ML20136H466
| ML20136H466 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/13/1984 |
| From: | Zeiter D AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| SP-I-033-D, SP-I-33-D, NUDOCS 8508200348 | |
| Download: ML20136H466 (13) | |
Text
7[
+ %*,"e.g.,,,..y -
,,N
,r/
00150 ADENTWlES-f Ih"
_3stEIV "
GPUNC USE
,es,.
. serv comeet-7 l
j l
seer--
[
g g
fi l
l l
neeerhr NAME:
\\/}
f/ (
(Please Print) 00CKETED usu:,C 1(a)
On Wednesday, March 28, 1979, ( N d Est beaccident),were-you aware or informed of the containrent pressure spike which was recorded at approximately 1:50 g.gon-that,date at 'IMI-27 c:: :i l_~l Yes, I was aware.
13 Yes, I was informed.
1_I No l_~l I do not remember.
1(b).
If your answer to 1(a) is yes, at what time did you becore aware or at what tire were you informed of the spike?
l_~l I became aware or was informed of the spike at alcut o' clock.
[I I do not remember.
1(c).
becme informed of the spike?If your answer to 1(a) is yes, how w (State briefly below) h tuts InfoOeb by' W /k /
ius de.Cs l/~
Yl}e N /1? P 6N Wh ff / /d l_~l' I do not remerber.
ATIAOI ADDITIONAL SHErS IF NIIESSARY.
ITDi NLNBER IS BEDK3 FESPWDED 'IO CN ANY SUQ1 ADDI 8508200348 841213
^
PDR g
ADOCK 05000289 PDR
~
i l
4 1(d).
If your answer to 1(a) is yes, did you-subsequently tell or otherwise mnenw11cate with anyone else about the pressure spike? - If.so, whom did you tell, when, how, and why?;
l_~l Yes, I told:
w j
NAME DATE AND TIME' MEM OD PURPOSE (e.g., conversation, i
report, interview, deposition, testi-nony, etc.)-
j.
5 i
l_l ~
No 13l I do not remember.
1(e).
- If your answer to 1(a) is yes, describe your experience concerning
. any electrical malfunctions of. equipment that occurred at 'IMI-2 during the year preceding.the accident'.
l_~l
==
Description:==
r l
4 l
l'-
I am not aware of any such-malfunction. -
s' MI-
' I do not. remember any.. such malfunction. -
i 2(a).:
On; Wednesday,' March 28, ' 1979, - did you hear a " thud" or ',' thump" or other. noise indicating that hydrogen or some other. burn, explosion,-
or arrumly, occurred at or about' 1:50 P.M.i at' 'IMI-27 l l-i:
v
, - ~ *.
-y-
- +
w..Y--.
.h r A
r-c---
~w
.,y
1 i
. -2(a).
(Cont'd.)
ll Yes Q
No, although I was at or in the vicinity of 'IMI-2 at that tim.
l~l No, I was not at or in the vicinity of 'IMI-2 at= that tim.
l~l I do rrt remmber..
2(b).
.If your answer to 2(a) is yes, what, at the tim, did you think caused the noise?
l]l At the time, I thought the noise was~ caused by:
l~l I did not know.
l~l I do not remember.
2(c).
If your answer to 2(a) is yes, did you tell or otherwise communicate with anybody else about the noise ~at any time on !! arch 28, March 29, or March 307 If so, who did you tell and at what time?
l[l Yes, I told:
NAME-DATE TI}E
- . 4 2(c).
(Cont'd.)
1_1 No l[l
.I_do not remember.
-- 2 (d).
For any individual identified in your answer to 2(c), state very,
a briefly the substance of your crunniriication:
l_~l I told P
the following:
4 4
1 l_I I do not'r e her.
1
[
2(e)..
If your answer to 2(a) is yes, did you take any action in response to
}
the noise? What?
l_~l Yes, I took the following action:
4 I
at about o' clock on i
I_I No j
l_~l L I do not remember.-.
2(f).
'If your answer to 2(a) is yes,'.were you aware of any action ~taken by anyone else in response to the noise? ~What?-
L 5
l((I Yes,: on '
at about
- o' clock-
^
(name) took the following' action i.
IZI No.
( y 7
e
'T y'
t
-m-r-e
.p w.M
.4yra
?-
g
+ gs -
go q
n.,m 4-g y
'2(f).
(Cont'd.)
l[l I do. net remember.
2(g).
..If your answer to 2(a) is yes.-did you conclude, either at the time-
- or later, that.the noise had been caused by a hydrogen explosien or hydrogen combustion? If so, en what date and at what time?
~l[l Yes, on at about o' clock I concluded that the noise had been caused by a hydro-gen explosion or'embustion.
l_l.
No t
l[l I do not remember..
3(a).
On Wednesday, March 28, 1979, were you aware or informed that a hydrogen explosion or ccabustion had occurred in the UtI-2 centain-h t building?
1 l[l Yes, I was aware.
s
%l Yes, I vias informed.
l[l.
Ib i
l[l!
I do not remember.
' 3(b).
If your ' answer' to 3(a) is yes, at what time did you becme aware or at what time were you informed of the explosion or combustion?:
11 I became aware or was informed.there had been a' hydro-
~~~
gen explosien or cerrbustien at about 3
o' clock.
.. l2l I do not remember.
~
-m m
-.m -
m A
a--.
- m m
..m.
.1 Au-m.
. m m.-
y 1
m, L
c s
3(c).
If your answer to 3(a) is yes, how were you made aware or did you
~
become informed of the hydrogen explosion or combustion?.
-l l-(State briefly below)
Q I do not r====*=r.
3(d).
If.your answer to 3(a).is-yes, did you subsequently tell or otherwise consnunicate' to anyone else about the explosion or emi:ustion? If so,
~
whomldid you tell, when,.and why?
lI Yes, I told:
NAME I' ATE AED TDE FElHOD RJRPOSE (e.g., conversation, report, interview, deposition, testi-many, etc.)
1I No
-N_l.
I do_not' remember.
4(a).
On Wednesday, March 28,1979,1were you aware or informed of contain-ment spray actuation at 'DtI-2 at approximately 1:50_ P.M.L on that dater -
%l Yes,.:I'was aware.
l[I Yes, I.was informed.
l-l No-
'_I-4 l
' I do not remember..
. 4(b).
If your answer to 4(a) is yes, did you subsequently tell or otherwise ccanmunicate with anyone else about spray actuation?
o-l]l Yes, I told:
1_i_
No I do not remember.
5(a).
On Waan M ay, March 28: Thursday, March 29, or Friday, March 30, 1979, were you aware or informed of any instruction not to activate equignent in the TMI-2 reactor building because it might cause a spark and/or hydrogen explosion?
' l~l Yes, I was aware.
Yes, I was informed.
1_l No l_~l I do not remember.
5(b).
If your answer to 5(a) is yes, on what date was the instruction given?
l[l
'Ihe instruction was given on March
, 1979.
l[
I do not remember.
5(c).
If your answer to 5(a) -is yes, who gave the instruction?
l~l gave the instruction.
I2l I do not remember.
5(d).
If your answer to 5(a) is yes, how did you learn of the instruction?3
~
l_-l I heard give the instruction.
s
. T'
, i l-
-5(d).
(Cont'd.)
i l~l told me about the =
~
g instruction.
l{l other (explain) i i
~
~
%I.
I do not remember.
5(e).
If your answer to 5(a) is yes, did you take any specific actions :in response to the instruction? hhat actions?
i l_~l Yes, I took the following acticnst t
i 131 No l~l.
No specific action on my part required.
l_I I do not remember.
5(f).
i
.Do you know of anyone else who, on March 28, March 29, or March 30, was aware of any instruction not to activate equiptrent in the' reactor building because it:might caus,e a spark and/or, hydrogen explosion?
4 l[l Yes,'the'following persons were awar'e of such an instructions t
.l_I-
'No
'I do not remember.
X s
-.3L---
' - - - ~ - - - - - - - ' - - - -
- ~ ~ ~ ~ ^ ^ ^ ^ ~
~
1,.
d 5(g).-
If your' answer to 5(f) is yes, did the persons identified in your answer take any specific action in response to the instruction?
ll
~Yes,-the following persons took the following actions:
2 i
11 No 121
.I do not remember.-
6(a).
On March 28, 1979, were you aware at any time of any alarm (s) actu-ated by the pressure spike or hydrogen explosion?
t l_-l Yes Yo ll I do not remember.
6(b).
If your answer to 6(a) is yes, which alarm (s)?
l_l f
f l[l I do not remember.
6(c).
If your answer to 6(a) is yes, what at the time did you think caused the alarm (s)?'
I l-l '
I thought the alarm (s) was caused by:
t
, 6(c).
'(Cont'd.)
ll I did not know.
l-)
I do not remember.
6(d).
If your answer to 6(a) is yes, did you talk or otherwise comunicate with anyone about the alarm (s), either at that time or later?
1-l
.Yes, I told:
lame EATE AND TIME SUBSTANCE OF THE CCMiNICATICN 5.
l_~l No l-l I do not remember.
6(e).
If your answer to 6(a) is yes, did you take any action after becoming aware of the alarm (s)?
4 4
l-l Yes, I took the following actions:
1_I No 3
l-l I do not rerember.
7(a).
With respect to the hydrogen burn, pressure spike, or containment spray actuation that occurred at 'IMI-2 at about 1:50 P.M. on Parch 28, 1979, did you participate in, overhear, see, or learn of any-communication on these subjects between arr/ GPU employee and anybody from BfM, NRC, Commonwealth of Pennsylvania, or any other state agency or office on March 28, March 29, or March 30,-19797
. =
4 F
t 4 7. t d
j 7(a)._
(Cont'd.)
L.
I, I
l Yes I
121 No i:
I do not remember.
I 7(b).
-If your answer to 7(a) is yes, for each such ccsnunication answer the following: - (Utilize corresponding numbered lines in items 7(b)(1)
~through 7(b)(5) below to identify the specific. instance being.
answered.)
~
t 7(b)(1). Identify the subject matter, time,'date, and method-(e.g.', telephone, in person, teletype) in each instance.
J
[
samt TIME /mrz mmoo i.
I
)
II t
III-W 7(b)(2). What was the substance of each
- mication,
~
i I
II III 5
c IV i-
]
7(b)(3). Identify all participants in each consnunication.
I i
~
II.
P
[
III 4
+
b i-1 m m u m
m
~
'.t, l
- 7(b)(4). If you were not a participant, did you overhear or see the communica-tion in each instance?
I II III.
l IV 7(b)(5). If you did not participate in,. overhear, or see the communication, did you learn about the communication from any participant?
State from whcs: you learned and the time, date, method, and reason you were informed.
NAME TDE/DATE ME'niCD REASCN I
II III IV 8(a).
Do you have documents, including personal notes and files, which re-late to one or more of the.following?
1.
Generation and subsequent ccabustion of hydrogen on March 28, l
1979 at 'IMI-2:
2.
The pressure spike in the 'IMI-2 reactor building at or about 1:50 P.M. cn March 28,'1979; 3.
'Ihe actuation of the 'IMI-2 reactor building spray at or abut 1:50 P.M. on March-28, 1979;
-4.
Any instruction on March 28, March 29, or March 30, 1979 not to activate equipment in the 'IMI-2 reactor building because it might cause a spark and/or hydrogen explosion 5.
l_
The " thud" or " thump" or other noise indicating that a hydrogen
'or, scme other burn, explosion, or anomaly occurred at or about
'1:50 P.M. on March 28,1979, at 'IMI-2r i
6.
' Any alarm (s) actuated by the pressure spike or hydrogen explosion on March 28,.1979,- at 'IMI-2; and l.
i:
1
+
.. y
, 8(a).
(Cont'd.)
7.
~Any comunications or methods or lines of connunication on March 28, 1979, related to generation and subsequent combustion of hydrogen, pressure spike,l or containment spray actuation that occurred-that date at 'IMI-2 1_"~l Yes, I do have documents.
$l No, I do not have any docurents.
8(b).
If your answer to 8(a) is yes, please complete the following:
You may ccntact me at (telephone nurber),
cn (date) at (time), to arrarge receiving copies of these documents.
1 1
1 L
n.
(
V i
t 0532u
- -