VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-10 FOR THE MONTH OF OCTOBER,1985 l
0511220224 051031 PDN ADOCK 05000271 l
R pyg E60Y
'll
l OPERATING DATA REPORT Docket No.
50-271 Date 851108 Completed by F.J. Burger Telephone (802) 257-7711 OPERATING STATUS Notes:
1.
Unit Name:
Vermont Yankee 2.
Reporting Period:
October 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A This mcnth Y r-to-Date Cumulative
- 11. Hours in Reporting Period 745.00 7296.00
- 12. Number of Hours Reactor was Critical 0.00 6297.13 93111.06
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 6288.28 90718.35
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 0.00 9550621.00 132109630.50
- 17. Gross Electrical Energy Generated (MWH) 0.00 3166154.00 43955902.00
- 18. Net Electrical Energy Generated (MWH) 0.00 2999402.00 41700250.00
- 19. Unit Service Factor 0.00 86.19 78.93
- 20. Unit Availability Factor 0.00 86.19 78.93
- 21. Unit Capacity Factor (using MDC Net) 0.00 81.57 71.98
- 22. Unit Capacity Factor (using DER Net) 0.00 79.98 70.58
- 23. Unit Forced Outage Rate 0.00
.32 6.92
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
Refueling outage began September 21, 1985 for 32 weeks.
- 25. If shut down at end of report period, estimated date of startup May 9, 1986
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved Initial Criticality Initial Electricity Commercial Operation
c AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-271 Unit Vermont Yankee Date 851108 Completed by F.J. Buraer Telephone (802) 257-7711 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
L_
Dock;t No.
50-271 Unit V?rmont Y.nkee UNIT SHUTDOWNS AND POWER REDUCTIONS Deto 851108 Completed by F. J. Buroer REPORT MONTH October Telephone (802) 257-7711 1
2 3
4 5
No.
Date Typed Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
85-14 851001 S
745 C
1 NA NA NA 1985 RefuelingA4aintenanceAlecirc (cont:
Pipe Replacement Outage in progress.
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
1 a
4 lI re 1 c 1 N
r 7 O
u 7 I
e B
T 1
e 7
C 7
k
. 5 A
2 n J. 2
- a E
0 Y
F
)
V 5
2 I
t y0 T
.n 8 b8 C
o 0
(
E om 1
de R
Nr 1
en R
e 5 t o O
tV 8
eh C
l p kt epe citml onaoe DUDCT I
I T
LU SER NO I
T C
l I
A C
T N
U A
OR N
E E
RB T
OM N
t I
RN A
E M
L D
I I
ET E
A FC L
ON E
A R
EN RE Y
UT T
TN E
AI F
NA A
M S
I I
T N
K P
E I
N U
O Q
N E
Ii
Dockat No. 50-271 Unit Vnrmont Yankee Date 851108 Completed by F.J. Buraer Telephone (802) 257-7711 REPORT MONTH October SLM4ARY OF OPERATING EXPERIENCES Hiahliahts Vermont Yankee operated at 0% of rated thermal power for the month.
Gross electrical generation was O
MWH or 0% of design e
electrical capacity.
Operatina Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
Throughout the reporting period, the plant was shutdown for the 1985 RefuelingA4aintenance/Mecirc Pipe Replacement Outage.
l L
L t
i-
VICRhiONT YANKICIC NucLicAn l'owici< Coi ole ATioN l'. O.110X 157 GOVI:ItNOlt IIUNT ltOAD VEltNON, VEllMONT 03354 VYV 85-479 November 12, 1985 l
N U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555 Dear Sire Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of October,1985.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION
/tu~--
N%y Warren P Murphy Vice President and Manager of Operations WPMgJO/tec:MSR1.lA45R 9+?'A k