Forwards Insp Repts 50-010/85-13,50-237/85-30 & 50-249/85-26 on 850820-1031 & Notice of Violation
ML20136G111
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/15/1985
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20136G116 List:
References
NUDOCS 8511220255
Download: ML20136G111 (2)


See also: IR 05000010/1985013

Text

.

,

.-

bm6

%

.

NOV 151985

Docket No. 50-10

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine inspection conducted by L. G. McGregor, T. M. Tongue,

S. Stasek, and E. A. Hare, of this office on August 20 through October 31, 1985,

of activities at Dresden Nuclear Power Station, Units 1, 2, and 3 authorized by

NRC Operating Licen:;e No. DPR-02, No. DPR-19, and No. DPR-25 and to the discussion

of our findings with Mr. D. Scott and others of your staff at the conclusion of

tha inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

with NRC requirements, as specified in the enclosed Appendix. A written

response is required.

In accordance with 10 CFR 2.790, of the NRC " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosure will

be placed in the NRC Public Document Room.

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

'Originsi signed by N 7, thrfstetfesw

N. J. Chrissotimos, Chief

Projects Branch 2

Enclosure: Inspection Reports

No. 50-010/85013(DRP);

No. 50-237/85030(DRP ; and

No. 50-249/85026(DRP

See Attached Distribution g

0

I l

TGet

E

,

.

Commonwealth Edison Company 2

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

D. J. Scott, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

.

RIII RII

/mj Ch ssotimo:

11/14/85