5 Censumers q
NUCLEAR OPERATIONS DEPARTMENT
~
Unit Shutdowns and Power Reductions Report Month Docket Number Unit Date Completed by Telephone
'3ctober 1985 50-155 Big Rock Point Plant Nov. h, 1985' LLBalch (616)547 6537 Ex180 Method of Shutting Duration Down Licensee Event System Comqnt Number Date
- Type, (Hours)
Reason Reactor Report Number Code 4 2
3 Code Cause and Corrective Action To Prevent Recurrence 85-07 09/06/85 0
745.0 C
1 20th Refueling Outage Hours (1322.6 Total Hours)
I 2
3 4
F = Forced Reason:
Method:
Exhibit G = Instructions for S = Scheduled A = Equipment Failure (Explain) 1 = Manual Preparation of Data Entry Sheets B = Maintenance of Test 2 = Manual Scram for Licensee Event Report (LER)
C = Refueling 3 = Automatic Scram File (NUREG 0161)
D = Regulatory Restriction 4 = Other (Explain)
E = Operator Training and License Examination 5Exhibit i = Same Source F = Administrative G = Operational Error (Explain)
H = Omer (ExNain) 8601080464 851031 PDR ADOCK 05000155 Form 3156 1-82 N
wusas.
.sv e >>
s>>
unes.
ss o e o os OY LINDA DILCH l c) 0;ERATING STATU$
rHONE:
616-547-6537, EXT 180 1e UNIT NAZEs BIG COCK POINT NUCLEAR PLANT NOTES:
2 CE70RTING GERIOD:
10 / G5 ap
- 3. LICENSED THERMAL POWER IMWTI:
240 Ce N?.MEPLATE RATING (CROSS MdEls 75 an Se DESIGN ELECTRICAL RATING INET MwEla 72 Oe MIXINUM DEPENDABLE CAPACITY (GROSS MWEls 73.0 l
7e CAXIMUM DEPENDABLE CAPACITY INET MWEls 69.0 83 IF CHANGES OCCUR IN CAPACITY RATING $llTEMS 3 THRU Tl $1NCE LAST REPORT. GIVE REA50N58 gg O
9 F0WER LEVEL TO WHICH RESTRICTED.IF ANY INET MWEls 0.0 10 CEA50NS FOR RESTRICTIONS. IF'ANY:
gg 4
THIS MONTH YEAR-TO-DATE CU"ULATIVE 11e HOURS IN REPORTING PFRIOD 749.0 7296.0 198067.0 123 NU"8ER OF HOUM$ REACTOR WAS CRITICAL 0.0 9436.3 140128.6
- 13. REACTQR RESERVE SHIJTOOWN HOURS 0.0 00 00 gy
- 14. HOUR 5 lGENER ATOR ON-LINE 0.0 5391.4 137589.7
- 15. UNIT RESERVE SHUTOOWN HOURS 0.0 0.0 0.0 1$. GRt$$ THERMAL ENERGY GENERATED IMwHI 0.0 1003092.0 29855647.0 e
17e GRESS ELECTRICAL ENERGY GENERATED IMdHI 0.0 322761.0 8160012 0
- 18. NET ELECTRICAL ENERGY GENERATED (MwHB 0.0 306790.2 7734531.1 10 UNIT SERVICE FACTOR 0.0%
73.9%
69 5%
g, 203 UNIT AVAILABILITY FACTOR 0.0%
73.9%
69.5%
21e UNIT CAPACITY FACTOR (USING MOC NETI 0.0%
60.52 99.12 22e PACTOR IUSING DER NETI 00%
98.0%
94 21 ap 23, 'INIT C AP ACITY UNIT FORCEO OUTAGE RATE 0.0%
0.7%
15.1%
- 24. SHUT 00$NS SCHEOULED DVER NEXT 6 MONTHSITYPE.DATE, C OURATION OF EACHis e
- 25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
e O
O O
O O
O O
G
DAY AVERAGE DAILY POWERtMWTI (MWEN)
(10/851 g
1 0.0 00 m
2 0.0 00 3
0.0 0.0
-4 0.0 0.0 5
0.0 0.0 n.
6 0.0 0.0 7
0.0 00
.p 8
00 0.0 9
0.0 0.0 10 0.0 0.0 p
11 0.0 0.0 12 00 0.0 13 0.0 00 14 0.0 0.0 O
15 0.0 00 16 0.0 0.0 17 0.0 00 0
1s 00 0.0 19 0.0 0.0 20 0.0 0.0 O
at o,o 00 22 0.0 0.0 23 0.0 00 O
24 0.0 00 25 0.0 0.0 26 0.0 0.0 0
27 0.0 0.0 28 00 0.0 29 0.0 0.0 30 00 0.0 31 0.0 0.0 0
0 0
9 O
O O
e o
l 9
9
. ~....
- . v I
Refueling Information Request 1.
Facility name:
Big Rock Point Plant-2.
Scheduled date for next refueling shutdown: October 24, 1986 f-3.
Scheduled date for restart following shutdown: January 2, 1987 4.
Will refueling or' resumption of operation thereafter require a technical specification change or other license amendment?
No j
If yes, explain:
If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review Committee to determine whether any unreviewed safety i
questions as associated with the core reload (Reference-10 CFR,Section I
50.59)? No If no review has taken place, when is it scheduled?
3 5.
Scheduled date(s) for submittal of proposed licensing action and i-supporting information:
4 i
1 6.
Important licensing considerations associated with refueling, eg, new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design new operating procedures:
J i
i l'
i l-7.
' Number of fuel assemblies in: core 84; spent fuel storage pool 192.
8.
Present licensel spent fuel storage capacity:
441 l
Size of any increase in licensed storage capacity that has-been requested or is planned (in number of fuel assemblies):
l 9.
Projected date of last refueling that can be discharged to spent fuel pool l
assuming the present license capacity:
1994 4
5 f
BP0385-0458A-BT01 i
4
,-,.7,
-,-i- -
.m..--.,,-
..,v
,m,x.,
0 i
CODSum8IS OW8f o r woe,.e.
Piant Sorrintendent Big Rock Point Nuclear Plant, Box 591, Route 3, cherlevoix, MI 49720 Director Office of. Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
4 i
Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period October 1 through October 31, 1985.
Sincerely, I
d D P Hoffman Plant Superintendent Enclosures cc: DEVanFarowe, Department of Public~ Health RCallen, Michigan Public Service Commission Michigan Department of Labor INPO Record Center Resident NRC Inspector, Site Document Control, Big Rock Point, 740*22*35*10 RBDeWitt, P24-117B KWBerry, P24-614B File 1
}