Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D1211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with ML20212A4481999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With ML20210L7051999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With ML20209D7741999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 ML20195G4651999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Lgs,Units 1 & 2 ML20209D7791999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Limerick Generating Station,Units 1 & 2 ML20195G4761999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2 ML20206N2901999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Limerick Generating Station,Units 1 & 2.With ML20205N9311999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Limerick Generating Station,Units 1 & 2.With ML20207J7461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Limerick,Units 1 & 2.With ML20199F9611998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Limerick Generating Station.With ML20206N4061998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Limerick Generating Station,Units 1 & 2.With ML20195C9771998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Limerick Generating Station,Units 1 & 2.With ML20154H5691998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Limerick Generating Station,Units 1 & 2.With ML20151X3511998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Limerick Generating Station Units 1 & 2.With ML20237B4711998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Limerick Generating Station,Units 1 & 2 ML20236P9781998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Limerick Generating Station,Units 1 & 2 ML20249A5331998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Limerick Units 1 & 2 ML20247H5071998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Limerick Generating Station ML20216F3601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Limerick Generating Station,Units 1 & 2 ML20216F3471998-02-28028 February 1998 Revised Monthly Operating Rept for Feb 1998 for Limerick Genrating Station,Unit 1 ML20216F9471998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Limerick Generating Station,Units 1 & 2 ML20202G5161998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Limerick Generating Station,Units 1 & 2 ML20198M1971997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Limerick Generating Station ML20203F8231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Limerick Generating Station,Units 1 & 2 ML20199B7461997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Limerick Generating Station,Units 1 & 2 ML20211N9961997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Limerick Generating Station Units 1 & 2 ML20216J1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Limerick Generating Station,Units 1 & 2 ML20210L4971997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Limerick Generating Station ML20148K4131997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Limerick Generating Station,Units 1 & 2 ML20141A4831997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Limerick Generating Station Units 1 & 2 ML20137T4761997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Limerick Generating Station,Units 1 & 2 ML20135F6461997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Limerick Generating Station Units 1 & 2 ML20134F6371997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Limerick Generating Station Units 1 & 2 ML20133G5771996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Limerick Generating Station Units 1 & 2 ML20149M2801996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Limerick Generating Station Unit 1 & 2 ML20134J9041996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Limerick Generating Station Units 1 & 2 ML20128N3041996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Limerick Generating Station Unit 1 & 2 ML20117N2081996-08-31031 August 1996 Monthly Operating Repts for Limerick Generating Station for Aug 1996 ML20116K2331996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Limerick Generating Station Units 1 & 2 ML20115F0471996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Limerick Units 1 & 2 ML20117K9601996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Limerick Generating Station Units 1 & 2 ML20117E0851996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Limerick Generating Station Units 1 & 2 ML20107B6841996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Lgs,Units 1 & 2 ML20106H0561996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Limerick Generating Station ML20097D1581996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Limerick Generating Station Units 1 & 2 ML20096G1991995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Limerick Generating Station Units 1 & 2 ML20095E6141995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Limerick ML20094J2511995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Limerick Generating Station Units 1 & 2 ML20094J2771995-09-30030 September 1995 Revised Monthly Operating Rept for Sept 1995 for Limerick Generating Station Unit 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D1211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A8861999-09-13013 September 1999 Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01 ML20212A4481999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With ML20211E9891999-08-20020 August 1999 LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5 ML20210L7051999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With ML20209G0211999-06-30030 June 1999 GE-NE-B13-02010-33NP, Evaluation of Limerick Unit 2 Shroud Cracking for at Least One Fuel Cycle of Operation ML20209D7741999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 ML20207H8331999-05-31031 May 1999 Non-proprietary Rev 0 to 1H61R, LGS - Unit 2 Core Shroud Ultrasonic Exam ML20195G4651999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Lgs,Units 1 & 2 ML20209D7791999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Limerick Generating Station,Units 1 & 2 ML20195B3021999-05-0606 May 1999 Rev 0 to PECO-COLR-L2R5, COLR for Lgs,Unit 2 Reload 5 Cycle 6 ML20206N2901999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Limerick Generating Station,Units 1 & 2.With ML20195G4761999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2 ML20206D8971999-04-22022 April 1999 Rev 2 to PECO-COLR-L1R7, COLR for Lgs,Unit 2 Reload 7, Cycle 8 ML20205N8341999-04-0101 April 1999 Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified ML20205N9311999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Limerick Generating Station,Units 1 & 2.With ML20204G9851999-03-11011 March 1999 Safety Evaluation Re Revised Emergency Action Levels for Limerick Generating Station,Units 1 & 2 ML20207J7461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Limerick,Units 1 & 2.With ML20199G2371999-01-31031 January 1999 Rev 0 to NEDO-32645, Limerick Generating Station,Units 1 & 2 SRV Setpoint Tolerance Relaxation Licensing Rept ML20199L5301999-01-19019 January 1999 Special Rept:On 981214,seismic Monitor Was Declared Inoperable.Caused by Spectral Analyzer Not Running.Attempted to Reboot Sys & Then Sent Spectral Analyzer to Vendor for Analysis & Rework.Upgraded Sys Will Be Operable by 990331 B110078, Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 11998-12-31031 December 1998 Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 1 ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20199F9611998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Limerick Generating Station.With ML20198C7151998-12-10010 December 1998 Rev 1 to COLR for LGS Unit 1,Reload 7,Cycle 8 ML20198A3871998-12-10010 December 1998 Safety Evaluation Supporting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20206N4061998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Limerick Generating Station,Units 1 & 2.With ML20199E3281998-11-23023 November 1998 Rev 2 to PECO-COLR-L2R4, COLR for Lgs,Unit 2,Reload 4,Cycle 5 ML20195C9771998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Limerick Generating Station,Units 1 & 2.With ML20154H5691998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Limerick Generating Station,Units 1 & 2.With ML20151X3511998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Limerick Generating Station Units 1 & 2.With ML20237F0291998-08-27027 August 1998 Special Suppl Rept:On 960425,one Loose Part Detection Sys (Lpds) Was Identified to Be Inoperable.Initially Reported on 960531.Caused by Loose Parts Detector Module.Repairs Performed & Intermittent Ground No Longer Present ML20237D1041998-08-17017 August 1998 Books 1 & 2 of LGS Unit 1 Summary Rept for 960301-980521 Periodic ISI Rept 7 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20236X7641998-07-31031 July 1998 Rev 0 to SIR-98-079, Response to NRC RAI Re RPV Structural Integrity at Lgs,Units 1 & 2 ML20237B4711998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Limerick Generating Station,Units 1 & 2 ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20151Z4881998-06-30030 June 1998 GE-NE-B1100786-02, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 2 ML20236P9781998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Limerick Generating Station,Units 1 & 2 ML20196K1801998-06-30030 June 1998 Annual 10CFR50.59 & Commitment Rev Rept for 970701-980630 for Lgs,Units 1 & 2. with ML20249B3501998-06-11011 June 1998 Rev 1 to PECO-COLR-L2R4, COLR for LGS Unit 2 Reload 4,Cycle 5 ML20249A5331998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Limerick Units 1 & 2 ML20247M7071998-05-14014 May 1998 Safety Evaluation Supporting Amend 128 to License NPF-39 ML20217Q5101998-05-0404 May 1998 Safety Evaluation Supporting Amend 127 to License NPF-39 ML20247H5071998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Limerick Generating Station ML20216F3601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Limerick Generating Station,Units 1 & 2 ML20217M0791998-03-31031 March 1998 Safety Evaluation Supporting Amends 125 & 89 to Licenses NPF-39 & NPF-85,respectively ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML20216F9471998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Limerick Generating Station,Units 1 & 2 ML20216F3471998-02-28028 February 1998 Revised Monthly Operating Rept for Feb 1998 for Limerick Genrating Station,Unit 1 1999-09-30
[Table view] |
Text
.
4 I OPCATIHS DATA LEPORT DOCKET HD. 50 352 DATE NOVEteER 15, 1985 COMPLETED BY Mf!LADELPHIA ELECTRIC COMPANY W.M.ALDEN FNrtTHEER-IN-CHARGE LICENSING SECTION HUCLEAR GENERATION DIVISI0H TELEPHONE I2153 841-5022 OPERATIHS STATUS
- 1. UNIT HAME8 LIMERICK UNIT 1 l NOTES THE UNIT INCURRED ONE l
. ............................... l l
- 2. REPORTING PERIDO OCTOBER, 1985 l SCHEDULED SHUT 00bR4 FOR l
................. ........ l l
- 3. LICENSED THERMAL POWERittlTit 3293 l TESTING ONE AUTO-SCRAM, l
................ I I
- 4. NAMEPLATE RATINS (GROSS MWEls 1992 l Ape ONE FORCED LOAD REDUCTION l
. ............ l l
- 5. DESIGN ELECTRICAL RATING (HET PteEl* 1055 l l
......... I I
- 6. NAXIMUM DEPDeABLE CAP 8 CITY (GROSS teltli .
l l
.... l I
- 7. MAXIMUM DEPDeABLE CAPACITY INET tt4Els .
I l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS HUMBER 3 THROUGH 7) SIHCE LAST REPORT. SIVE REASONS
- 9. POWER LEVEL TO betICH RESTRICTED IF ANY (HET PG4 Ele
- 10. EEASONS FOR RESTRICTIONSe IF ANY8 THIS MONTH YR-TO-DATE CLMULATIVE
- 11. HOURS IN REPORTING PERIDO 745
............ .....4..e.83.3 ... 4. 8 33..
- 12. HUPRER OF HOURS REACTOR WAS CRITICAL 603.6 3.230.0 3,267.7 13e REACTOR RESERVE SHUTDOWN H0tAIS 0.0 0.0 0.0
- 14. HOURS SEHERATOR ON-LINE 567.2 1,494.6 1.494.6
- 15. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0 1
i
- 16. GROSS THERMAL ENER6Y SENERATED (Ptet) 941.899 l e %5,076 1.965.076
- 17. GROSS ELECTRICAL ENERGY SENERATED (Pteil 261,908 441.086 441.084
- 18. HET ELECTRICAL EHERGY GENERATED titell 24te341 366.479 366.479 19e UNIT SERVICE FACTOR 76.1 20.5 18.6 i 0601100040 851031 PDR ADOCK 05000352 *
, R PDR
[ . 7
- 20. UNIT AVAILABILITT FACTOR 76.I 20.5 18.6 ;
- 21. LMIT CAPACITY FACTOR (USING MDC NET) a e * !
2E. LMIT CAPACITY FACTOR (USING DER NET) e a m
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 0.0
- 24. SHUTDONHS SCHEDULEO OVER NEXT 6 MONTHS ITYPEe DATE. AHD DURATION OF EACHis UNIT 81 IN STARTUP TESTING. !
- 25. IF SHUTDC644 AT Ett OF REPORT PERIOD. ESTIMATED DATE OF STARTUPt
- 26. UNIT 3 IN TEST STATUS (PRIOR TO C0ft1ERCIAL OPERATIDHit FORECAST ACHIEVED
. INITIAL CRITICALITY 12/19/84 12/22/84 IHITIAL ELECTRICITY MID APRIL 85 4/13/85 CorttERCIAL OPERATION IST QTR 86 O NOT APPLICABLE PRIOR TO CCP.?tERCIAL OPERATIDH I
t O g 9
i
( *
< - - _ _ ~ - - - - . . - . . - - . , . _ _ _ _ _ . , _ _ _
C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 352 UNIT LIMERICK LMIT 1 DATE HOVEteER 15. 1965 COMPANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION
$5JCLEAR GENERATION DIVISION TELEPHONE t215) 841-5022 HONTH OCTOBER 1985 CAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL OteE-NETI (MWE-NETI 1 - 305 17 448 2 397 18 260 3 394 19 397 0 407 20 404 5 418 21 409 4
6 381 22 421 7 409 23 418 8 190 24 423 9 0 25 468 10 0 26 540 11 0 27 491 12 0 ft 510 13 0 29 617 14 0 30 620 15 0 31 606 i 16 243 3
4 a
e s
- l UNIT SHUTD0bMS Ape PONER REDUCTIONS DOCKET NO. 50 352 LMIT HAME LIMERICK LMIT 1 DATE HDYEteER 15. 1985 REPORT MotCH OCTOBER, 1985 CtmPLETED BY PHILADELPHIA ELECTRIC COMPANY N.M.ALDEN ENGINEER-IN-CHAAGE LICENSING SECTION MJCLEAR GEHERATION DIVISION TELEPHONE (215) 841-5022 l l l l l METHOD OF l LICENSEE lSfSTEMICOMPONENTl CAUSE Ate CORRECTIVE l lTYPflDutATIOHlREASONISHUTTING DonMl EVENT l CODE l CODE l ACTION TO' '
H0.1 DATE I (131 (HOURSil (2) l REACTOR (31 l REPORTekI (4) l (5) l PREVENT RECURRENCE I I I I l l l 'I I O 1 851001 i S l 156.5 1 B1 4 i HA l ZZ l ZZZZZZ l PLAINED TURBINE TRIP FOR STPt7.3, MAIN TURBINE i l l I l l l l l TRIP FOR TC.3 BY ACTUATING THE MANUAL TURBIHE I l l l l l l l l TRIP PUSHBUTTON FOLLONED BY REACTOR SCRAM Ate i l l l l l l l l l CLOSUPE'0F 4 MAIN TURBINE STOP VALVES.
I I I i 1 1 I I i le 1 851015 l F l 921.3 i H l 3 1 85-83 l HH l PUMPXX l LON LEVEL REACTOR SCRAM CAUSED BY REACTOR l l I l l l l l l PRESSURE INCREASING BETOND THE CAPABILITY OF 1 l l l l l l l l THE ColeENSATE PUMPS PilIOR TO REACTOR F8EDPLMPS l l I I l l l l l BEING PLACED IN SEEVICE.
I I I I I I I 1 1 II l 851031 l F l 000.0 i H l 4 i NA l EB l ELECON 1 LOAD REDUCTION FROM 68% TO 43% DUE TO RECIRC I l l l l l l l l RUleACK CAUSED BY LOOSE CotNECTION AT PIN 3 l l l l l l l l l ON PONER SUPPLY C.3t-K163.
I i 1 ----- 1 I I I I I l l l 177.8 I l l l l l s
(1) (El (3) (4) i P FORCED REASON METHOD EXHIBIT G . INSTRUCTIONS l B . SCHEDULED A . ERUIPMENT FAILURE (EXPLAIH) 1. HAMJAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 . MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C . REFUELINS 3 AUTOMATIC SCRAM.- EVENT REPORT (LER)
D RESULATORY RESTRICTION 4 . OTHER (EXPLAINI , g FILE (HUREG-0161)
E . OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
S . OPERATIONAL ERROR (EXPLAINI f
L I
r ]
H . OTHER(EXPLAIN) EXHIBIT g . SAffE SOURCE l
l l
l l
E G
h
r
.. =
Dockot No. 50-352 Attachment to Monthly Operating Report for October, 1985 Limerick Generating Station Unit 1 October 1 through October 31, 1985 I. Narrative Summary of Operating Experiences The unit began the month at approximately 48% power.
On October 8, while clearing a block on the "A" Standby Liquid Control (SBLC) pump, an unexpected pump start occurred injecting sodium pentaborate solution into the reactor pressure vessel ( RPV) . The SBLC system was shutdown af ter an assessment of plant conditions confirmed that the boron injection was not required. The reactor water conductivity increased to approximately 6.5 micromhos/cm as a result of the sodium pentaborate injection. After the SBLC injection, a planned turbine trip test was performed successfully resulting in the expected reactor scram. The unit was placed in the cold shutdown condition, thereby satisfying the reactor water chemistry requirements of the Technical Specifications.
The cause of the SBLC injection has been traced to a design deficiency (relay race) in the pump's start logic. A permanent resolution is under review by the Engineering &
Research Department.
On October 14, the reactor was restarted. The next day, the unit scrammed from 2% power on reactor low water level.
The reactor water level dropped due to reactor pressure increasing beyond the capability of the condensate pumps prior to reactor feedpumps being placed in service. The reactor was restarted and the turbine-generator was synchronized the same day.
On October 31, load was reduced from 68% to 34% due to a recirculation runback caused by a loss of the total feedwater flow input to the runback circuitry. The loose connection on the 24 Volt DC power supply, that caused disruption to instrumentation in the power chamber, was l reconnected and the unit returned to power escalation.
)
The unit ended the report period in start-up testing at !
approximately 68% power.
l l
Dockat No. 50-352 Attachment to Monthly Operating Report for October, 1985 Page 2 II. Challenges to Relief Valves During this month, there were no challenges'to the main steam system safety-relief valves.
1
W 0
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (21510414000 November 15, 1985 Docket No. 50-352 Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Limerick Generating Station Monthly Operating Report Gentlemen:
Enclosed is the monthly operating report for Limerick Unit 1 for the month of October, 1985 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, t
- l/
R. H. Logue Superintendent Nuclear Services Attachment cc: Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr. T. E. Murley, NRC Mr. Stan P. Mangi, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)
INPO Records Center See Attached Service List 4