ML20136J129
| ML20136J129 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/09/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20136J133 | List: |
| References | |
| NUDOCS 8601130219 | |
| Download: ML20136J129 (2) | |
See also: IR 05000327/1985040
Text
_
,
,
SAFEGUARDS INFORMATION
J A N 0 91986
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
$3fE2U,ED3 Jgg,gg pg
Manager of Power and
Engineering (Nuclear)
6N11 B Missionary Ridge Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT: REPORT NOS'. 50-327/85-40 AND 50-328/85-40
On November 18-22, 1985, NRC inspected activities authorized by NRC Operating
License Nos. OPR-77 and DPR-79 for your Sequoyah facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection conusted of selective examinations of procedures and
,
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
-In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in NRC's Public Document Room.
t
Should you have any questions concerning this letter, please contact us.
Sincerely,
!
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-327/85-40
and 50-328/85-40
cc w/ enc 1:
(See page 2)
~
8601130219 860109
fDR
ADOCM 05000327
ENCZ,OSUBE CONTAINS
3.VLGUtJ.DS NFCRMATION
o
" " " ^ * "* *"*'
"* 2 8 " "
-
SAFEGUARDS INFORMATION
b' Oh ,
,
i
- .-
,
- SAFEGUARDS INFORMATION'
.
,
Tennessee Valley Authority
2
JAN09 m
cc.w/ encl:
H. L.~Abercrombie, Sequoyah Nuclear Plant
Site Director
P. R. Wallace, Plant Manager
K. W. Whitt, Chief, Nuclear
Safety Review Staff
D. L. Williams, Jr. , Supervisor
Licensing Section
G. B. Kirk, Compliance Staff Supervisor
J. E. Wills, Project Engineer
bec w/ encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
NRC Resident Inspector
Document Control Desk, 016
State of Tennessee
.
t
RI9i
W
RII
RII
RI
RII
4N\\
~
WTobin:dr
0c
re
ar
JPSL;ohr
S ise
12/(j/85
12//7/85
bg /8fp
19/7/85
'/Yltt
i
SAFEGUARDS INFORMATION
">J!n.t?!.Tl=,,,,
N SEPARArzog ygg3
PAGE 28 DEC,curgg,
_
.