Corrected Monthly Operating Rept for Sept 1985
ML20136G801
Person / Time
Site: Beaver Valley
Issue date: 09/30/1985
From: Smith P
DUQUESNE LIGHT CO.
To:
Shared Package
ML20136G794 List:
References
NUDOCS 8601080567
Download: ML20136G801 (1)


Text

. _ . _ _ _ _ _ _ _ _ _ _ - _ -

A _ _ _ _ _ _ _ _ -- _ - - _ .

e

,

  • REVISE 3
  • HOVEMBER 7, 1985 l OPERATING DATA REPORT 1

i j '

DOCKET NO. 50-334 i

DATE _10/03/53 COMPLETED BY 1. A. snith

- TELEPHONE. a11-AA1 1825 OPERATING STATUS  !

g, y,g, g. Beaver Valley Power Station. Unit N1 Nome

] 3, g ,,,,g,g p.,g g. Seat- ' r 19s5 3 3. Lisemand Therinal Power (MWt): 2A'o l

4. Namuplete Rating (Geen MWe)
923 '

! $. Design Electrieel Rating (Not MWe): 80 i

j 6. Maximuse E:; -tM: Caposity (Geese MWe): aso i 7. Manimum 0; 'M: Capeswy (Not MWe): 810

8. If Changes Oceur in Capacity Ratimp (Iteme Number 3 Tluough 7) Sinen Last Report, Glee Reneens:

j' l i I

(

l 9. Power Level Te which Restricted.lf Any (Net MWe): None l 10. Reesene For Restrictions.If Any: N/A J

l l

?

j This Month Yrto.Dete ' Cumulative i .

! II. Hours in Reporting Period 720.0 6;551.0 82,559.0 l l 12. Number Of Hours Reactor was Critical 647.6 6.062.2 43.417.9  :

! 12. Resetor Reserve Shutdown Hours 0.0 0.0 4.482.a

! I4. Hours Generator On Line 644.s 5.915.o 41.997.e l

18. Unit Reserve Shutdown Hows n0 0.0 0.0 l 1
16. Cross Thermal Energy Generated (MWH) 1.627.814.0 14.513,000.9 97,911,514.9 l
17. Groes tlectrical Energy Cenerated (MWH) 517.000.0 4.657.000.0 31.151,400.0 l i
18. Nt Electrieel Energy Generated (MWH) 4as.300.o 4.366.550.0 28.991.393.0  !
19. Unit Service Factor at L 90.3 53.3 i
20. Unit Asailability Futor 88.6 90.3 53.3 l 21. Unit Cepecify Factor (Using MDC Neti 83.? 8l2. 3 46.9
22. Unit cepecify Facter (Using DER Net) 80.7 _ 79.8 45.5 I 22. Unit Forced Outage Rate m 10.4 8.S 24.8 f j 24. Shutdowns Scheduled Over Nat 6 Months IType. Dete. Sad Duration of Each t
l l r 1 .

j N/A  !

i i 1 28. If Shut Down At End Of Report Period Estimated Date of Startup: l l 26. Units in Test Status IPrior eo Commercial Operationi: Foreeset Asaie,ed l

I a L l lNITIAL CRITICALITY N/A N/A l INITIAL ELELTRICITY N/A N/A i 1 COMMERCIAL 0PER ATl0N N/A N/A

, bb ('/77) t i .  :