ML20136G748

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1985.W/undated Ltr
ML20136G748
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/31/1985
From: Balch L, Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8601080464
Download: ML20136G748 (5)


Text

5 Censumers q

NUCLEAR OPERATIONS DEPARTMENT

~

Unit Shutdowns and Power Reductions Report Month Docket Number Unit Date Completed by Telephone

'3ctober 1985 50-155 Big Rock Point Plant Nov. h, 1985' LLBalch (616)547 6537 Ex180 Method of Shutting Duration Down Licensee Event System Comqnt Number Date

Type, (Hours)

Reason Reactor Report Number Code 4 2

3 Code Cause and Corrective Action To Prevent Recurrence 85-07 09/06/85 0

745.0 C

1 20th Refueling Outage Hours (1322.6 Total Hours)

I 2

3 4

F = Forced Reason:

Method:

Exhibit G = Instructions for S = Scheduled A = Equipment Failure (Explain) 1 = Manual Preparation of Data Entry Sheets B = Maintenance of Test 2 = Manual Scram for Licensee Event Report (LER)

C = Refueling 3 = Automatic Scram File (NUREG 0161)

D = Regulatory Restriction 4 = Other (Explain)

E = Operator Training and License Examination 5Exhibit i = Same Source F = Administrative G = Operational Error (Explain)

H = Omer (ExNain) 8601080464 851031 PDR ADOCK 05000155 Form 3156 1-82 N

wusas.

.sv e >>

s>>

unes.

ss o e o os OY LINDA DILCH l c) 0;ERATING STATU$

rHONE:

616-547-6537, EXT 180 1e UNIT NAZEs BIG COCK POINT NUCLEAR PLANT NOTES:

2 CE70RTING GERIOD:

10 / G5 ap

3. LICENSED THERMAL POWER IMWTI:

240 Ce N?.MEPLATE RATING (CROSS MdEls 75 an Se DESIGN ELECTRICAL RATING INET MwEla 72 Oe MIXINUM DEPENDABLE CAPACITY (GROSS MWEls 73.0 l

7e CAXIMUM DEPENDABLE CAPACITY INET MWEls 69.0 83 IF CHANGES OCCUR IN CAPACITY RATING $llTEMS 3 THRU Tl $1NCE LAST REPORT. GIVE REA50N58 gg O

9 F0WER LEVEL TO WHICH RESTRICTED.IF ANY INET MWEls 0.0 10 CEA50NS FOR RESTRICTIONS. IF'ANY:

gg 4

THIS MONTH YEAR-TO-DATE CU"ULATIVE 11e HOURS IN REPORTING PFRIOD 749.0 7296.0 198067.0 123 NU"8ER OF HOUM$ REACTOR WAS CRITICAL 0.0 9436.3 140128.6

13. REACTQR RESERVE SHIJTOOWN HOURS 0.0 00 00 gy
14. HOUR 5 lGENER ATOR ON-LINE 0.0 5391.4 137589.7
15. UNIT RESERVE SHUTOOWN HOURS 0.0 0.0 0.0 1$. GRt$$ THERMAL ENERGY GENERATED IMwHI 0.0 1003092.0 29855647.0 e

17e GRESS ELECTRICAL ENERGY GENERATED IMdHI 0.0 322761.0 8160012 0

18. NET ELECTRICAL ENERGY GENERATED (MwHB 0.0 306790.2 7734531.1 10 UNIT SERVICE FACTOR 0.0%

73.9%

69 5%

g, 203 UNIT AVAILABILITY FACTOR 0.0%

73.9%

69.5%

21e UNIT CAPACITY FACTOR (USING MOC NETI 0.0%

60.52 99.12 22e PACTOR IUSING DER NETI 00%

98.0%

94 21 ap 23, 'INIT C AP ACITY UNIT FORCEO OUTAGE RATE 0.0%

0.7%

15.1%

24. SHUT 00$NS SCHEOULED DVER NEXT 6 MONTHSITYPE.DATE, C OURATION OF EACHis e
25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

e O

O O

O O

O O

G

DAY AVERAGE DAILY POWERtMWTI (MWEN)

(10/851 g

1 0.0 00 m

2 0.0 00 3

0.0 0.0

-4 0.0 0.0 5

0.0 0.0 n.

6 0.0 0.0 7

0.0 00

.p 8

00 0.0 9

0.0 0.0 10 0.0 0.0 p

11 0.0 0.0 12 00 0.0 13 0.0 00 14 0.0 0.0 O

15 0.0 00 16 0.0 0.0 17 0.0 00 0

1s 00 0.0 19 0.0 0.0 20 0.0 0.0 O

at o,o 00 22 0.0 0.0 23 0.0 00 O

24 0.0 00 25 0.0 0.0 26 0.0 0.0 0

27 0.0 0.0 28 00 0.0 29 0.0 0.0 30 00 0.0 31 0.0 0.0 0

0 0

9 O

O O

e o

l 9

9

. ~....

  • . v I

Refueling Information Request 1.

Facility name:

Big Rock Point Plant-2.

Scheduled date for next refueling shutdown: October 24, 1986 f-3.

Scheduled date for restart following shutdown: January 2, 1987 4.

Will refueling or' resumption of operation thereafter require a technical specification change or other license amendment?

No j

If yes, explain:

If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review Committee to determine whether any unreviewed safety i

questions as associated with the core reload (Reference-10 CFR,Section I

50.59)? No If no review has taken place, when is it scheduled?

3 5.

Scheduled date(s) for submittal of proposed licensing action and i-supporting information:

4 i

1 6.

Important licensing considerations associated with refueling, eg, new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design new operating procedures:

J i

i l'

i l-7.

' Number of fuel assemblies in: core 84; spent fuel storage pool 192.

8.

Present licensel spent fuel storage capacity:

441 l

Size of any increase in licensed storage capacity that has-been requested or is planned (in number of fuel assemblies):

l 9.

Projected date of last refueling that can be discharged to spent fuel pool l

assuming the present license capacity:

1994 4

5 f

BP0385-0458A-BT01 i

4

,-,.7,

-,-i- -

.m..--.,,-

..,v

,m,x.,

0 i

CODSum8IS OW8f o r woe,.e.

Piant Sorrintendent Big Rock Point Nuclear Plant, Box 591, Route 3, cherlevoix, MI 49720 Director Office of. Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

4 i

Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period October 1 through October 31, 1985.

Sincerely, I

d D P Hoffman Plant Superintendent Enclosures cc: DEVanFarowe, Department of Public~ Health RCallen, Michigan Public Service Commission Michigan Department of Labor INPO Record Center Resident NRC Inspector, Site Document Control, Big Rock Point, 740*22*35*10 RBDeWitt, P24-117B KWBerry, P24-614B File 1

}

,i l

  1. q MIO10-0667A-BT01

-.