366 REQUEST FOR TECHNICAL SPECIFICATION RELIEF - OVERCURRENT PROTECTION FOR CONTAINMENT PENETRATIONS 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING l
06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 - SALEM EVENT SCRAM BREAKER FAILURE ~
06/25/85 321,366 INSERVICS TESTING - INSERVICE INSPECTION PROGRAMS UPDATE 07/19/85 321,366 O SCHEDULE FOR SUBMITTAL FOR PLAN OF ANTICIPATED TRANSIENTS WITHOUT SCRAM MODIFICATIONS FOR NON-SAFETY RELATED EQUIPMENT 07/24/85}321~
O CHANGE TO TECHNICAL SPECIFICATIONS - ANALOG TRIP TRANSMITTER SYSTEM 07/26/85'321 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - ADD SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND j?-
TRANSIENT LIMITS 08/01/85 321 C REQUEST FOR TECHNICAL SPECIFICATION RELIEF - 10 YEAR REQUIREMENTS INSERVICE INSPECTION 08/02/85 366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - HYDROGEN RECOMBINER HEATER INTEGRITY TEST SPECIFICATION 08/20/85 321,366 C PROPOSED SURVEILLANCE TECHNICAL SPECIFICATIONS FOR FAST ACTING DAMPERS FOR' PROTECTION OF SGTS - DOCR-85-15 08/20/85_321 O PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS FOR HIGH RADIATION ISOLATION OF PURGE AND VENT VALVES DOCR 85-20 08/22/85 321 O REQUEST FOR APPROVAL OF ANOTHER CYCLE WITH CORE SPRAY
/SPARGER CLAMP 08/23/85 321,366 O CHANGE TO TECHNICAL SPECIFICATIONS - DRYWELL PNEUMATIC ISOLATION VALVES - (DOCR 84-29R1; 85-21) 08/23/85 321 O PROPOSED CHANGES FOR TECHNICAL SPECIFICATION - ADS LOGIC -
DOCR 85-19 09/13/85 321,366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME' l
-e
-,.,e--
.c
.g Page No.
2 01/03/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE
._05/09/85 366 REQUEST FOR TECHNICAL SPECIFICATION RELIEF - OVERCURRENT PROTECTION FOR CONTAINMENT PENETRATIONS 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING
-06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 - SALEM EVENT
' SCRAM BREAKER FAILURE' 06/25/85 321,366 INSERVICE TESTING - INSERVICE INSPECTION PROGRAMS UPDATE 07/19/85 321,366 O SCHEDULE FOR SUBMITTAL FOR PLAN OF ANTICIPATED TRANSIENTS WITHOUT SCRAM MODIFICATIONS FOR NON-SAFETY RELATED~ EQUIPMENT 07/24/85 321 O CHANGE TO TECHNICAL SPECIFICATIONS - ANALOG TRIP TRANSMITTER SYSTEM 07/26/85 321 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - ADD
'l SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND j'
TRANSIENT. LIMITS 08/01/85 321
.C REQUEST FOR TECHNICAL SPECIFICATION RELIEF - 10 YEAR REQUIREMENTS INSERVICE INSPECTION 08/02/85 366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - HYDROGEN RECOMBINER HEATER INTEGRITY TEST SPECIFICATION 08/20/85 321,366 C PROPOSED SURVEILLANCE TECHNICAL SPECIFICATIONS FOR FAST ACTING DAMPERS FOR' PROTECTION OF SGTS - DOCR 85-15
,,g,
=..
~ < 08/20/85 321 0 PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS FOR HIGH RADIATION ISOLATION OP - PURGE' AND VENT VALVES
'DOCR 85-20 l
J08/22/85 321 O REQUEST FOR APPROVAL OF ANOTHER CYCLE WITH CORE SPRAY
- SPARGER CLAMP 08/23/85 321,366 O CHANGE TO TECHNICAL SPECIFICATIONS - DRYWELL PNEUMATIC ISOLATION VALVES - (DOCR 84-29R1, 85-21) 08/23/85 321 O PROPOSED CHANGES FOR TECHNICAL SPECIFICATION - ADS LOGIC -
DOCR 85-19 09/13/85 321,366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - SCRAM DISCEARGE VOLUME VENT AND DRAIN VALVE, CLOSURE TIME'
}
\\
i s4
.