ML20136H450
| ML20136H450 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/13/1984 |
| From: | Mulleavy T AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| SP-I-TMIA-033A, SP-I-TMIA-33A, NUDOCS 8508200328 | |
| Download: ML20136H450 (14) | |
Text
..
}~pttA #32/1 w
2 00307 m
4~
f GPUNC USE I
I I
I I
I I
I I
I I
I
-. Taomas L %l lea <v (Please Print)
/
1(a)
On Wednesday, March 28, 1979, (the first day of the accident), were you aware or informed of the containment pressure spike which was recorded at approximately 1:50 P.M. on that date at 'IMI-27 Ql Yes, I was aware.
l~I Yes, I was, informed.
l-l No lI I do not ramamber.'
1(b).
If your answer to 1(a) is yes, at what. time did you become aware or at what time were you informed of the spike?
l~l I hac=== aware or was informed of'the spike at'about o' clock.
IR_l I do not remember.
1(c).
.If your answer to 1(a) is yes, how were you made aware or did you becane informed of the spike?
{
lI (State briefly below)
..L Neen Yks SotsnY ctn$ SQW hhe c Im,- /-
~
l~l I do not remember.
AruG ADDITIONAL Sht.r.;rs IF NECESSARY. PIDSE BE SURE 'IO IDENTIFY R.T.LY HEAT ITEM 2KNBER IS BEDXi RESPCNDED 'IO CN MlY SUG ADDITICIAL SEIETS.
1
' ~ ~ " '
{
8508200328 841213 0
PDR ADOCK O M 289 (081584).
j G
,-PDR
\\
J
O 1
1 t
x
=h.D \\
Yk 5 A 1
4d=
a s.
=
n 0 ci un..
e s
D I E ". U Ek O
. g g. g g: g*4 t
- E a
- -
1m% 4 N
.N s~ d J.
u.
1
+
=.
Ya t.
ae
^a i-3 jD 5 s
e t*
e e -. 9..e.n. s r e
- +
g3 : 3 1 ; <g.
c
.>u
. Q cp -
pp
. -p p
>y
-4 41 94.s a_-
~
If your answer to 1(al is yes, did you s@egletly tell or otherwise If so, whcm 1(d).
ccumunicate with anyone else about the pressure spike?
did you tell, when, hcw, and why?
ll Yes, I told:
tUeE IATE AND TIME MEHHDD PURPt2SE (e.g., conversation, report, interview, deposition, testi-many, etc.)
4 9
IZI tro
~
-12
~I do not remember.
If your answer to 1(a) is yes, describe your experience concerning d at 'D1I-2 1(e).
.any electrical _ malfunctions of equipment that occurre during the year preceding the accident.
ll
==
Description:==
E Y
ll I am not aware of any such malfunction.
IXl I do not remember any such malfunction.
Oc.Vednesday, March 28, 1979, did you hear a " thud" or "thurp" or other noise indicating that hydrogen or some other. burn, explosion, 2(a)..
or arv=aly occurred at or about 1:50 P.M. at 'IMI-27 b
4 5
2(a).
(Cont'd.)
13 Yes l-l No, although I was at or in the vicinity of M I-2 at that time.
l-~l No, I was not at-or in the vicinity of M I-2 at tint time.
1-l I do not remember.
2(b).
If your answer to 2(a) is yes, what, at the time, did you think caused the noise?
ll At the time, I thought the noise was caused by:
lEl I did not know.
i l-l I do not remember.
^
2(c).
If your answer to 2(a) is yes, did yeu tell or otherwise cetnmunicate with anytody else about the noise at any time on !! arch 28, turch 29, or March 307 If so, who did you tell and at what time?
l-l Yes,-I told:
NPNE DATE TDI e
m
. 2(c).
(Cont'd.)
11 No I do not remember.
2(d).
For any individual identified in your answer to 2(c), state very briefly the substance of your connunication:
a ll I told the following:
181 I do not ramamber.
2(e).
If your answer to 2(a) is yes, did you take any action in response to the noise? What?
l-l Yes, I took the-following action:-
at about o' clock on 181 No l
1-I do'not remember.
2(f).
'If your answer to 2(a) is yes, were you aware of any action taken by anyone else in respcase to the noise? What?
ll Yes, on
'at about o' clock (name) took the following actica l-l
_No A
1'
- 2(f).
(Ccnt'd.)
I do not remember.
2(g).
If your answer to 2(a) is yes, did you conclude, either at the time or later, that the noise had teen caused by a hydrogen explosion or hydrogen cabustion? If so, en what date and at what time?
11 Yes, on at about o' clock I concluded that the noise had been caused by a hydro-gen explosion or embustion.
\\_1 No l$
I do not remember.
3(a).-
On Wednesday, March 28, 1979, were you aware or informed that a hydrogen explosion or cabustion had occurred in the TMI-2 contain-ment building?
l[l Yes, I was aware.
@l Yes, I was informed.
11 tb
((1 I do not remember.
3(b).
If your answer to 3(a) is yes, at whae. time did you bec me aware or at what time were you informed of.the explosion or combustion?
l-l
'I became aware or was informed there had been a hydro-gen explosien or ccebustion at about o' clock.
I do not remember.
i
4 3(c).
If your answer to 3(a) is yes, how were you made aware or did you become informed of the hydrogen explosion or ccabustion?
ll (State briefly below)
See
/c 1
((i I do not ra===har.
3(d).
If.your answer to 3(a) is yes, did you subsequently tell or otherwise consunicate to anyone else about the explosion or ccebustion? If so, whcst did you tell, when, and why?
1-l Yes, I to NAME P. ATE AND TIME
-MEDED RJRPOSE (e.g., ccnversation, j'
report, interview, deposition, testi-many, etc.)
i l-l No 12 I do not remember.
I i
4(a).
On Wednesday, March 28, 1979, were you aware or informed of contain-sent spray actuation'at TMI-2 at approximately 1:50 P.M. on that date:
l i_
Yes, I was aware.
ll
'Yes, I was informed.
ll No-lh I do r:ot remember,
4(b).
If your answer to 4(a) is yes, did you subsequently tell or otherwise communicate with arrfone else about spray actuation?
4 l
l~l Yes, I told:
IZI No I do not rama= N r.
5(a).
On Wednesday, March 28; Thursday, March 29, or Friday, March 30, 1979, were you a mre or informed of any instruction not to activate equipnent in the THI-2 reactor building because 'it might cause a seark and/or hydrogen explosion?
I-l Yes, I wais aware.
1I Yes, I was informed.'
...m.
~ l1 No
@l I do not remember.
{
5(b).
If your answer to 5(a) is yes, en what date was the instructicn given?
l-l
'Ihe instruction was given on March
, 1979.
I do not remember.
5(c).
If your answer to 5(a) is yes, who gave the instruction?
ll gave the instruction.
-1 l$
I do not remember.
5(d).
If your answer to 5(a) is yes, hcw did yet learn of the' instruction?'
4 l-l ~
- I heard give the instruction.
l
\\
f J.'
4 5(d).
(Cont'd.)
l-l told re about the instruction.
1-l Other (explain) l I
i-I do not remember.
5(e).
If your answer to 5(a) is yes, did you take any specific actions in response to the instruction? hhat actions?-
1-l Yes, I took the following actions:
11 No ll No specific action on my part required.
I 181 I do not remember.
'5(f).
Do jou know of anyme else who, en March 28, March 29, or March 30, was aware of any instruction not to activate equipment in the reactor building because it might cause a spark and/or hydrogen explosien?
l-l Yes, the following persons were aware'of such an instructions i
e d
Il No
."u Ikl
'I do not remember.
... ~
e.
,,e,,.,,,
9 5(g).
If your answer to 5(f)lis.yes, did the persons identified in your answer take any specific action in response to the instruction?
l l
l-l Yes, the following perscms took the following actions:
4 ll No d
I do' not ramenter.
i 6(a).
On March 28, 1979, were yod aware at any time of any alarm (s) actu-ated by the pressure spike or hydrogen explosion?
lI Yes l-l No I do not remember.
6(b).
If your answer to 6(a) is yes, which alarm (s)?
11 El I do not remember.
6(c).
If your answer to 6(a) is yes, what at-the time ~did you think caused the alarm (s)?
i l-l I thought the alarm (s) was caused by:
4 l
_to_
6(c).
(Cont'd.)
l[l I did not know.
I-do not remember.
6(d).
If your answer to 6(a) is yes, did you talk or otherwise conununicate s
with anyone about the alarm (s), either at that time or later?-
l[I Yes, I told:
NAME DATE AND TIME SUBSTANCE OF 'IEE CCMENICATICN l_I No El I do not rarember.
6(e).
If your answer to 6(a) is yes, did you take any action after becoming aware of the alarm (s)?
l[]
Yes, I took the following actions:
i 4
1[I No l$
I do not remember.
7(a).
With respect to the hydrogen burn, pressure spike, or containment spray actuation that occurred at 'IMI-2 at about 1:50 P.M. on March 28, 1979, did you participate in, overhear, see, or learn of any ccsuiunication on these subjects between any GPU employee and anybody from B&W, N14C, Caunonwealth of Pennsylvania, or any other state agency or office on March 28, March 29, or March 30, 19797 V
c.,
a e,
3
1 11 7(a).
(Cont 'd. )~
l_1 Yes r
l[l No I do not remember.
l 7(b).
If your answer to 7(a) is yes, for each such communication answer the following:
(Utilize corresponding numbered lines in items 7(b)(1) through 7(b)(5) telow to identify the specific instance being answered.)
7(b)(1). Identify the subject matter, time, date, and method-(e.g., telephene,
-in person, teletype) in each instance.
SUBJECT TIME /DATE BEIHOD, -
4 I
'II III IV 7(b)(2). What was the substance of each -mication.
I i
II III IV 7(b)(3). Identify all participants in each ccanmunication.
I II III
+
l l
7(b)(4). If you were not a participant, did you overhear or see the communica-tion in each instance?
I II III 4
IV i
7(b)(5). If you did not participate in,. overhear, or see the communication, i
did you learn about the - wtication frm any participant? State fr a wh m you learned and the tire, date, method, and reason you were a
informed.
NAME TIME /DATE MPIHOD REASCN j-I II e
III IV 8(a).
Do you have documents, including personal notes and files, which re-late to one or more of the following?
1.
Generation and subsequent c abustion of hydrogen on March 28, 1979 at 'IMI-2; 2.
The pressure spike in the 'IMI-2 reactor building at or about 1:50 P.M. on March 28, 1979; 3.
'Ihe actuation of the 'IMI-2 reactor building spray at or about 1:50 P.M. cm March 28, 1979; 4.
Any instruction on March 28, March 29, or March 30, 1979 not to activate equipment in the 'IMI-2 reactor building because it might cause a spark and/or hydrogen explosion 5.
The " thud" or " thump" or other noise indicating that a hydrogen or some other burn, explosion, or an m aly occurred at or about 1:50 P.M. on March 28, 1979, at 'IMI-2; 6.
. Any alarm (s). actuated by the pressure spike or hydrogen explosion on March 28,1979, at 'IMI-2; and f
J w
y f..,.
-y..,
_w.,
. l 8(a).
(Cont'd.)
7.
Any communications or methods or lines of ecznmunication on March 28, 1979, related to generation and subsequent ceabustion of hydrogen; pressure spike, or containment spray actuation that occurred that date at DiI-2.
l[l Yes, I do have documents.
@l No, I do not have any d T = ants.
8(b).
If your answer to 8(a) is yes, please complete the following:
You may contact me at (telephone ntster),
en (date) at (time), to arrange receiving copies of tinse h m ts.
b
' Date '
Name
0532u i
i i
r