A _ _ _ _ _ _ _ _ -- _ - - _.
e
- REVISE 3
- HOVEMBER 7, 1985 l
OPERATING DATA REPORT 1
j DOCKET NO. 50-334 i
DATE _10/03/53 i
COMPLETED BY 1.
A.
snith TELEPHONE. a11-AA1 1825 OPERATING STATUS g, y,g, g.
Beaver Valley Power Station. Unit N1 Nome
]
3, g,,,,g,g.,g g.
Seat- ' r 19s5 p
3
- 3. Lisemand Therinal Power (MWt):
2A'o l
- 4. Namuplete Rating (Geen MWe):
923
$. Design Electrieel Rating (Not MWe):
80 i
j
- 6. Maximuse E:; -tM: Caposity (Geese MWe):
aso i
- 7. Manimum 0; 'M: Capeswy (Not MWe):
810
- 8. If Changes Oceur in Capacity Ratimp (Iteme Number 3 Tluough 7) Sinen Last Report, Glee Reneens:
l j'
i I
(
l
- 9. Power Level Te which Restricted.lf Any (Net MWe):
None l
- 10. Reesene For Restrictions.If Any:
N/A J
l l
?
j This Month Yrto.Dete
' Cumulative i
II. Hours in Reporting Period 720.0 6;551.0 82,559.0 l
l
- 12. Number Of Hours Reactor was Critical 647.6 6.062.2 43.417.9
- 12. Resetor Reserve Shutdown Hours 0.0 0.0 4.482.a I4. Hours Generator On Line 644.s 5.915.o 41.997.e l
- 18. Unit Reserve Shutdown Hows n0 0.0 0.0 l
- 16. Cross Thermal Energy Generated (MWH) 1.627.814.0 14.513,000.9 97,911,514.9 l
1
- 17. Groes tlectrical Energy Cenerated (MWH) 517.000.0 4.657.000.0 31.151,400.0 l
- 18. Nt Electrieel Energy Generated (MWH) 4as.300.o 4.366.550.0 28.991.393.0 i
- 19. Unit Service Factor at L 90.3 53.3 i
- 20. Unit Asailability Futor 88.6 90.3 53.3 l
- 21. Unit Cepecify Factor (Using MDC Neti 83.?
8l2. 3 46.9
- 22. Unit cepecify Facter (Using DER Net) 80.7 79.8 45.5 I
- 22. Unit Forced Outage Rate 10.4 8.S 24.8 f
m j
- 24. Shutdowns Scheduled Over Nat 6 Months IType. Dete. Sad Duration of Each t:
l l
r 1
j N/A i
i 1
- 28. If Shut Down At End Of Report Period Estimated Date of Startup:
l l
- 26. Units in Test Status IPrior eo Commercial Operationi:
Foreeset Asaie,ed l
I a
L l
lNITIAL CRITICALITY N/A N/A l
INITIAL ELELTRICITY N/A N/A i
1 COMMERCIAL 0PER ATl0N N/A N/A bb
('/77) t i
- x-,:--,~-
- ----- -