ML20136H462
| ML20136H462 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/13/1984 |
| From: | Deman J AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| SP-I-TMIA-033B, SP-I-TMIA-33B, NUDOCS 8508200340 | |
| Download: ML20136H462 (13) | |
Text
S A$ Y Otae Dedet
~7M//) fy $8 ~5
~
n, ne, Inth Asth} ~$[
00031 SWf
. TIID CLNt:
V Appbat ki(Dvig i
V Q
interrem Ratcito GPUNC USE o
e coar ovre l
l l
s 9'
contrata mg
/ 2
/.3 8 V '
l l
l 9
l 6
l om m._
- p I
I I
pgf7 g 52%>
$k Jolessi >l.'h' mad S
q.
piC#.@
7/
(Please Print)
'k 1$)
1(a)
On Wednesday, March 28,1979, (the first day of the accident), were you aware or informed of the centainment pressure spike which was recorded at approximately 1:50 P.M. on that cate at 'IMI-27 l[l Yes, I was anre.-
13 Yes, I was informed.
l[1 No l[l I do not rementer.
1(b).
If your answer to 1(a) is yes, at what time did you beccane aware or at what time were you informed of the spike?
l[l I became aware or was informed of the spike at alcut o' clock.
8 I do not remember.
1(c).
If your answer to 1(a) is yes, how were you made aware or did you become informed of the spike?.
l[l (State briefly below) l Q
I do not remester.
KT523T ADDITIC100 SHEETS IF NFN'JJ0(.
PLEASE BE SURE 'IO IDENTIFY EULIX WHAT ITDi NtNBER IS BEING RESPCNDED 'IO CN ANY SUCII ADDITICtRL SHEETS.
G508200340 841213 (081584)
I PDR ADOCK 05000289 l
Q PDR
a w
a n
an
- ~.
i
- l
- ,m i
1(d).
If your answer to 1(a) is yes, did you subsequently tell or otherwise communicate with anyone else about the pressure spike? If so, whom did you tell, h, hew, and why?
t l~l Yes, I told:
NAME MTE AND TIME ME2 00 PURPOSE (e.g., conversation, report, interview, deposition, testi-l many, etc.)
i i
i i
i 11 I
No i
l I do not remember.
i 1(e).
If your answer to 1(a) is yes, describe your experience concerning any electric J. malfunctions of equipment that occurred at 'IMI-2 l
during the year preceding the accident.
i l[I Descriptions I am not aware of any such malfunction.
l~l.
I do not remember any such' malfunction.
2(a).
. On Wednesday, March 28, 1979,' did you hear a " thud" or " thump" or-other noise indicating that hy& w or scue other burn, explosion, or ancmaly occurred at or about 1:50 P.M. at 'IMI-27 a
4 r
.~-
9
,-v m
e..,
4 i
2 t.i '
f 2(a).
(Cont'd.)
'l l
Yes No, although I was at or in the vicinity of W.I-2 at that time.
j l[l No, I was not at or in the vicinity of MI-2 at that time.
ll I do not remember.-
s 2(b).
If your answer to 2(a) is yes, what, at the time, did you think i:
mused the noise?
l-l At the time, I thought the noise was caused by:
l
[
l
.I r
4 i
l-l
.I did not know.
4 i
11 I do not re r.
j 2(c).
If your answer to 2(a) is yes, did you tell or otherwise censunicate with anybody else about the noise at any time on March 28, March 29, or March 307 If so, who did you tell and at what time?
11 Yes,'I, told:
2 NAME DME TIME'
\\
4 i
1 c
i
~
v 4-2(c).
(Cont'd.)
1[I No l[l I do not remember.
2(d).
For any individual identified in your answer to 2(c), state very briefly the substance of your ccumunication:
l-l I told the following:
l 4
l[I I do not remember.
2(e).
_ If your answer to 2(a) is yes, did you take any action in response to the noise? h t?
l-l Yes, I took the following actions _
i at about o' clock on l[I No l[l I do not ran==har.
2(f).
If your answer to 2(a) is.yes, were you aware of any action taken by-anyone else in response to the noise? h t?
l~l
.Yes, on at about o' clock (name) took the following action l~l No w
-m
.-~m4 v-
.e,w e
r g n.L n..
4
u,.
1 2(f).
(Cont'd.)
l-l I do not remember.
1 2(g).
If your answer to 2(a) is yes, did you conclude, either at the time or later, that the noise had teen caused by a hydrogen explosion or hydrogen c mbustion? If so, on what date and at what time?
' l-l Yes, on at about o' clock
~
Iconcludedthatthenoisehadbeencausedbyahydro-gen explosion or cochustion.
l_I No 1l I do not remember.
3(a).
On Wednesday, March 28, 1979, were you aware or informed that a hydrogen explosion or embustion had occurred in the DtI-2 contain-ment building?
l[l Yes, I was aware.
Yes, I was informed.
i l_l tb l[l I do not rememter.
3(b).
If your answer to 3(a) is yes, at what time did you become aware or at what time were you informed of the explosion or combustion?
i i-l-l I became aware or was informed there had been a hydro-gen explosion or combustion.at.about
-o' clock.
I do not ram==har.
l I
~.
4.
8 iJ
~ (c).
If your answer to 3(c) is yes, how were you made aware or did you 3
become informed of the hydrogen explosion or combustion?
l[I (State briefly below)
\\
i R
I do not remember.
4 3(d).
If ycur answer to 3(a) is yes,~did you subsequently tell or otherwise
-micate to anyone else about the explosion or combustion? If so, l
whcmi did you tell, when, and why?
l[l Yes, I tiold i
NAME DATE AND TIME FEIHOD PURPOSE (e.g., ccnversation, j
report, interview, r
deposition,~testi-many, etc.)
1 i
4 l
t l
ll No Q
I do not remember.'
4(a).
On Wednesday, March 28, 1979, were you aware or informed of contain-ment spray actuation at 'IMI-2 at approximately l':50 P.M. on that date
- l ll
-Yes, I was aware.
l-l Yes, I was informed..
No 1
m
' l_l.
I do not remester.
j i
m r
-,, - =
ee
-q,-
e.-rs e
p-pr w,--
a + - -
e d
s-+
w
,y da 4
-c+.-.w r.
~7~
v :,
4(b).
If your answer to 4(a) is yes, did you subsequently tell or otherwise consannicate with anyone else about spray actuation?
ll Yes,<I told l[I No l[I I do not ra===har.
1 5(a).
. On "Mr - Ly, March 28; Thursday, March 29, or Friday, March 30, 1979, were you am re or informed of any instruction not to activate equipment in the 'INI-2 reactor building because it might cause a '
spark and/or hydr e i explosion?
l[I Yes, I was aware.
l[l Yes, I was info'rmed.
IQ so l~l
-I do not' remember.-
5(b).
If your answer to 5(a) is yes, en what date was the instructicn given?
4 l[l
'Ihe instruction was given on March -
,.1979.
l[I I do not remember.
1 5(c).
If your answer to 5(a)~is yes, Who gave the instruction?
- I[I gave the instruction.
l[l I do not r====har.
1 5(d).
If your answer to 5(a) is yes, how did you learn of the instruction?
l[l I heard give the instruction.
)
L 5(d).
(Cont'd.)
s l-l told me about the instruction.
1_l
.Other (explain) 2 I
ll I do not ra===har.
7 t
5(e).
If your answer to 5(a) is yes, did you take any specific actions in response to'the instruction? What actions?
i l~l Yes, I took the following actions:
lI No l-l No specific action on my part required.
-l-l
'I do not remember..
SN).
Do you know of anyone else M, crt March 28, March 29, or March 30,
-0; was aware of any instruction not to activate equipment in the reactor
~
. building har-an== it might cause a spark and/or hydrogen explosion? -
1-l Yes, the following persons were aware of such an instructim:
= No l_l '.
I do not remember.
. /'
. e e
5(g).
If your answer to 5(f) is yes, did the persons identified in your l
answer take any specific action in response to the instruction?
t l-l
.Yes, the following persons tcok'the following-actions:
l l
9 f,-l '
No
)
p l-l I do not remember.
l 6(a).
'On March 28, 1979, were you aware at any time of any alarm (s) actu-ated by the pressure spike'or hydrogen explosion?
l-l Yes No' l-l I do not remember.
6(b).
If your answer to 6(a) is yes, which alarm (s)?.
l-l~
t l-l I do not remember.
6(c).-
' If your answer to 6(a)'Is yes,' what at the tim did you think caused the alarm (s)?
i l_-l I thought the alarm (s) was caused by:
6(c).
(Cont'd.)
l[l I did not know.
l~l I do not remember.
6(d).
If your answer to 6(a) is yes, did you talk or otherwise comunicate with anyone about the alarm (s), either at that time or later?
~
l~l Yes, I told:
NME DME AND TIME SUBSTANCE OF ME CCMINICATICN l[l Ne l[I -
I do not remember.-
6(e).
.If your answer to 6(a) is yes, did you take any action after becoming aware of the alarm (s)?
l[l Yes, I took the folicwing actions:
l[I No
'l[l I do not r*= amber.'
7(a).-
~With respect to the hydrogen burn, pressure spike, or containment spray actuation' that occurred at 'IMI-2 at about 1:50 P.M. on March
.28, 1979,' - did you participate in, overhear, see, or learn of any
]
o casumunication on these subjects between any GPU employee and anybody from BW, NIC, Ccamenwealth of Pennsylvania, or any other state I
agency or office on March 28,' March 29, or March 30, 19797
i a
' u 7(a).
(Cont'd.)
l[l Yes FY No n-l-l I do not remember.
7(b).
If your answer to 7(a) is yes, for each such communication answer the followings. (Utilize corresporx$ing numbered lines in iten:s 7(b)(1) through 7(b)(5) below to identify the specific instance being answered.)
7(b)(1). Identify the subject matter, time, date, and method (e.g., telephone,
- in person, teletype) in each instance.
SL%TECT TIME /DATE FEIHOD I
II III IV 7(b)(2). What was the substance 'of each communication.
I II III IV 7(b)(3). Identify all participants'in each cr-mwiication.
I i
II.
III IV
P.
w 3
- 7(b)(4). If you were ret a participant, did you overhear or see the communica-tien in each instance?
I II I
III IV 7(b)(5). If you did not participate in, overhear, or see the camunication, did you learn about the -w11 cation frca any participant? State fr a wh m you learned and the time, date, method, and reason you were informed.
NAME TIME /DATE MEHKE REASCN I
I II III IV.
8(a).
-Do you have documents, including personal notes'and files, which re-t late to'one or more of the following?
i i
i1.
Generation and subsequent embustion of hydrogen on March 28, 1979 at 'IMI-2; 4
1 2.
The pressure spike in the 'IMI-2 reactor building at or about i
1:50 P.M. en March 28, 1979;
^
3.
'Ihe actuation of the 'IMI-2 reactor building spray at or about i
1:50 P.M. on March 28, 1979; 4.
' AnyinstructiononMark28, March 29,.orMarch 30,~1979 not to activate equipment in the 'INI-2 reactor building because it might cause a spark and/or hydrogen: explosion 5.
The " thud" or "thung" or other noise indicating that a hydrogen or some other burn, explosion, or arw=aly occurred at or about 1:50 P.M. cn March 28,1979, 'at 'IMI-2; 6.
. Any alarm (s) actuated by the pressure spike or hydrogen explosien crt March 28,1979, at 'IMI-2; -and '
4 s
e r
3
-,,,.,-,.cw.
,+
---s me
i),.,
8(a).
(Cont'd.)
7.
Any communications or methods or. lines of communication on March 28, 1979, related to generation and subsequent combustion of hy&%, pressure spike, or containment spray actuation that occurred that date at 'IMI-2.
l[l Yes, I do have h=nts.
No, I do not have any documents.
8(b).
If your answer to 8(a) -is yes, please complete the following:
You.may contact me at (telephone neber),
on (date) at-(time), to arrange receiving copies of these documents.
' w.i!T 9c. /9/{
f h4-
.g me-yj same 1
0532u i-
._