LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST l
NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-101 4
Classification of 03/25/85 10/26/84 Emercencies EP-102 8
Unusual Event Response 03/28/85 10/26/84 EP-103 11 Alert Response 07/10/85 10/26/84 EP-104 10 Site Emercency Response 07/10/85 10/26/84 EP-105 10 General Emergency Response 07/10/85 10/26/84 EP-106 4
Written Summary 04/01/85 10/26/84 y
Notification i
EP-110 6
Personnel Assembly and 03/14/85 10/26/84 Accountability EP-120 3
Site Emergency Coordinator 04/01/85 10/26/84 EP-201 4
Technical Support Center 03/29/85 03/29/85 (TSC) Activation N/ EP-202 3
Operations Support Center 12/12/84 10/26/84 (OSC) Activation EP-203 5
Emergency Operations 04/01/85 04/01/85 Facility (EOF) Activation EP-208 4
Security Team 12/12/84 10/26/84 EP-210 3
Dose Assessment Team 12/12/84 10/26/84 EP-211 2
Field Survey Group 03/25/85 10/26/84 EP-220 CANCELLED EP-221 CANCELLED EP-222 CANCELLED EP-230 5
Chamistry Sampling and 03/14/85 10/26/84 Analysis Team
.m
. h __.
EP-231 9
Operation of Post-8 2
Accident Sampling Systems l
(PASS) 9m EP-232 CANCELLED hbM[
bur:l
. til0 ENLY MEN R8 1
8508200638 850BO7 p
PDR ADOCK 05000352 F
,PDR
Page 2 of 5 Revision 43 07/10/85 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-233 5
Retrieving and Changing 03/14/85 10/26/84 Sample Filters and Cartridges from the Containment Leak Detector During Emergencies l
EP-234 5
Obtaining Containment 03/14/85 10/26/84 Gas Samples from the Containment Leak Detector During Emergencies EP-235 5
Obtaining Reactor Water 03/14/85 10/26/84 i
Samples from Sample Sinks Following Accident Conditions EP-236 5
Obtaining Cooling Tower 03/14/85 10/26/84 Blowdown Line Water Samples Following Radioactive Liquid Release after Accident Conditions EP-237 7
Octaining the Iodine /
03/28/85 10/26/84 Particulate and/or Gas Samples from the North 4
Vent Wide Range Gas Monitor (WRGM)
EP-238 4
Octaining Liquid Radwaste 12/12/84 10/26/84 Samples from Radwaste Sample Sink Following Accident Conditions EP-240 CANCELLED EP-241 8
Sample Preparation and 03/14/85 10/26/84 Handling of Highly Radioactive Liquid Samples EP-242 5
Sample Preparation and 03/28/85 10/26/84 Handling of Highly Radioactive Particulate Filters and Iodine Cartridges EP-243 5
Sample Preparation and 12/12/84 10/26/84 Handling of Highly Radioactive Gas Samples EP-244 3
Of fsite Analysis-of 03/12/85 10/26/84 High Activity Samples 0
~, _ _
Page 3 of 5 Revision 43 07/10/85 i
LIMERICK GENERATING STATION I
EMERGENCY PLAN PROCEDURE INDEX
~~
PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-250 2
Personnel Safety Team 12/12/84 10/26/84 EP-251 2
Plant Survev Group 12/12/84 10/26/84 EP-252 6
Searcn and Rescue /First 04/22/85 04/01/85 Aid Group EP-253 0
Personnel Dosimetry, 12/12/84 12/12/84 Bioassay, and Respiratory Protection Group EP-254 3
Vehicle and Evacuee 02/04/85 10/26/84 Control Group EP-255 2
Vehicle Decontaminarion 12/12/84 10/26/84 EP-260 2
Fire and Damage 12/12/84 10/26/84 Control Team EP-261 2
Damace Repair Group 12/12/84 10/26/84 EP-272 4
Pniladelpnia Electric 02/04/85 10/26/84 Ccmpany Officials Phone List EP-273 5
Limerick Station 04/22/85 04/22/85 Supervision Call List EP-275 CANCELLED EP-276 6
Fire and Damage 04/22/85 04/22/85 Team Phone List i
EP-277 7
Personnel Safety 04/30/85 04/30/85 Team Phone List EP-278 5
Security Team Phone 03/25/85 10/26/84
]
List EP-279 6
Emergency Operations 06/27/85 10/26/84 Facility (EOF) Group I
Phone List EP-280 7
Tecnnical Support 06/27/85 10/26/84 Center Phone List-i j
EP-282 5
Government and 04/22/85 04/22/85 I
. Emergency Management Agencies Phone List EP-284 4
Company Consultants 01/22/85 10/26/84 and Contractors Phone List EP-287 3
Nearby Public and 02/11/65 10/26/84 Industrial Users of Downstream Water l
j
+
n
Page 4 of 5 Revision 43 07/10/85 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-291 6
Staffing Augmentation 04/18/85 10/26/84 EP-292 8
Chemistry Sampling and 04/22/85 04/22/85 Analysis Team Phone
'ist EP-294 6
bose Assessment Team 04/22/85 04/22/85 Phone List EP-301 1
Operating the Evacuation 12/12/84 10/26/84 Alarm and River Warning System EP-303 3
Local Evacuation 12/12/84 12/12/84 EP-304 3
Partial Plant Evacuation 12/12/84 10/26/84 EP-305 5
Site Evacuation 03/25/85 10/26/84 EP-306 2
Evacuation of the 04/18/85 10/26/84 Information Center EP-307 2
Reception and Orientation 12/12/84 10/26/84 of Support Personnel EP-312 4
Radioactive Liquid 04/18/85 10/26/84 Release EP-313 2
Distribution of Thyroid 12/12/84 10/26/84 Blocking Tablets EP-314 1
Emergency Radiation 03/29/85 12/06/84 Exposure Guidelines and Controls EP-315 5
Calculation of Offsite 04/01/85 10/26/84 Doses During a (Potential)
Radiological Emergency Using RMMS in the Manual Mode EP-316 3
Cumulative Population 04/01/85 10/26/84 and Near Real-Time Emergency Dose Calculations for Airborne Releases Manual Method EP-317 3
Determination of 03/25/85 10/26/84 i
Protective Action Recommendations EP-318 2
Liquid Release Dose 04/01/85 04/01/85 Calculations Method for Drinking Water n
Pago 5 of 5 Revision 43 07/10/85 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-319 2
Fish Ingestion Patnway 03/29/85 03/29/85 Dose Calculation EP-325 3
Use of Containment 02/27/85 10/26/84 e
Dose Rates to Estimate Release Source Term EP-330 4
Emergency Response 03/14/85 10/26/84 Facility Habitability EP-333 1
Adjustment of Wide 05/08/85 05/08/85 Range Gas Monitor Conversion Factors EP-401 2
Entry for Emergency 12/12/84 10/26/84 Repair and Operations EP-410 3
Recovery Phase 03/29/85 10/26/84 1
Implementation EP-500 2
Review and Revision 12/12/84 10/26/84 of Emeroency Plan
+
4 t
~
~
~ ~ - -
.p.
~. -
l EP-103, R0v. 11 PIgo 1 of 13 VA JLP/rgs Y *# * /JW 1
PHILADELPHIA ELECTRIC COMPANY D
LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE
.3850091960 EP-103 ALERT RESPONSE 1.0 PARTICIPANTS 1.1 Shift Superintendent or designated alternate shall assume the role of Emergency Director and implement this procedure, until relieved.
1.2 Station Superintenden't or designated alternate shall report to the Technical Support Center or Control Room, relieve the. Emergency Director, assume the role of Emergency Director and continue implementing this procedure, if necessary.
2.0 ACTIONS-IMMEDIATE 2.1 Emergency Director shall:
- ( s 2.1.1 Verify the Emergency Classification as determined in EP-101, Classification of Emergencies, unless determination has just been made.
2.1.2 Fill out Appendix EP-103-1 Alert Notification Message and give it to the communicator.
2.1.3 Direct the communicator to complete notification of the appropriate parties as specified in Appendix EP-103-3, Alert Phone List (Initial Notification) or Appendix EP-103-4, Alert Phone List (Escalation or De-escalation) within 15 minutes.
THE COMMUNICATOR SHALL MAN THE NRC RED TELEPHONE ON A CONTINUOUS BASIS UNTIL THE NRC DISCONNECTS.
IF THE COMMUNICATOR IS REQUIRED FOR URGENT PLANT OPERATIONS RELATED TO THE EMERGENCY, THE CONCURRENCE FCR SECURING THE PHONE SHOULD BE OBTAINED FROM THE NRC PRICR TO SECURING THIS 2.1.4 Contact the Station Sup e
Technical Advisor, info o
i COPY R.Y WH RED
\\
l'
~
EP-103, R;v. 11 Pigo 2 of 13 VAW/JLP/rgo i
-s 2.1.5 Direct the Information Center Staff,
- k /
to implement EP-306, Evacuation o0 The Inform & tion '
l i
Center.
Inform the Staff of the wind direction if there is an airborne release.
2.1.6 If there is a radiological release, implement EP-305, Site Evacuation.
2.1.7 If there has not been a radiological release, i
l A.
Evacuate all construction omfE5ngel by contacting Bechtel Safety g Direct them i
l to call for evacuation of aII~' Unit 2 personnel in accordance with Bechtel procedures.
Inform them of the nature of the hazard.
B.
ContactWehConstructionSecurity Off-Bour t and inform them that an acuation of Un1T 2 personnel is being imniemented, also i
inform Operations Security { j of the evacuation.
l THIS WILL CALL FOR THE ASSEMBLY OF UNIT 2 PERSONNEL AT THE UPPER PARKING LOT.
IF IT IS DESIRED THAT THEY LEAVE THE SITE, INFORM BECHTEL COMMAND POSTS AT THE UPPER PARKING LOT.
F\\-
C.
Select the type of accountability desired for personnel in the protected area and implement i
the required actions below:
1.
Emergency Assembly Without' Accountability
-Make the following announcement j.
"THIS (IS)(IS NOT) A DRILL.. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED l
EMERGENCY RESPONSE FACILITY OR ASSEMBLY AREA.
ALL OTHER PERSONNEL STAND BY FOR FURTHER ANNOUNCEMENT.
THIS (IS} (IS NOT)
A DRILL."
/
2.
Emergency Assembly With Accountability A.
Contact the Security y34m Leader.
j Inform 11m of the sel?ctcd.ev.ist point (s), that emergency assembAy with-accountability is going to be implemented, and to activate the Security Team (EP-208) and to
(
perforr personnel accountability in accordance with EP-llo, Personnel j
Assembly and Accountability.
j k
'l EP-103, Rsv. 11 Pcga 3 of 13 VAU/JLP/rgs B.
Cyn.ta,ct Yoh Const n Securit's off-hours k. and inforn.
them that personnel leaving Unit I will be reassembling at the Personnel Processing Center (PPC).
"THIS (IS)(IS NOT) A DRILL, THIS (IS)(IS NOT) A DRILL.
PLEASE PREPARE FOR ASSEMBLY WITH ACCOUNTABILITY.
DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITIES OR ASSEMBLY AREA.
ALL OTHER UNIT ONE PERSONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER.
THIS (IS) (IS NOT) A DRILL.
THIS (IS) (IS NOT) A DRILL."
2.1.8 For off-hours, direct the Shift Clerk to activate the call list using EP-291, Staffing Augmentation.
If Shift Clerk is not available, this function shall be assigned to any available individual.
2.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center (TSC) Activation.
2.1.10 If necessary, activate the Emergency Operations Facility in accordance with EP-203, Emergency Operations Facility (EOF) Activation.
2.1.11 Assign an Operations Support Center Coordinator (PO) to direct available personnel to report to the Operations Support Center on 269' Elev4 Turbine Bldg.
and to activate it in accordance t$g P-202, Operations Support Center (O vi on.
2.1.12 For samoles, direct the S f'
i y
echnician or Chemistry Sampling and, y a eam seacer to implement EP-230, 4 s yb ia ing and Analysis Team.
hs A
- det 2.1.13 For in-clangf9hr
,3 $i a Shift HP Technician or Tua(r.
Gea3er to implement EP-250, ted Personn Per
~
1 'f.
2.1.14 d' su'fu s, when a release of gaseous
~~ v rsmaterial has occurred or is suspected, d
Dose Assessment Team Leader to implement EP;q Dose Assessment Team.
.l EP-103,.Rev. 11 Pcg2 4 of 13 VAW/JLP/rgs 2.1.15 For a release at or greater than the Alert level in EP-101, Classification of Emergencies, direct the i
Dose Assesment Team Leader to implement EP-210, Dose Assessment Team.
2.1.16 On an interim bases, direct the Shift Technical Advisor to perform dose projections using EP-316, Cumulative Population and Near Real - Time Emergency Dose Calculations For Airborne Releases - Manual Method or EP-315 Calculation of Offsite Doses during a radiological Emergency using RMMS in the manual mode and to suggest Protective Action Recommendations per EP-317.
2.1.17 For fire / damage repair direct the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader to implement EP-260, Fire and Damage Team and/or EP-261, Damage Repair Group.
2.1.18 For a liquid release, implement EP-312 Radioactive Liquid Release, if required.
2.1.19 For Security matters, contact Security Shift Supervision and direct implementation of EP-208, Security Team unless previously done.
4 3.0 ACTIONS-FOLLOW-UP 3.1 Emergency Director shall:
3.1.1 verify that the Technical Support Center, the
- ~
Emergency Operations Facility (if necessary) and the Operations Support Center have been activated.
3.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies and maintain, escalate or de-escalate the.
I classification, as necessary.
3.1.3 If classification is de-escalated, fill out Appendix EP-103-2, Alert De-Escalation Notification Message and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in Appendix EP-103-4, Alert Phone List (Escalation or-De-escalation).
3.1.4 Obtain the following information as necessary to formulate further actions:
i
}
m 7..
~__,_-.--.,..-_...m.~..
,,.........._.__..__r-
' l.
EP-103,LRav. ll Pcgs 5 of 13 VAW/JLP/rgs i
i A.
Security status from Security Team Leader B.
Sample analysis from Shift chemistry Technician or Chemistry Sampling and Analysis Team Leader C.
In plant surveys from Shift EP Technician or Personnel Safety Team Leader D.
Field surveys from Dose Assessment Team Leader E.
Dose projections and protective action recommendations from Shift Technical Advisor or Dose Assessment Team Leader F.
Fire / damage repaar status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader G.
Notification results from Communicator 3.1.5 Determine which additional support personnel are necessary for emergency functions and direct the Shift Clerk or other assigned communicator in TSC to contact those personnel.
3.1.6 Provide site personnel with public address (PA) i announcements for any-major changes in plant emergency status, such as changing emergency action levels and evacuations.
r 3.1.7 Evaluate the need and order evacuation of effected 1
areas as necessary.
Refer to the following procedures:
EP-303 Local Evacuation, EP-304 Partial i
Plant Evacuation, EP-305 Site Evacuation.
3.2 The Communicator shall:
i I
3.2.1 Inform Emergency Director when appropriate Notifications have been made and submit completed-copy of Appendix EP-103-3 Alert Phone List (Initial Notification) or Appendix'EP-103-4 Alert Phone List (Escalaticn or De-Escalation) for Emergency Director's signature.
4.0
.PPENDICES A
i 4.1 EP-101-1 Alert Notification Message 4.2 EP-103-2 Alert De-Escalation Notification Message 4.3 EP-103-3 Alert Phone List (Initial Notification) 1 1
~.
.1.
=
.. r
'l EP-103,. Rov. 11 Pcg2 6 of 13 VAW/JLP/rgs 4.4 EP-103-4 Alert Phone List (Escalation or De-escalation) 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines for site response to an Alert.
5.2 Criteria For Use 5.2.1 This procedure shall be implemented when an event has been classified as an Alert per EP-101, Classification of Emergencies, and EP-101 has been completed.
5.3 Special Ecuipment None 5.4 References 5.4.1 Limerick Generating Station Emergency ~ Plan 5.4.2 NUREG 0654, Criteria for Preparation and Rev. 1 Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
5.4.3 EP-303 Local Evacuation 1
5.4.4 EP-101 Classification of Emergencies 5.4.5 EP-304 Partial Plant Evacuation 4
5.4.6 EP-305 Site Evacuation 5.4.7 EP-306 Evacuation of the Information Center l
5.4.8 EP-291 Staffing Augmentation 5.4.9 EP-201 Technical Support Center (TSC)'Activiation i
5.4.10 EP-202 Operations Support Center (OSC) Activation 5.4.11 EP-203 Emergency Operations Facility (EOF)
Activation 1
)
4
~
.' l EP-103,.R2v, 11 Pag 3 7 of 13 VAW/JLP/rgs 5.4.12 EP-317 Determination of Protective Action Recommendations 5.4.13 EP-316 Cumulative Population Dose Calculations for Airborne Releases-Manual Method 5.4.14 EP-110 Personnel Assembly and Accountability 5.4.,15 EP-208 Security Team 5.4.16 EP-210 Dose Assessment Team 5.4.17 EP-230 Chemistry Sampling and Analysis Team 5.4.18 EP-250 Personnel Safety Team
-5.4.19 EP-260 Fire and Damage Team 5.4.20 EP-261 Damage Repair Group 5.4.21 EP-312 Radioactive Liquid Release 5.4.22 EP-315 Calculations of offsite doses.
during a Radiological Emergency using RMMS in the' manual mode i
1 1
1 4
l
(
l I
EP-103, Rsv. 11 Page 8 of 13 VAW/JLP/rgs APPENDIX EP-103-1 ALERT NOTIFICATION ~ MESSAGE 2
1 MESSAGE:
This (is) (is not) a drill.
This (is) (is not) a drill.
This is Limerick Generating Station calling to report an Alert.
My name is telephone Limerick Generating Station is reporting an Alert declared at Unit No.
Time and date of Alert classification are The basic (24 hr. clock time)
(date) problem is There (has been) (has not been) an (airborne) (liquid) radioactive release from the plant.
The plant.
status is (stable)(improving)(degrading)(not known).
There is no protective action recommended.
This (is) (is not) a drill.
This (is)
(is not) a drill.
i 4
4 1
e
--e
==e.
--.====.-e.
...... +.
s a
j EP-103, R2v. 11 Page 9 of 13 VAW/JLP/rgs APPENDIX EP-103-2 i
ALERT DE-ESCALATION NOTIFICATION MESSAGE MESSAGE: *This (is) (is not)* a drill.
This *(is) (is not)* a drill.
This is Limerick Generating Station calling to report a change in
-t emergency classification.
The Alert has been *(de-escalated to an Unusual Event) (Terminated)*.
Time and date are (24 H: Clock Time)
(Date)
The plant status is *(stable) (improving)*.
My-name is This *(is) (is not)* a drill.'This *(is) (is not)* a drill.
i l
l EP-103, Itev. 11 Page 10 of 13-VAM/JLP/rg s i
t APPEllDIX EP-103-3 AI.ERT PilOtlE I.IST Time Initlated (IrlITIAL 110TIFICATIOt3)
CIPfl.E PIIOtlE ilUMBER USED J
Pe r sonne l / Agency To lle tiotified Phone t1 umber Time Person Responding $A M j
a.
Station Superintendent Ilome Nl Office
.q e
Brown phone,,
)
l Ilome I
office Ix t.,
i Ilome W.-
office
.efk 4
b.
I.oad Dicpatcher Office dM _,
]W~
l c.
Itontgomery county Office of Blue phone,_Ex/
j 1:me rooney Preparedness c
d.
Pennsylvania Emergency itanag emen t Agency 1
/
Wh ito - phone, -Ex t.'h.
(8pm-4pm) c.
}
\\,
ilFam-4 pm) ~~
l (8am-4pm)
'PEttA a f ter 4pm) i f.
Manaqer - PubQc Information llome 1
T Office Black Phone.
Pager f'
lj i
(af ter%: TOT dial phone number
- i which you are using) i
l EP-103, Rev. 11 Page 11 of 13 l
VAll/JLP/cg s '
APPEllDIX EP-103-3 AI.I'RT PilOtJE LIST I
Time Initiated (IllITIAL NOTIFICATIOti)
CIRCLE PilOllE nut 1BER USED j
i Pe r sonne l /Aqency To Be tiot if ied PMne'Numhe r s Time Person Responding 9
Director - Emergency llome
(
l Pr epa r ed ness ~
Of fice._
Black 71 Hine.
)
l llome i'
k
~
office
_. J h.s Red -Phone-(ENSk 4
Make this call last and remain on telephone until NRC disconnects k
_w (Person contacting !!RC must he E
I.icensed Opera tor) k Agencies to be contacted after in the above personnel / agencies have yW' heen notifed i.
Berks County Emergency Blue _ Phone. '
flanag emen t Agency w
j.
Chester County Emergency
, Blue. Phone, %
')
Services
(
k.
Operations Security
(~.
~
Completed By:
Time /Date Verified By:
EftERGENCY DIRECTOR
]
i,
u l
EP-103, Rev. 11 Page 12 of 13-VAW/JLP/rgs APPENDIX EP-103-4 AI.ERT PilONE LIST Time Initiated (ESCALATION OR DE-ESCALATION)
CIRCLE Pl!ONE NUMBER USED Pe r connel / Agency To Be Not i f ied Phone Number Time Person Responding I[
a.
Statlon Superintendent ilome
(
Office Ext. w __.
N Brown phone,,
),
Ilome
(
Office 4 Ilome s
i office h.
Load Dispatcher Office Black ~ Phone,,
i
~_
~
c.(
Wh i te _ phone,--
.aan-4pm only)
I Ext 0 ~
(8am-4pm only) l (8am-4pm only) or (PEMA after hours) j d.
tilte Operations Center Red Phone-(ENSk p
8 I
Dethesda, MD
(
A s
c*
Itake this call last and remain
/
on telephone until NRC disconnects
,3 (Person contacting NRC must be I.icensed Operator) l' i
l EP-103, Rev. ]1 Page 13 of 13' VAW/JLP/rgs APPENDIX EP-103-4 AI.I'HT PIIONE LIST Time Initiated (ESCALATION OR DE-ESCALATION)
CIHCLE PIIONE NUMBER USED Pe r sonnel / Agency To Be Notified Phone Number Time Person Responding Agencies to be contacted af ter the above personnel / agencies have been noti fed ohone, #
e.
tiontgomery County Office nina of Emergency Preparedness m
f.
Berks County Emergency Illue--phone _, _Nw n J
tlanaqment Agency
(
9 Chester County Emergency n1He. Phen
- Services c __.
Completed By:
Time /Date Verifled By:
EMERGEtK'Y DIRECTOR p
9 9
.J EP-104, R3v. 10 Page 1 of 15 AW/
P/rgs
//
ab>M' b
PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE 3850091970 i
i EP-104 SITE EMERGENCY RESPONSE 1.0 PARTICIPANTS 1.1 Shift Superintendent.or designated alternate shall assume the role of Emergency Director and implement this procedure, until relieved.
1.2 Station Superintendent or designated alternate shall report to the Technical Support Center or Control Room, relieve the Emergency Director, assume the role of Emergency Director, and continue implementing the procedure, if necessary.
1.3 Site Emergency Coordinator shall report to the Emergency Operation Facility and implement the appropriate section of this procedure, if necessary.
v.
2.0 ACTIONS-IMMEDIATE 2.1 Emergency Director shall:
2.1.1 Verify the emergency classification as determined in EP-101, Classification of Emergencies unless determination has just been made.
2.1.2 Fill out Appendix EP-104-1, Site Emergency Notification Message, and give it to the Communicator.
2.1.3 Direct the communicator to completc* notification of the appropriate parties as specified in Appendix EP-104-3, Site Emergency Phone List (Initial Notification) or Appendi c
st (Escalation or De-escala t
THE COMMUNICATOR SHALL NA h
CONTINUOUS BASIS UNTIL THE,NRC DgC'ONKT i
DDY1 VALD CNI.Y WlEN RED
\\
t
{
EP-104, R3v. 10 Pcg3 2 of 15 VAW/JLP/rgs 2.1.4 Contact the Station Superintendent and the Shift Technical Advisor, inform them of the situation, if not already done.
2.1.5 Direct the Information Center Staff g to implement EP-306, Evacuation of the Inf6r5ation Center, if not already done.
Inform the staff of the wind direction, if there is an airborne release.
2.1.6 If there is a radiological release, implement-EP-305, Site Evacuation.
2.1.7 If there has not been a radiological release,-
A.
Evacuate all conp&eugtion personnel by contacting Bechtel Safety Direct them to call for I
an evacuation of~all Unit 2 personnel in accordance with Bechtel procedures.
Inform them of nature of hazard.
W B.
Contact-4ch, Construction Security i off-hours,__
and inform them that an evacuation of s
Unit 2 Bechtel Construction personnel is being imo&egented.
Also inform operations security
,of the evacuation.
THIS WILL CALL FOR THE ASSEMBLY OF UNIT 2 PERSONNEL AT THE UPPER PARKING LOT IF T IS DESIRED THAT THEY LEAVE THE SITE, INFORM BECHTEL COMMAND POSTS AT THE UPPER PARKING LOT.
C.
Select the type of accountability desired for personnel in the protected area and implement the required actions below:
1.
Emergency Assembly Without Accountability
- Make the following announcement "TEIS (IS) (IS NOT) A DRILL.
DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED l
EMERGENCY RESPONSE FACILITY OR ASSEMBLY AREA.
ALL OTHER PERSONNEL STAND BY FOR FURTHER ANNOUNCEMENT.
THIS (IS) (IS-NOT) A DRILL."
2.
Emergency Assembly With Accountability a.
Contact the Security Team Leader..
Inform him of the selected point (s),
that emergency assembly with accountability is going to be
-- ~
,r
.l EP-104, Rsv. 10 l
Pago 3 of 15 VAW/JLP/rgs a
implemented,.and to activate the Security Team (EP-208) and to l
perform personnel accountability in accordance with EP-110, Personnel Assembly and Accountability b.
Contact Yoh Construetipn Security O ff-hours
. and inform trem that personnel leaving Unit 1 will be reassembling at the 9
Personnel Processing Center (PPC) t "TEIS-(IS) (IS NOT) A DRILL, THIS j
(IS) (IS NOT) A DRILL.
PLEASE PREPARE FOR ASSEMBLY WITH 4
ACCOUNTABILITY.
DESIGNATED l
EMERGENCY PERSONNEL REPORT TO
?
j OR ASSEMBLY AREA.
ALL OTHER UNIT ASSIGNED EMERGENCY RESPONSE FACILITY i
j g
ONE PERSONNEL LEAVE THE PROTECTED i
AREA IMMEDIATELY AND REASSEMBLE AT l
THE PERSONNEL PROCESSING CENTER.
j THIS (IS)
(IS NOT) A DRILL.
THIS (IS) (IS NOT) A DRILL.
i l
2.1.8 For off hours, if not already accomplished at the l
Alert stage, direct the Shift Clerk to activate the call list per EP-291, Staffing Augmentation.
If Shift Clerk is not available, this function may be assigned to any available individual.
i 1
2.1.9 Direct the activation of the Technical Support i
Center in accordance with EP-201, Technical i
Support Center (TSC) Activation, if not already activated.
i 2.1.10 Direct the activation of the Emergency Operations Facility in accordance with EP-203, Emergency i
Operations Facility (EOF) Activation, if not i
i already activated.
4 I
I i 2.1.11 If the EOF has not been activated earlier, during i
the Alert Response procedure, direct a
?
communicator to call EOF personnel (directing them E
to report to the EOF) using EP-279, EOF Group l
Phone List.
I 2.1.12 Assign an Operations Support Center. coordinator (PO) if not already done, to direct available personnel to report to the Operations Support Center and to activate it in accordance with EP-202, Operations Support Center (OSC) Activation.
2.1.13 For samples, direct the Shift Chemistry Technician or Casaistry Sampling And Analysis Team Leader to implement EP-230, Chemistry Sampling And Analysis Team.
f Jl EP-104,' Rov. 10 Page 4 of 15 VAW/JLP/rgs i
l 2.1.14 For in-plant surveys, direct a Shift HP Technician, or Personnel Safety Team Leader to implement EP-250, Personnel Safety Team.
2.1.15 For field surveys, when a release of gaseous radioactive material has occurred or is suspected, 1
direct a Shift HP Technician or Dose Assessment Team Leader to implement EP-210, Dose Assessment Team.
1 2.1.16 For a release, at or greater than the Alert level in EP-101, Classification of Emergencies, or at
}
the discretion cf the Emergency Director, direct the Dose Assessment Team Leader to implement EP-210, Dose Assessment Team.
l l
I 2.1.17 On an interim basis, direct the Shift Technical Advisor to perform dose projections using EP-316,
)
Cumulative Population Dose Calculations for Airborne Releases-Manual Method or EP-315 i, -
Calculations of Offsite Doses during a l
Radiological Emergency using RMMS in the Manual i
Mode and to suggest Protection Action l
Recommendations per EP-317.
i i
{
2.1.18 For fire / damage recair direct the Maintenance l
Shift Assistant Foreman or Fire and Damage Team l
Leader to implement EP-260, Fire and Damage Team l
and/or EP-261, Damage Repair Group.
4 2.1.19 For a liquid release, implement EP-312,
{
Radioactive Liquid Release, if required.
i 1
1 2.1.20 For Security matters, contact Security Shift j
Supervision and direct implementation of EP-208, j
Security Team, unless previously done.
t 3.0 ACTIONS-FOLLOW-UP i
3.1 Emergency Director shall:
i 3.1.1 Verify that the Technical Support Center, L
Emergency Operations Facility and the Operations Support Center have been activated.
l 3.1.2 Periodically evaluate the event classification in accordance with EP-101,-Classification of i
i Emergencies and escalate or de-escalate the
{
classification, as necessary.
1 1
l 1
- 7...-
~... -
, -., ~ -.. - -., -
s.
l EP-104, Rov.~10 Pcgo 5 of 15 VAW/JLP/rgs 3.1.3 If classification is de-escalated, fill out Appendix EP-104-2, Site Emergency De-Escalation Notification Message and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in Appendix EP-104-4, Site Emergency Phone List (Escalation or De-escalation).
3.1.4 Obtain the following information as necessary to formulate further actions:
A.
Security Status from Security Team Leader B.
Sample analysis from Shift Chemistry Technician or Chemistry Sampling And Analysis Team Leader C.
In-plant surveys from Shift EP Technician or Personnel Safety Team Leader D.
Field surveys from Shift EP Technician or Dose Assessment Team Leader E.
Dose projections and protective action recommendations from Shift Technical Advisor or Dose Assessment Team Leader F.
Fire / Damage repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader.
G.
Notification Results from Communicator.
3.1.5 Discuss protective action recommendations with the Site Emergency Coordinator.
3.1.6 Determine which additional support personnel are necessary for emergency functions and direct the shift clerk or other assigned communicator to contact those personnel.
3.1.7 Provide site personnel with public addres (PA)-
announcements for any major changes in plant emergency status, such as changing emergency-action levels and evacuations.
3.1.8 Evaluate the need and order evacuation of affected areas as necessary.
Refer to the following-procedures:
EP-303 Local Evacuation I
4 9
. l EP-104,'Rcv."10 Page 6 of 15 VAW/JLP/rgs EP-304 Partial Plant Evacuation EP-305 Site Evacuation 3.1.9 Perform the following until relieved by the Site Emergency coordinator:
A.
Discuss protective action recommendations with the Dose Assessment Team Leader.
B.
Provide protective ection recommendations, if necessary, to the Pennsylvania Bureau of Radiation Protection.
C.
Inform the various emergency response groups if the recovery phase organization is to be implemented.
3.2 The Communicator shall:
3.2.1 Inform the Emergency Director when appropriate notifications have been made and submit completed copy of Appendix EP-104-3 Site Emergency Phone List (Initial Notification) or Appendix EP-104-4, Site Emergency Phone List (Escalation or De-escalation) for Emergency Directors Signature.
4.0 APPENDICES 4.1 EP-104-1 Site Emergency Notification Message 4.2 EP-104-2 Site Emergency De-Escalation Notification Message 4.3 EP-104-3 Site Emergency Phone List (Initial Notification) 4.4 EP-104-4 Site Emergency Phone List (Escalation or De-escalation) 5.0 SUPPORTING INFORMATION 1
5.1 Purpose The purpose of this procedure is to provide guidelines for the site response to a Site Emergency.
j
. l EP-104,'Rsv."10 Pag 2 7 of 15 VAW/JLP/ gs 5.2 Criteria For Use 5.2.1 This procedure shall be implemented when an event has been classified as a Site Emergency per EP-101, Classification of Emergency and EP-101 has been completed.
t 5.3 Special Equipment None 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 NUREG 0654, Criteria For Preparation and Rev. 1 Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
5.4.3 EP-101 Classification of Emergencies
,5.4.4 EP-291 Staffing Augmentation 5.4.5 EP-201 Technical Support Center (TSC) Activation 5.4.6 EP-202 Operations Support Center (OSC) Activation 5.4.7 EP-203 Emergency Operations Facility (EOF)
' Activation 5.4.8 EP-317 Determination of Protective Action Recommendations 5.4.9 EP-316 Cumulative Population Dose Calculations For Airborne Releases-Manual Method 5.4.10 EP-303 Local Evacuation
' 5.4.11 EP-304 Partial Plant Evacuation 5.4.12 EP-305 Site Evacuation 5.4.13 EP-306 Evacuation of the Information Center 5.4.14 EP-110 Personnel Assembly and Accountability i
5.4.15 EP-208 Security Team 5.4.16 EP-210 Dose Assessment Team 5.4.17 EP-230 Chemistry Sampling'and Analysis Team O
l EP-104,'Rev.'10 Pegs 8 of 15 VAW/JLP/rgs 5.4.18 EP-250 Personnel Safety Team 5.4.19 EP-260 Fire and Damage Team 5.4.20 EP-261 Damage Repair Group 5.4.21 EP-312 Radioactive Liquid Release 5.4.22 EP-279 Emergency Operations Facility (EOF) Group Phone List 5.4.23 EP-315 Calculations of Offsite Doses During a Radiological Emergency using RMMS in the Manual Mode
[
a l
i i
i 4
7
_~
1 EP-104, Rav.'10 Page 9 of 15 VAW/JLP/rgs APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION MESSAGE i
Messace:
This *(is)(is not) a drill.
This (is)(is not)* a drill.
This is Limerick Generating Station calling to report a Site Emergency.
My name is
, telephone Limerick Generating Station is reporting a Site Emergency declared at Unit No.
Time and date of Site Emergency classification are (24 hr. clock time)
(Date)
The basic problem is There *(has been) (has not been)* an *(airborne) (liquid)* radioactive
+
release from the plant.
The plant status is *(stable) (improving)
(degrading) (not known).*
There is no protective action recommended.
This *(is) (is not)* a drill. This *(is) (is not)* a drill.
L Y M M &D6MO
@*4ys ep
'r ese 4
-Se-e==
p p
6 g g me, m 6 g,
e ev.
pg O
h
l EP-104, Rsv. 10 Page 10 of 15 VAW/JLP/rgs l
APPENDIX EP-104-2 SITE EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE MESSAGE:-
This *(is) (is not)* a drill.
This *(is) (is not)* a drill.
This is Limerick Generating Station calling to report a i
change in emergency action level..The site emergency has been *(de-escalated to an) (Unusual Event) (Alert) (Terminated).*
Time and date are The plant status is *(stable)
(24 H: Clock Time)
(Date)
(improving).* My name is This *(is) (is nor)* a drill.
This *(is) (is not)* a drill.
O e
-M u
g 6
p gh a.Whh
- P
_Me ew-ee r
&4 6@@@e
$8D9 e
t I
l EP-It.
E3v. 10 Page 11 of 15 VA11/Jf.P/rgs APPEllDIX EP-104-3 SITE E!!ERGENCY PIIONE LIST (INITIAL NOTIFICATION)
Time Initiated Circle Phone Number Used Personnel / Agency to be notified Phone Number Time Pernon Responding Station _gup'erintendent ilome-a.
Offic (
Brown phone (
/
IlomeQ l
Office lione Q Offic(
j b.
Ioad Dispatcher Office Black p Dn'e I
c.
Montgomery County Office of Blue _ phone
~
[
d.
Pennsylvania Emergency Management Agency
'h White Ehone.
>(8am-4pm) e.
J-(Ham-4pm)
(8am-4pm)
.( PE!!?L a f ter 4pm) f.
Manager, _Public Information Ilome k
"^
Office
)
Black phona Pagets (After tone, dial phone number which you are using)
..e f
\\
' EP-10.e, Rev. 10 Page 12 of.lS*-
VAN /JI.P/rgs APPENDIX EP-104-3 (CONT'D)
SITE Et1ERGENCY PilONE LIST (CONT'D)
(INITIAL NOTIFICATION)
Circle Phone Number Uced Personnel / Agency to be notified' Phone Number Time Person Renponding g.
Director - Emergency Home (
Prenaredness Office Dlack phone, e
Ilome g Office Ext h.
~
R,gd-phone-Make this call last and remain on telephone until NRC disconnects (Person contacting NRC must be licensed operator)
Agencies to be contacted after
\\
the above personnel / agencies g
have been notified f
N 1.
Derks County Emergency Qlue-phone-
-Management Agency 4
1
t l
EP-10., Hev. 10 Page 13 of 15' VAW/.1LP/rgs APPENDIX EP-104-3 (CONT' D)
SITE EFIERGENCY PHONE LIST (CONT'D)
(INITIAL NOTIFICATION)
Circle Phone Number Used Personnel / Agency to be notified Phone Number Time Person Responding i
i
.# ]
~
j.
Chester County Emergency
. Blue-phone.
Services
(
p k.
Operations Security V
3 i
- )
Completed By:
(
fa/Date l
Verified By:
\\
Emergency Director
\\
\\
e
+
s e
s,.
s
l EP-10.., Rev. 10 Page 14 o f 15.*
VAH/JLP/rgs APPENDIX EP-104-4 SITE Et1ERGENCY PilONE LIST i
(ESCALATION OR DE-ESCALATION)
Time Initiated Circle Phone Number Used Personnel / Agency to be notified Phone Number Time Person Responding
.A a.
Station.. Superintendent Ilome i c
Of f ic' ('Ef tg__
e
(
Brown phone, d
Ilome (
i Office i
j Ilome s Office t
b.
Load Dispatcher Office Black phoneq,
c.
Wtilte phone,(ext
_ _)
g
\\
',/
)(PEMA af ter hours) d.
Red phone --
f r15ke this call last and remain on telephone until i
NRC disconnects
(;i %: r +
(Person contacting NRC must be licensed operator)
+
l EP-104, Re v~.
10 Pago 15 of 15, VAU/J f.P/rgs APPENDIX EP-104-4 (CONT'D)
SITE EMERGENCY PilONE LIST (CONT'D)
(ESCALATION OR DE-ESCALATION)
Circle Phone Number Used Personnel / Agency to be notified Phone' Number Time Person Responding Agencies to be contacted af ter the above personnel / agencies have been notified e.
Montgomery County Office of Bine phone ^
Berks County Emergency Blue -phone.
Management Agency s,
g.
Chester. County Epergency Blue phont, Services
._s Completed By:
Time /Date Verified By:
Emergency Director I
a t-a
l' EP-105, R;v. 10 Page 1 of 14 VAW LP/kml PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE 3850091980 EP-105 GENERAL EMERGENCY RESPONSE 1.0 PARTICIPANTS 1.1 Shift Sacerintendent or designated alternate shall assume the role of Emergency Director and implement this procedure until relieved.
1.2 Station Suoerintendent or designated alternate shall report to the Technical Support Center or Control Room, relieve the Emergency Director, assume the role of Emergency Director, and continue implementing the procedure, if necessary.
1.3 Site Emergency Coordinator shall report to the Emergency Operations Facility and perform the appropriate section of this procedure, if necessary.
2.0 ACTIONS - IMMEDIATE 2.1 Emergency Director shall:
2.1.1 Verify the emergency classification as determined in EP-101, Classification of Emergencies unless determination has just been made.
2.1.2 Fill out Appendix EP-105-1, Gene'ral Emer y
Notification Messa h
communicator.
2.1.3 Direct communicator ete notification of the appropriate parties as EEnd in Appendix EP-105-3, General Emergene enevL4%t (Initial Notification) or Appendix 4,b. General Emergency Phone List (Esca tion or De-escalation) withing)[
u j
THECOMMUNICATORSBbfiAN
'RI NR RED TELEPHONE
' NTIngIOggI UNTIL THE NRC DISCONNECTS.
k
}
EP-105, R3v. 10 Itge 2 of 14 VAW/JLP/kml 2.1.4 Contact the Station Superintendent and the Shift-Technical Advisor, inform them of the situation, if not'already done.
2.1.5 Direct the Info Center Staff
~
to implement EP-306, Evacuation oI~the 1nrormation Center, if not already done.
Inform the staff of the wind direction, if there is an airborne release.
2.1.6 If there is a radiological release, implement EP-305, Site Evacuation.
2.1.7 If there has not been a radiological release, A.
Fvacuate all construction nel by contacting Bechtel Safet Direct i
them to call for evacuation o all Unit 2 l
personnel in accordance with Bechtel procedures.
Inform them of nature and preferred evacuation direction.
m B.
Contact Yoh struction Security.
Off-Hoursy,,
and inform them that a
~
evacuation or Unit 2 personnel is being implemente Security s v% 1so contact Operations and tell them of the construction evacuation.
l THIS WILL CALL FOR THE ASSEMBLY OF UNIT 2 PERSONNEL AT-THE UPPER PARKING LOT.
IF IT IS DESIRED THAT THEY LEAVE THE SITE, INFORM BECHTEL COMMAND POSTS AT THE UPPER PARKING LOT.
C.
Select the type of accountability desired for personnel in the protected area and implement the required actions below:
1.
Emergency Assembly Without Accountability
~
- Make the following announcement "THIS'(IS) (IS NOT) A DRILL.
DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED l
EMERGENCY RESPONSE FACILITY OR ASSEMBLY AREA.
ALL OTHER PERSONNEL STAND BY FOR FURTHER ANNOUNCEMENT.
THIS (IS} (IS NOT) A DRILL."
k
1 1
EP-105, RGv. 10 Pago 3 of 14 VAW/JLP/km1 2.
Emergency Assembly With Accountability a.
Contact the Security Team Leader.
Inform him of the selected exit point (s), that emergency assembly with accountability is going to be implemented, and to activate the Security Team (EP-208) and to perform personnel accountability in
.accordance with EP-110, Personnel Assembly'and Accountability.
b.
Co t Yoh Constrna.Qon Security
(,
_. OFF-hour and inform j
W that personn 1 leaving Unit 1 will be-reassembling at the Personnel Processing Center (PPC).
"THIS (IS) (IS NOT) A DRILL, THIS l
(IS) (IS NOT) A DRILL.
PLEASE l
PREPARE FOR ASSEMBLY WITH l
ACCOUNTABILITY.
DESIGNATED EMERGENCY PERSONNEL REPORT TO l
ASSIGNED EMERGENCY RESPONSE FACILITY OR ASSEMBLY AREA.
ALL OTHER UNIT ONE PERSONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT TEE PERSONNEL PROCESSING CENTER.
~
THIS (IS) (IS NOT) A DRILL.
THIS-(IS) (IS NOT) A DRILL."
2.1.8 For OFF-hours, if not already accomplished during an Alert or' Site Emergency Response procedure, direct the Shift Clerk to activate the recall list using EP-291, Staffing Augmentation.
If Shift Clerk is not available, this function may be assigned to any available individual.
2.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center (TSC) Activation, if not already activated.
2.1.10 Direct activation of the Emergency Operations Facility in accordance'with EP-203, Emergency Operations Facilityf(EOF) Activation, if not already activated.
r
'4k 3
2 l'
EP-105, RGv. 10 Page 4 of 14 VAW/JLP/kml m
2.1.11
.If~the EOF has not been activated earlier, during an Alert or Site Emergency Response procedure, direct a communicator to call EOF personnel (directing them to report to the EOF) using EP-279, EOF Group Phone List.
2.1.12 Assign an Operations Support Center Coordinator (PO), if not already done, to direct available personnel to report to the Operations Support Center and to activate it in accordance with EP-202, Operations Support Center (OSC) Activation.
i 2.1.13 For samples, direct the Shift Chemistry i
Technician or Chemistry Sampling'And Analysis Team Leader to implement EP-230 Chemistry i
Sampling And Analysis Team.
]
2.1.14 For in-plant surveys, direct a Shift EP l
Technician or Personnel Safety Team Leader to implement EP-250, Personne1' Safety Team.
l 2.1.15 For field surveys when a release of gaseous radioactive material has occurred or is suspected, direct Dose Assessment' Team Leader to l
implement EP-210, Dose Assessment Team.
i 2.1.16 For a release at or greater than the Alert level in EP-101, Classification of Emergencies, or at the discretion of the Emergency Director, direct i
the Dose Assessment Team Leader to implement EP-210, Dose Assessment Team.
4 i
(
2.1.17 On an interim bases, direct the Shift Technical
}
Advisor to perform dose projections using EP-316, Cumulative Population Dcse Calculations for Airborne Releases-Manual Method or.EP-315 i
j Calculation of Offsite-Doses during a Radiological Emergency using RMMS in the Manual Mode'and to suggest Protective Action
' Recommendations per EP-317.
j 2.1.18 For fire / damage repair direct the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader to impleme.nt EP-260, Fire and Damage Team 4
l and/or EP-261 Damage Repair Group.
2.1.19 For a liquid release, implement EP-312, l
Radioactive Liquid Release, if. required.
l~
2.1.20 For Security matters, contact Security Shift l
Supervision and direct implementation.of EP-208, Security Team, unless previously done.
2 i
l n
}
1 EP-105, R3v. 10 Page 5 of 14 i
VAW/JLP/kml f.
3.0 ACTIONS - FOLLOW-UP 3.1 Emergency Director shall:
[
3.1.1 Verify that the Technical Support Center, Emergency Operations Facility and the Operations Support Center have been activated.
h 3.1.2 Periodically evaluate the event classification j
in accordance with EP-101, Classification of Emergencies.
If the conditions change, i
doescalate to an appropriate classification.
3.1.3 If classification is de-escalated, fill out Appendix EP-105-2, General Emergency De-r i
escalation Notification Message, and give it to the communicator and-direct the communicator to perform notification of the appropriate parties t
listed in Appendix.EP-105-4, General Emergency j
Phone List (Escalation'or De-escalation).
1 3.1.4 Obtain the following information as necessary to i
formulate further actions:
4 A.
Security Status from Security Team Leader
)
B.
Sample analysis from Shift chemistry i
Technician or Chemistry Sampling and Analysis Team Leader 4
I C.
In plant surveys from Shift HP Technician or j
Personnel Safety Team Leader D.
Field surveys from Shift EP Technician or Dose Assessment Team Leader J
E.
Dose projections and protective action i
recommendations from Shift Technical Advisor l
or Dose Assessment Team Leader F.
Fire / Damage Repair status from the Maintenance Shift Assistant Foreman or Fire j
and Damage Team Leader G.
Notification results from Communicator i
j 3.1.5 Discuss protective action recommendations with the Site Emergency Coordinator.
3.1.6
.If not already performed, determine which i
additional support personnel are necessary for emergency functions and direct the Shift Clerk 1
1
(
f
3 I
EP-105, Rov. 10 Page 6 of 14 4
VAW/JLP/kml 1
l f
or other assigned person to contact those personnel.
7 3.1.7 Provide site personnel with public address (PA) speaker announcements for any major changes in plant emergency status, such as changing emergency action levels.
3.1.8 Evaluate the need and order evacuation of effected areas as necessary.
f Refer to the following procedures:
EP-303 Local Evacuation EP-305 Site Evacuation i
EP 306 Evacuation of the Information Center 3.1.9 Perform the following until relieved by the Site Emergency Coordinator:
A.
Discuss protective action recommendations with the Dose Assessment Team Leader.
3 i
B.
Provide protective action recommendations to the Pennsylvania Bureau of Radiation Protection.
1 1
C.
Inform the various emergency response groups if the recovery phase organiza!f.on is to be j
implemented.
1 l
3.2 Communicator shall:
i l
3.2.1 Inform the Emergency Director when appropriate notifications have been made and submit completed copy of Appendix EP-105-4 General Emergency Phone List (Initial Notification) or i
Appendix EP-105-5 (Escalation or De-escalation) j for Emergency Director's signature.
l 4.0 APPENDICES l
4.1 EP-105-1 General Emergency Notification Message 4
4.2 EP-105-2 General Emergency De-escalation j
Notification Message 4
i i
i
_ m.
-m
.,,.._._r
i EP-105, Rcv. 10 Page 7 of 14 VAW/JLP/kml 4.3 EP-105-3 General Emergency Phone List (Initial Notification) 4.4 EP-105-4 General Emergency Phone List (Escalation or De-escalation) 5.0 SUPPORTING INFORMATION 5.1 The purpose of this procedure is to provide guidelines for the site response to a General Emergency.
l 5.2 Criteria for Use l
5.2.1 This procedure shall be implemented when an event has been classified as a General Emergency per EP-101, Classification of Emergencies, and EP-101 has been completed.
5.3 Special Equipment None 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 NUREG 0654, Criteria for Preparation and
~
Evaluation of Radiological Emergency Response Plans in Support of Nuclear Power Plants t
5.4.3 EP-101 Classification of Emergencies 5.4.4 EP-201 Technical Support Center (TSC) Activation 5.4.5 EP-202 Operations Support Center (OSC)
Activation 5.4.6 EP-203 Emergency Operations Facility (EOF)
Activation j
5.4.7 EP-291 Staffing Augmentation 5.4.8 EP-303 Local Evacuation
)
5.4.9 EP-304 Partial Plant Evacuation j
5.4.10 EP-305 Site Evacuation 5.4.11 EP-306 Evacuation of the Information Center
_7..._..
l EP-105, RGv. 10 Paga 8 of 14 VAW/JLP/kml 5.4.12 EP-317 Determination of Protective Action Recommendations 5.4.13 EP-316 Cumulative Population Dose Calculations For Airborne Releases - Manual Method 5.4.14 EP-110 Personnel Assembly and Accountability
]
5.4.15 EP-208 Security Team 5.4.16 EP-210 Dose Assessment Team 5.4.17 EP-230 Chemistry Sampling and Analysis Team 5.4.18 EP-250 Personnel Safety Team 4
5.4.19 EP-260 Fire and Damage Team 5.4.20 EP-261 Damage Repair Group 5.4.21 EP-312 Radioactive Liquid Release 4
5.4.22 EP-279 Emergency Operations Facility (EOF) Group Phone List i
5.4.23 EP-315 Calculations of Offsite Doses during a Radiological Emergency using RMMS in the Manual i
Mode.
i i
l 8
t
. +. --
=
l EP-105 Rsv. 10 Page 9 of 14 VAW/JLP/mla t
APPENDIX EP-105-1 l
GENERAL EMERGENCY NOTIFICATION MESSAGE 1
i MESSAGE:
This (IS) (IS NOT) a drill.
This (IS) (IS NOT) a drill.
This is the Limerick Generating Station calling to report a General Emergency.
My name is telephone a
Limerick Generating Station is reporting a General
't Emergency declared at Unit No.
Time and date of General i
Emergency classification are 3
l t
j 4
f (24 Er Clock Time)
(Date) 1 The basic problem is l
There (HAS BEEN) (EAS NOT BEEN) an (AIRBORNE) (LIQUID) radioactive release from the plant.
The plant status is (STABLE) (IMPROVING) i.
j (DEGRADING) (NOT KNOWN).
The protective action recommended is i
The affected area is This (IS) (IS NOT) a drill.
This (IS) (IS NOT) a drill.
i i
l
- IF A GENERAL EMERGENCY HAS BEEN DECLARED WITHOUT PRIOR EMERGENCY l
CLASSIFICATION, PROVIDE THE RECOMMENDATION TO SHELTER WITHIN THE 2 i
MILE RADIUS AND 5 MILES DOWNWIND OF THE PLANT.
IF PEMA & BRP ARE NOT AVAILABLE, MAKE THE RECOMMENDATION DIRECTLY TO THE COUNTIES.
i l
l EP-105 R;v. 10 Pcg3 10 of 14 VAW/JLP/mla APPENDIX EP-105-2 GENERAL EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE Message:
This (IS) (IS NOT) a drill.
This (IS) (IS NOT) a drill.
This is Limerick Generating Station calling to report a change in emergency action level.
The General Emergency has been (DE-ESCALATED TO)
(AN UNUSUAL EVENT) (AN ALERT) (AN SITE EMERGENCY) (TERMINATED). Time and date are The plant status is (stable)
(24 Er Clock Time)
(Date)
(IMPROVING).
My name is This (IS) (IS NOT) a drill.
This (IS) (IS NOT) a drill.
t 9
~--
- m.,
l EP-105, tv. 10 Pzge.. of 14 VAU/JLP/rco APPENDIX EP-105-3 CENERAL EMERGENCY PilONE LIST Time Initiated (INITIAL NOTIFICATION)
CIRCLE PIIONE HUMBER USED Pe r sonnei / Agency To Be Notified Phone Hu mbe r Person Responding a.
Station-Superintendent Ilone Office hRrt.
s i
en' phone,s,_
Home OfficeCIEit._
lione Office 'Ert.
b.
Load Dispatcher Officec Black phonet.
c.
Montgomery County Office of Blue _ phone.
d.
Pennsylvania Emergency Management Agency
' ' ~ ~
White Ph'onef
)
(8AM-4PM) e.1
~
J'
~
j
/
~
(PEMA after ho [ '
s Manager - Public Information llome f.
Ronald liarper Office BlaclLphone.
Pager._ (After Tone, dial phone
~~
number which you are using)
D
l EP-105, tv. 10 P ge 12 of 14 VAU/JLP/rga.
l APPENDIX EP-105-3 CENERAL EMERGENCY PIlONE LIST Time Initiated (INITIAL NOTIFICATION)
CIRCLE PflONE i
NUMBER USED j
Personnel / Agency To Be Not ifled Phone Humber Time Person Renponding g..
Director - Emergency lione Prepa redness,
Office
~~
j q
~ Black phone, l
l q
Home Q _
f Office Ex t..
h.
Red. Phone l
l l
Make this call last and remain on i
telephone until NRC disconnects l
l (Person contacting NRC must be Licensed Operator)
Agencies to be contacted after the above personnel / agencies have been notifed
/
~
i.
Berks County Emergency Blue ph_ ODE.
Management Agency
~
(
j.
Chester County Emergency Blue phone.
Services k.
Operations Security i
Completed By:
Time /Date Verified By:
EMERGENCY DIRECTOR D
.~
l' l
EP-105, tv. 10 Page.. of 14 VAll/JLP/rg3 l
APPENDIX EP-105-4 l
CENERAL Er1ERGENCY PIfONE LIST t
Time Initiated (ESCALATION OR DE-ESCALATION) l CIRCLE PIIONE I
NUMBER USED Personnel / Agency To Be Notified Phone-Number -
Person Responding i
a.
Station Supet ntendent Home
(
i l
Office (
s_
i
' Brown' phone,
..)
(
Home i Office.
-J II N.
Office @ut.
b.
Load Dispatcher Officek s
\\
~
Black pho A.
J c.
White phone (8am-4pm
(.y
( 8am-4pm)
(8am-4pm)\\
(PEMA a f te d.
N Red. Phone -
g b
,4 l
Make this call last and remain on
~~
telephone until NRC disconnects (Person contacting NRC must be Licensed Operator)
_ _ _ _ _ _ _. _. _. _ _ _ _ _. _.. _. ~.. -.
l
-EP-105,-
ev. 10, Page ce of 14 VAH/JLP/rgs.
APPENDIX EP-105-4 CENERAL EMERGENCY PHONE LIST Time Initiated (ESCALATION OR DE-ESCALATION) i CIRCLE PHONE NUMBER USED I
Personnel /Acency To Be Notified Phone Number Time Person Responding f
Agencies to be contacted after the above personnel / agencies have i
l been notified
~
l
.e.
Montgomery County Office Blue phone.'
of Emergency Preparedness f.
Berks County Baergency Blue phone,"
L Management Aeency
~
t
-g.
Chester County Energency Blue pheat.
Services Completed By:
Time /Date Verified By:
DIEBGENCY DIRECTOR i
I l
\\
i l
l
l onaer l
/
o,,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
E
,I wassmotom. o. c. 20sss
%... + #'
i August 16, 1935 i
l i
.50-352/353 Limerick MEMORANDUM FOR:
Chief, Document Management Branch, TIDC FROM:
Director, Division of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be mAde publici available.
[
/f -
}
. M. Felton, Director Division of Rules and Recor g'/ I*
Office of Administration l