ML20136G720
| ML20136G720 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 11/01/1985 |
| From: | Martin L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20136G724 | List: |
| References | |
| NUDOCS 8511220420 | |
| Download: ML20136G720 (2) | |
See also: IR 05000298/1985027
Text
,
-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,
,
.
,
'
i
NOV 011985
.
s
.
!
In. Reply Refor To:
i
Docket:
50-298/85-27
.
,
,
!
Nebraska Public Power District
ATTN:
J. M. Pflant, Manager, Technical.
-
Staff-Nuclear Power Group
{
P. O. Box 499
-
Columbus, Nebraska 68601
'
Gentlemen:
This refers.to the inspection conducted by Mr. C. C. Harbuck of this office
"
during the period September 9-13, 1985, of activities authorized by NRC
l
Operating License DPR-46 for Cooper Nuclear Station, and to the discussion of
'
s
our findings with Mr. J. Sayer and other members of your staff at the conclusion
of the inspection.
'
The area examined during the inspection was the implementation of the overall '
<a
maintenance program. Within this area, the inspection consisted of selective
!
'
'
examination of procedures and representative records, interviews with personnel,
,and' observations by.the inspector.
These findings are documented in the
i
F
enclosed inspection report.
j
,
A*
During this inspection, it was found that certain of your activities were.in
violation of NRC requirements.
Consequently, you are. required to respond to
'this violation, in writing, in accordance with the provisions of Section 2.201
'
of the NRC's " Rules of Practice," Part 2. Title 10, code of Federal Regulations.
<
,
Your response should be based on the specifics contained in the Notice of
, Violation enclosed with this letter.
-
,
,
l
The response directed by this letter and the accompanying Notice is not
"
subject to the clearance procedures of the Office of Management and Budget as
,
required by.the Paperwork Reduction Act of 1980, PL 96-511.
,
.
.
1
,
!
<
.
I
!
_
.
1
-
RIV:RPB/A
RP8/
RPB
,
,
j
CCHarbuck;ap
JPJau on
EHJ
on
i
i
70 /D /85
\\0 / A /85
///
5
l
'V
-
1
,
!
B511220420 851101
i
ADOCK 05000298
1
i
,
{
G
yt
1
i
c
i
-
t
- -
-
-
-
-.
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
" Original Signed By1
L E. MARTIN
L. E. Martin, Acting Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
,
2.
Appendix B - NRC Inspection Report
50-298/85-27
cc w/ enclosures:
Paul V. Thomason, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bectoDMB(IE01)
bec distrib. by RIV:
- RPB.
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- SectionChief(RPB/A)
- D. Weiss,LFMB(AR-2015
- R&SPB
- C. C. Harbuck, RPB/A
- MIS System
- RIV File
- RSTS Operator
- w/766
-