ML20136F592

From kanterella
Jump to navigation Jump to search
Requests Extension Until 851030 to Reconcile Book/Physical Inventory Differences Discovered on 850917.Limit of Error Could Be Exceeded for Both Element & Isotope & 9 Kg U-235 Requirements of 10CFR70.53(e)(5)(i).Fee Paid
ML20136F592
Person / Time
Site: 07001100
Issue date: 10/18/1985
From: Lichtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Brown W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20136F597 List:
References
26046, NUDOCS 8511220150
Download: ML20136F592 (2)


Text

78- # 6 0 o

sw 4

s j,

RECEIVEQ s

~

i "Nov1s es3, 3 RETURN TO 396-SS soammusnom)suseusensma Tggurcu -s pg tmu N

O October 18, 1985 t

U. S. Nuclear Regulatory Commission Nuclear Material Control Licensing Branch 7915 Eastern Avenue Mail Stop 881 SS

?,

g Wilste Building u

Silver Spring, Maryland 20910 g

y,

'T O '

m

~

3 Attention: Dr. W. B. Brown, Chief Sr w

Fuel Facility Safeguards Branch 7

5 Gentlemen:

g This letter will confirm a telephone conversation by Mr. T. B. Bowie with Mr. R. Jackson of your staff on October 16, 1985.

Combustion Engineering, Inc., initiated an inventory of Special Nuclear Material on September 17, 1985 and reconciled it on October 16, 1985. The results indicated that our BPID could exceed the limit of error for both element and isotope in addition to the 9 Kg U235 requirement of 10CFR70.53(e)

(5)(1). The BPID would not exceed the 0.5% requirement of 10CFR70.53(e)

(5)(ii). Discussions were held to describe the various avenues to follow in resolving these differences.

To provide for additional time to resolve these differences, it was requested that consideration be given to the granting of an extension until October 30, 1985 to reconcile the inventory and submit the DOE /NRC Fonn 742 - Material Balance Report.

Your consideration to this request is most appreciated. Your office will be advised as to the outcome of this investigation.

4'-

4

~

Very truly yours, e

%mo vm jO g a]

NOV1 s g3, [2 s

A.':;J a a a t....... M.,,,,,,,,,,

h reduna%j"*"8Y 3

.a... 2.0 379 H. V. Lichtenberger

., ; o.s:.. /..pj /M.jd Vice President, Nuclear Fuel \\ f g

.4.

. ra C JM b..

Nuclear Power Systems N.7 a.n. w.w a.,C.

U ac:cacyg.N/.....,,,,,

H/L:avk 0511220150 851010 PDR ADOCK 07001100 C

PDR grjpgllgylp/pk Power Systems 1000 Prospect Hill Road (203) 688 1911

" Combustion Engineenng. Inc Post Offico Box 500 Telex: 99297 Windsor, Connecticut 06035-0500

i

,a f

i 9OCKET NO.

h[

, DOCKET NO.

CONTROL NO.

/ !/ !r$

CONTROL NO._

DATE OF DOC.

II!

_DATE OF D0C.

DATE RCVD.

/

ITUF

PDR,

/

DATE RCVD.

i FCAF LT'DR FCUF pga I/

FCAF Lppg W;I ISE REF.

UliUR SAFEGUARDS _

WM I&E REF. M FCTC

OTHER, hS!UR SATEGUARDS FCTC OTHER DESCRIPTION:

i 9c ty>g

/p I'ESCRIPTION:

kn" dud ' ~ f,W' -

fmM,'-

/

l

' ~ ~ ~ ~

/lllS/'8CIutitAL['Sb INITIAL i

a-j