Corrected Monthly Operating Rept for Sept 1985
ML20136G801
Person / Time
Site: Beaver Valley
Issue date: 09/30/1985
From: Smith P
DUQUESNE LIGHT CO.
To:
Shared Package
ML20136G794 List:
References
NUDOCS 8601080567
Download: ML20136G801 (1)


Text

A _ _ _ _ _ _ _ _ -- _ - - _.

e

  • REVISE 3
  • HOVEMBER 7, 1985 l

OPERATING DATA REPORT 1

j DOCKET NO. 50-334 i

DATE _10/03/53 i

COMPLETED BY 1.

A.

snith TELEPHONE. a11-AA1 1825 OPERATING STATUS g, y,g, g.

Beaver Valley Power Station. Unit N1 Nome

]

3, g,,,,g,g.,g g.

Seat- ' r 19s5 p

3

3. Lisemand Therinal Power (MWt):

2A'o l

4. Namuplete Rating (Geen MWe):

923

$. Design Electrieel Rating (Not MWe):

80 i

j

6. Maximuse E:; -tM: Caposity (Geese MWe):

aso i

7. Manimum 0; 'M: Capeswy (Not MWe):

810

8. If Changes Oceur in Capacity Ratimp (Iteme Number 3 Tluough 7) Sinen Last Report, Glee Reneens:

l j'

i I

(

l

9. Power Level Te which Restricted.lf Any (Net MWe):

None l

10. Reesene For Restrictions.If Any:

N/A J

l l

?

j This Month Yrto.Dete

' Cumulative i

II. Hours in Reporting Period 720.0 6;551.0 82,559.0 l

l

12. Number Of Hours Reactor was Critical 647.6 6.062.2 43.417.9
12. Resetor Reserve Shutdown Hours 0.0 0.0 4.482.a I4. Hours Generator On Line 644.s 5.915.o 41.997.e l
18. Unit Reserve Shutdown Hows n0 0.0 0.0 l
16. Cross Thermal Energy Generated (MWH) 1.627.814.0 14.513,000.9 97,911,514.9 l

1

17. Groes tlectrical Energy Cenerated (MWH) 517.000.0 4.657.000.0 31.151,400.0 l
18. Nt Electrieel Energy Generated (MWH) 4as.300.o 4.366.550.0 28.991.393.0 i
19. Unit Service Factor at L 90.3 53.3 i
20. Unit Asailability Futor 88.6 90.3 53.3 l
21. Unit Cepecify Factor (Using MDC Neti 83.?

8l2. 3 46.9

22. Unit cepecify Facter (Using DER Net) 80.7 79.8 45.5 I
22. Unit Forced Outage Rate 10.4 8.S 24.8 f

m j

24. Shutdowns Scheduled Over Nat 6 Months IType. Dete. Sad Duration of Each t:

l l

r 1

j N/A i

i 1

28. If Shut Down At End Of Report Period Estimated Date of Startup:

l l

26. Units in Test Status IPrior eo Commercial Operationi:

Foreeset Asaie,ed l

I a

L l

lNITIAL CRITICALITY N/A N/A l

INITIAL ELELTRICITY N/A N/A i

1 COMMERCIAL 0PER ATl0N N/A N/A bb

('/77) t i

  • x-,:--,~-

- ----- -